Coal companies of Australia

Coal companies of Australia

Contents

This is a list of some of the more notable coal companies of Australia.

Anglo Coal Australia Ltd

Anglo Coal Callide Mine

Callide mine is a leading Queensland domestic coal producer providing low sulphur, sub bituminous thermal coal primarily for domestic power generation. The coalfields cover an area of 176 square kilometres and contain seams up to 26 metres thick. Annual production: 10.7 Mt ROM with 9.5 Mt saleable coal. Reserves: 243 Mt (@ 30.06.06)

Anglo Coal Capcoal Mine

Capcoal operates three underground mines and an open cut mine which all produce premium quality hard coking coal for export steel markets. The majority of coal is mined from the German Creek Formation, noted for containing hard coking coal of exceptionally high quality. The German Creek Sequence contains five coal seam intervals known as the German Creek, Corvus, Tieri, Aquila and Pleiades seams. Annual Production: Capcoal mines 11.8 Mt of coal each year to produce in excess of 8.5 Mt of prime quality hard coking coal. Reserves: Mining leases controlled by Capcoal cover 27,343 hectares and estimated resources exceed one billion tonnes with insitu mineable reserves of 125 Mt.

Anglo Coal Dartbrook Mine

Was a underground mine located north of Muswellbrook.

Anglo Coal Drayton Mine

Drayton is an open cut coal mine, based 13 kilometres south of the town of Muswellbrook in the Upper Hunter Valley in New South Wales, Australia. The mine commenced operation in 1983 and produces approximately 5.5 Mt of thermal coal each year for export and domestic markets. Drayton and the contiguous Saddlers Creek thermal deposit are situated in the Hunter Valley coalfields of the Sydney Basin. Annual production: 2006 5.5 Mt ROM coal, 5.4 Mt saleable coal.. Reserves; 61 Mt proven/probable.

Anglo Coal Foxleigh Mine

Anglo Coal Australia acquired 70% interest in Foxleigh on 29 February 2008. Foxleigh is an open cut operation located adjacent to Anglo Coal Australia’s Capcoal Surface Operation, in the heart of the Bowen Basin in central Queensland. Foxleigh currently produces a low volatile pulverised coal injection (PCI) coal product for use in steelmaking applications around the world. Foxleigh coal is taken from the Middlemount, Tralee, Roper and Pisces seams from within the Rangal coal measures in the southern Bowen Basin. Annual Production: Foxleigh produces approximately 2.5 million tonnes per annum of pulverised coal injection (PCI) coal for the steelmaking industry. The mine’s production capacity is 3.3 million tonnes per annum of product coal. Reserves: Estimated coal resources are approximately 290 million tonnes – Foxleigh and surrounding tenements are the subject of ongoing exploration and feasibility studies.

Anglo Coal Grasstree Mine

Underground Longwall Mine. Approx 4 million TPA. Metallurgical Coal. Near Middlemount Central Queensland.

Anglo Coal Moranbah North Mine

The Moranbah North mine is located in the northern part of Queensland's Bowen Basin around 18 kilometres north of the town of Moranbah. Mining commenced at Moranbah North in 1998. The mining lease covers aAnnual production: 4.5 Mt of hard coking coal . Reserves: 20+ years mine life

Anglo Coal Dawson Mine

Dawson mine, one of Queensland’s leading export coal operations, is owned by the Moura Joint Venture, comprising Anglo Coal Australia Pty Ltd (51 %) and Mitsui Coal Holdings Pty Ltd (49 %). The mine is operated by Anglo Coal Australia. Annual production: 7 Mt. Reserves: Currently 297 Mt, but will increase with the life expectancy of the mine to greater than 25 years.[1]

Bloomfield Collieries Pty Ltd

The Bloomfield Group is an Australian owned group of private companies which operates in the Hunter Valley, New South Wales. The Group has interests in mining and engineering. It operates two open cut coal mines: Bloomfield at East Maitland and Rix’s Creek at Singleton . Rix’s Creek is 5 km north west of Singleton on the New England Highway. It is in the Singleton Council local government area. Situated in the Whittingham Coal Measures, it is part of the Singleton Super Group including the Barrett, Liddell, Arties and Pikes Gully seams (http://www.bloomcoll.com.au). Mines 0.88 million tones per annum.[2]

