Wallarah 2 Coal Project

Wallarah 2 Coal Project

The Wallarah 2 Coal Project (or W2CP) was a proposal by the Korea Resources Corporation or KORES (owned by the South Korean government and other Korean and Japanese mining companies that comprise the Wyong Areas Coal Joint Venture) to construct a modern and environmentally advanced longwall mine near Wyong, New South Wales, Australia. It was rejected by the Keneally Government shortly before the 2011 State election which saw the Government defeated.

Contents

Proposal

The exploration areas within which the mining proposal wass situated were awarded to the Wyong Areas Coal Joint Venture by the NSW State Government in 1995 following a competitive tender. Extensive exploration drilling, geological surveys, environmental investigations, stakeholder consultations and other works costing approximately $80 million were undertaken by the proponents. To counter criticism, the proponents launched a Community Liaison Committee which included two representatives from Wyong Shire Council, community groups, other Non Government Organisations and Government agencies. The New South Wales State Government is a major land owner on the Central Coast, through the holdings of State-owned corporation, Landcom.

The proposed mine was to have an annual coal production of 4 to 5 million tonnes of export quality thermal coal per year, over 42 years. Initial construction was due to begin in 2010 with longwall coal production starting in 2012 but these deadlines were missed due to complications arising from community opposition to the proposal.

Proponents claimed the associated coal loader, coal stockpile and rail link would be at least 3 kilometres away from one of the largest urban growth areas on the Central Coast, including the proposed Warnervale town centre.[1]

Opposition and rejection

The proposal was delayed by widespread opposition on the Central Coast with opponents suggesting the project could impact voting at subsequent elections.[2]

The Australian Coal Alliance was formed to oppose the project and has maintained an active public relations campaign against the proposal. It blamed the NSW Labor Party and its supporters to failing to stop the mine.[3]

Former state Labor MP for Wyong David Harris said he was opposed to the mine, adding he was "concerned about the noise and dust impacts on the community and for the future of the Wyong Employment Zone at Warnervale".[4] However, members of the Australian Coal Alliance criticised him for accepting a position as Parliamentary Secretary claiming the position suggested loyalty to the NSW Government, rather than to their campaign.

Before the 2011 State election, the NSW Opposition promised to stop the mine proposal. On the final day of the Keneally Government (the day before the issue of the writs), Minister Tony Kelly announced that the Government had made a decision that the proposal would not go ahead. David Harris attempted to "claim victory" for the proposal rejection but was defeated at the State election.

See also

References

External links


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • Coal mining in Australia — Coal is mined in every state of Australia as well as the Northern Territory. It is used to generate electricity and is exported. 75% of the coal mined in Australia is exported, mostly to eastern Asia. In 2000/01, 258.5 million tonnes of coal was… …   Wikipedia

  • Coal in Australia — Australian Energy resources and major export ports …   Wikipedia

  • Coal companies of Australia — Contents 1 Anglo Coal Australia Ltd 1.1 Anglo Coal Callide Mine 1.2 Anglo Coal Capcoal Mine …   Wikipedia

  • Australian Coal Alliance — The Australian Coal Alliance is a community action group formed to oppose the Wallarah 2 Coal Project proposal in Wyong hinterland, Central Coast by Kores, a company owned by the South Korean Government. The company seeks to mine coal beneath the …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”