BHP Billiton

BMA

Jointly owned with Mitsubishi Development Pty Ltd, BHP Billiton Mitsubishi Alliance (BMA) is Australia’s largest coal miner and exporter, and the world's largest supplier to the sea borne coking coal market. BMA's mines are located in the coal rich Bowen Basin of Central Queensland. BMA owns and operates seven Bowen Basin mines – Goonyella Riverside, Broadmeadow, Peak Downs, Saraji, Norwich Park, Gregory Crinum, and Blackwater – and the Hay Point terminal near Mackay. They also manage the South Walker Creek and Poitrel mines, owned by BHP Billiton (80 per cent) and Mitsui and Co. (20 per cent). The mines are located in the coal-rich Bowen Basin of Central Queensland, which covers an area of 75,000 km² of Permian Age marine and freshwater sediments. The basin is roughly triangular in shape, extending around 550 km from its northern peak at Collinsville, southwards to its base at Theodore, where it is approximately 250 km wide. With the exception of the Crinum and Broadmeadow underground longwall operations, our mines are open-cut, using dragline and truck/shovel fleets for overburden removal. Coal seams are mined by front end loader and hydraulic excavators, and coal is transported to mine preparation plants by large capacity haul trucks. BMA Mines :

  1. Blackwater is one of the largest open-cut coal mines in Australia, producing almost 14 million tonnes of coking and thermal coal a year. The mine is located 24 km south of the town of Blackwater and 315 km west of the port of Gladstone.
  2. Broadmeadow Mine, BMA’s newest punch longwall underground operation on the Goonyella Riverside lease, commenced longwall mining in August 2005. Broadmeadow Mine is located 30 km north of Moranbah and 190 km south west of Mackay and has the capacity to produce over three million tonnes of high quality coking coal a year.
  3. Goonyella Riverside produces over 14 million tonnes of coking coal a year. The mine is located 30 km north of Moranbah and 190 km south west of the Hay Point port facilities. It is the northernmost of the mines operated by BMA in the Bowen Basin.
  4. Gregory Crinum is located 60 km north east of the rural centre of Emerald and 375 km north west of Gladstone and comprises the Gregory open-cut operations and Crinum underground mine. Gregory open-cut coal mine became operational in 1979, with the first shipment taking place in 1980. Production has been scaled back since the commissioning of the adjacent Crinum underground longwall mine in 1997.
  5. Norwich Park Mine is located 24 km south east of Dysart and 266 km south west of Mackay. Norwich Park open-cut coal mine began production in 1979 and has a production capacity of 5.5 million tonnes of coking coal and ultra low volatile coal a year.
  6. Peak Downs Mine is located 30 km south of the town of Moranbah and 195 km south west of the Hay Point port facilities. Peak Downs is a large, open-cut mining operation, which was developed in the early 1970s. The first coal was mined in April 1972. Today, Peak Downs has a production capacity of nine million tonnes of coking coal per annum.
  7. Saraji Mine is located 24 km south of Peak Downs mine and 213 km south west of the Hay Point coal export terminal. Construction of the Saraji open-cut coking coal mine began in late 1972 and production began in the latter part of 1974. Saraji has a current production capacity of eight million tonnes of high grade coking coal a year.
  8. South Walker Creek Mine is located on the eastern flank of the Bowen Basin, 35 km west of the town of Nebo and 132 km south west of the Hay Point port facilities. South Walker Creek is a contract mining operation owned by BHP Mitsui Coal. Annual production capacity is 3.2 million tonnes of marketable coal, which is suitable for Pulverised Coal Injection (PCI).
  9. Poitrel Mine is situated south-east of the town of Moranbah, and began open-cut operations in October 2006. It is the most recent mine to be opened for the BHP Mitsui Coal owners, and at full production will have an annual capacity of three million tonnes of coal a year.
  10. Hay Point Coal Terminal, located 38 km south of Mackay, is one of Australia's largest and most efficient coal receival and export facilities. Following a recent expansion program, the terminal has the capacity to handle and despatch around 43-45 million tonnes of coal a year.

The mines managed by the BMA have a capacity to produce 58 million tonnes of coal annually, which are currently sold to over 93 customers in 23 countries, including Japan, the UK, Europe, South America, Korea, Taiwan and India.[3]

Hunter Valley Energy Coal (HVEC)

The Mount Arthur Coal mine is a large open-cut mine near Muswellbrook in the Hunter Valley, New South Wales, Australia .[4]

Centennial Coal Company Ltd

Established in 1989 and listed on the Australian Securities Exchange in 1994, Centennial is a coal mining and marketing company supplying thermal and coking coal to the domestic and export markets. The Company is a major fuel supplier to the New South Wales energy industry, fuelling approximately 46% of the State’s coal-fired electricity.

Mine Locations :

Angus Place Colliery- Located 15 km north west of Lithgow in the Western Coalfield of New South Wales. Nominal annual production capacity exceeds 7.0 million tonnes per annum.

Awaba Colliery- Located near Toronto in the Newcastle Coalfield of New South Wales. Planned production of 770,000 tonnes for the 2009 financial year.

Berrima Coal- Located in the Southern Highlands of New South Wales. Production capacity of up to 250,000 tonnes per annum on a single unit, single shift operation – annual production dependent

Charbon Coal- Located at Kandos in the Western Coalfield of New South Wales. Production capacity of approximately 1.2 million tonnes per annum.

Clarence Colliery- Located near Lithgow in the Western Coalfield of New South Wales. Production capacity of up to 2.5 million tonnes per annum – Australia’s most productive continuous miner operation.

Mandalong Mine - Located near Morisset in the Newcastle Coalfield of New South Wales. Production currently 4.8 million tonnes per annum, peaking at 5.5 million tonnes in 2010 and averaging 5.0 million tonnes per annum thereafter, with production dependent on longwall changeovers (on average three longwall changeovers every 24 months).

Mannering Colliery- Located in the Newcastle Coalfield of New South Wales. Production capacity of 1 million tonnes per annum, targeting 900,000 tonnes for the 2009 financial year.

Myuna Mine- Located in the Newcastle Coalfield of New South Wales. Current production capacity of 1.5 million tonnes per annum − expanding to 2 million tonnes per annum with new unit in the Wallarah Seam.

Newstan Mine- Located in the Newcastle Coalfield of New South Wales. Infrastructure capacity exceeds 4 million tonnes per annum, including a high capacity coal preparation plant, on-site rail loop for transport of domestic and export products and a dedicated haul road to Eraring Power Station.[5]

Coalpac Pty Ltd

Coalpac acquired the assets of the Lithgow Coal Company in February 2008. These assets include the Cullen Valley Mine located in the Western Coalfield of New South Wales, Australia.[6] Coalpac has been operating in the Lithgow district since 1989. The company currently operates the Cullen Valley Open Cut Mine and the Invincible Open Cut Mine.See also effects of the mining operation on surrounding property[7]

Cornwall Coal

The Cornwall Coal Company is a wholly owned subsidiary of Cement Australia. The company operates underground and open cut coal mines, and a coal washing and processing plant, with the main facilities located in NE Tasmania, and a mine in Southern Tasmania . Production of raw coal in 2007/2008 totalled 725 490 tonnes, with 436 544 tonnes of saleable coal being produced.[8]

Donaldson Coal Pty Ltd

Donaldson Coal is a coal producer based in New South Wales, Australia. The mining operations are based in the Hunter Valley just south of Maitland, 25 kilometres from Newcastle and Port Waratah. Production is sourced from three mines.

The mines are:

The Donaldson open cut which commenced operations in 2001. The Donaldson Open Cut Mine is located approximately 23 km from the Port of Newcastle on a mining lease contained within both Maitland and Cessnock Council areas. It is currently Donaldson Coal’s largest operating mine. The Tasman underground mine near Mount Sugarloaf where mining started in 2006. he Tasman Underground Mine is approximately 20 km from Newcastle and 18 km from South Maitland. Entry to the site is off George Booth Drive approximately 1.5 km west of Seahampton. The Mine Lease covers approximately 952 hectares with George Booth Drive to the north, the F3 Freeway to the east and Mount Sugarloaf in the centre. Production commenced in late 2006, following approval by the Minister for Infrastructure and Planning.

The Abel underground mine in the Black Hill area where operations started in March 2008. The Abel Underground Mine is situated 26 km from Newcastle, with the portal coming off the high wall of Donaldson Open Cut Mine. Development consent was granted in June 2007, and mining commenced in March 2008. Once fully developed, the mine will provide employment for up to 375 direct employees from the lower Hunter Region. The mine uses existing surface infrastructure and the Bloomfield Coal Handling and Preparation Plant, rail loader and rail loop for coal processing and loading.[9]

Donaldson open pit coal mine (Donaldson Coal Pty Ltd., 100%) is located 5 km southeast of Maitland, NSW and has an annual rated output of 2.5 million tone .[10]

Enhance Place Pty Ltd

Enhance Place Colliery near Lithgow, NSW. Pine Dale Coal Mine.[11]

Ensham Resources Pty Ltd

Established in 1993 as a joint venture among major international companies and their Australian subsidiaries, Ensham Resources Pty Limited is one of Queensland’s largest and fastest growing thermal coal producers. Ensham’s mining operations currently comprises five open cut coal mining pits: Pits A,B,C & D either side of the Nogoa River - referred to as the ‘Ensham Project’ - and the ‘Yongala’ pit, which is located approximately 5 km to the north of the main Ensham operation. Total combined production is currently in the vicinity of 9 million tonnes per annum (mtpa). Ensham Resources produces around 9 million tonnes per annum of high energy low ash thermal coal and small quantities of semi soft coking coal. The coal is exported to leading energy producers in Japan, Korea, India and China and other countries.[12]

Felix Resources Limited

Felix Resources is an expanding company with a primary focus on the mining of coal and the development and operation of coal related assets. Through this focus Felix Resources aims to ensure high quality and sustainable long-term stakeholder returns. Mines:

a. The Ashton underground and open-cut coal operations are located approximately 12 km north-west of Singleton in the Hunter Valley, New South Wales. The Ashton mines are adjacent to the open-cut mines of Glendell (Xstrata), Camberwell (Vale), Lemington (Rio Tinto), Ravensworth (Xstrata), and Narama (Xstrata). Adjacent underground mines include Glennies Creek (Vale) and Newpac (Xstrata). Felix Resources acquired the interest in the Ashton open-cut and underground projects effective from January 2005. Shortly after, a 30 percent stake was sold to the Singapore based International Marine Corporation Group (IMC) in August 2005. The Ashton Coal operation is an unincorporated joint-venture between Felix Resources (60%), International Marine Corporation Group (30%), and Itochu Corporation of Japan (10%) Felix is the operator of these mines. The Ashton open-cut and underground coal mines have a current production capacity of approximately 3.9 mtpa of high quality soft coking coal. This coal is predominantly exported to Asian steelmakers. Due to restrictions in the Newcastle (PWCS) Port a capacity balancing system (CBS) has been introduced, which will limit all shippers output.

b. The Yarrabee open-cut coal mine is located approximately 40 km north-west of Blackwater in Central Queensland’s Bowen Basin.The Yarrabee coal project has been owned and operated entirely by Felix Resources Limited since July 2003. Yarrabee is a wholly owned subsidiary. The Yarrabee mine is an open-cut coal mine with a capacity to produce 1.7 mtpa of low volatility, high energy, Pulverised Coal Injection (PCI) coal and Thermal coal. The coal which is produced at Yarrabee

c. The Minerva open-cut coal mine is Felix Resources fourth operating mine and is located approximately 45 km south of Emerald in Queensland’s Bowen Basin. The Minerva coal mine is an unincorporated joint-venture with Sojitz Corporation of Japan (45%) and Korea Resources Corporation (4%). Minerva Mining Pty Ltd (subsidiary of Felix) is the manager and operator of this project.The Minerva open-cut mine is a multi-seam mine designed with a production capacity of 2.5 mtpa. Minerva produces a premium thermal coal with a base market of Japan and Korea.

d. The Moolarben coal project is a world class coal asset located 40 km east of Mudgee in the Upper Hunter Valley, New South Wales. This project adjoins the Ulan coal mine (Xstrata/ Mitsubishi) to the north-west and the Wilpinjong coal mine (Peabody) in the east. The Moolarben deposit is an unincorporated joint venture with Sojitz Corporation of Japan (10%), a consortium consisting of Korea Resource Corporation (KORES), Korea Electric Power Company (KEPCO) and four of its generator subsidiaries, Kosep, Komipo, Kowepo and Kospo plus Hanwha Corporation Limited (a total of 10%). Felix owns 80% of the project and will operate the project. The Moolarben resource is approximately 610 million tonnes of high quality open-cut and underground thermal coal with approved capacity of 10 mtpa. The open cut strip ratio is less than 3:1.

e. Felix acquired 100% beneficial ownership of the Harrybrandt exploration project in January 2005. The project is located near Nebo in Queensland’s Bowen Basin. Nearby coal mines are Coppabella (Macarthur), South Walker (BMA) and Moorvale (Macarthur). Harrybrandt is located favourably with regard to established infrastructure and port facilities. f. Athena, located adjacent to the operating Minerva Mine, is an exploration project owned by Felix (51%), Sojitz (45%) and Kores (4%) in an unincorporated joint venture . The tenement area covers 27,000 hectares.

The Inferred Resource is 560 million tonnes. Initial drilling indicates coal of similar or better quality than Minerva. Drilling to date has produced an 11 metre intersection with a washed product of very high quality: NCIG Terminal

Felix Resources is one of six companies involved in the construction of the NCIG terminal which is designed with a final capacity of 66 million tonnes per annum. The first stage is 30 million tonnes per annum.[13]

Foxleigh Mining Pty Ltd

Foxleigh Mining is the operator of a coal mine in central Queensland. The project is a joint venture between Brisbane company CAML Resources (63%), ICRA Foxleigh, part of the Japanese Itochu group (20.6%), and Indigenous Business Australia (IBA) (16.4%).

The mine commenced operations in late 1999 and presently exports coal to steel mills in Korea, Japan, and elsewhere. In July 2004, the mine had between 20-30 Indigenous employees on site among an employee population of approximately 230.[14]

Idemitsu

One of the world¡¯s largest privately owned energy companies with major investments in oil refineries and petroleum products, primarily in Japan. J-Power (formerly Electric Power Development Corporation EPDC) is one of Japan¡¯s largest power utilities. LG International is one of Korea¡¯s largest diversified conglomerates with interests in a vast array of international businesses including electronics. Bligh Coal is a 100% subsidiary of Idemitsu.[15]

Ensham Resources

Queensland’s third largest thermal coal producer and is planning to expand its operations significantly in coming years with a proposed future underground mine in addition to continued expansion of its open cut operations. Idemitsu Australia Resources Pty Ltd and its Australian subsidiary, Bligh Coal Limited which together own 85% of the joint venture, The operator of the mine, Ensham Resources Pty Limited, together with the companyÿs marketing arm, Ensham Coal Sales are based in Brisbane. Idemitsu Australia Resources Pty Ltd and its Australian subsidiary, Bligh Coal Limited which together own 85% of the joint venture. Ensham Resources produces around 9 million tonnes per annum of high energy low ash thermal coal and small quantities of semi soft coking coal. The coal is exported to leading energy producers in Japan, Korea, India and China and other countries.[15]

Illawarra Coal Holdings Pty Ltd

Illawarra Coal produces premium quality, hard coking coal (used in the production of steel) and some energy coal. Based in Wollongong and operating in the Illawarra and Wollondilly regions south of Sydney, New South Wales, Australia. Illawarra Coal operates three high-volume underground longwall mines Appin/Appin West, West Cliff (to the west of the Illawarra Escarpment) and Dendrobium (on the eastern side of the Escarpment).[16]

Appin West

Known as The Douglas Project during its development stages, is an extension to the existing Appin Mine that accesses valuable coking coal reserves to the north of the previous Tower Mine operations. Appin West is situated on Douglas Park Road, near Douglas Park, to the west of Appin, approximately 30 minutes from Wollongong.[17]

a. Appin longwall coal mine (Illawarra Coal Holdings Pty Ltd., operator (BHP Billiton Ltd., 100%)] is located 40 km northwest of Wollongong, NSW and has an annual rated output of 8.8 million tonnes.[17]

b. West Cliff longwall coal mine (BHP Billiton Ltd., 100%) is located 43 km northwest of Wollongong, NSW and has an annual rated output of 2.3 million tonnes.[17]

c. Dendrobium underground coal mine (BHP Billiton Ltd., 100%) is located 15 km southwest of Wollongong, NSW and has an annual rated output of 5.2 million tonnes.[17]

Jellinbah Resources Pty Ltd

Jellinbah Resources Pty Ltd is a company formed by Queensland Coal Mine Management Pty Ltd (QCMM) to develop and market product coals (low volatile PCI coal, semi-soft coking coal and thermal coal) from QCMM coal mines in Queensland. Jellinbah Resources Pty Ltd operate Jellinbah East Mine in the Bowen Basin of central Queensland, Australia. The mine is located on the Tropic of Capricorn and the product coal is hauled by Queensland Rail to the Port of Gladstone, approximately 300 km from the mine. At Jellinbah East resources of Pollux seam coal are substantial, in excess of 350 million tonnes. Production capacity is in excess of 4.0 million tonnes per annum and infrastructure exists to readily increase this production level if required.[18]

Lithgow Coal Company Pty Ltd

Coalpac acquired the assets of the Lithgow Coal Company in February 2008. These assets include the Cullen Valley Mine located in the Western Coalfield of New South Wales, Australia. It is immediately adjacent to the Baal Bone Colliery to the west and the Invincible Colliery to the south, and is approximately 5 km by road from the Mount Piper coal fired power station. The Mine has development consent to produce up to 1 Mtpa, however historical production has been around 700,000 tonnes per annum.[6]

Macarthur Coal

An independent Queensland-based coal mining company with operations located in Queensland's Bowen Basin. Macarthur Coal currently operates out of its Coppabella, Moorvale and Middlemount mines. The company also has an extensive range of prospects for new projects.[19]

Macarthur Coal mines approximately 5.5 million tonnes of raw coal to produce 4.2 million tonnes of product coal each year.[20]

Muswellbrook Coal Company Ltd

Taken over by Muswellbrok Industries Limited.[21]

Idemitsu Muswellbrook Coal a subsidiary of Idemitsu Kosan acquired the entire share capital of Muswellbrook Coal from Muswellbrook Energy and Minerals.[22]

New Hope Corporation Ltd

New Hope is an independent, energy company which has open cut mines at Acland on the Darling Downs and at Rosewood near Ipswich. The New Acland open cut mine is located approximately 150 kilometres west of Brisbane in the Darling Downs region of Queensland. The mining method used at New Acland is an open cut multi-thin-seam operation which utilises trucks, excavators and front-end loaders. Overburden is blasted or ripped by bulldozers prior to extraction. New Oakleigh operates an open cut coal mine near the town of Rosewood, 23 kilometres west of Ipswich and 92 kilometres from the Port of Brisbane. The mining method used at New Oakleigh is a multi-thin-seam operation utilising trucks, excavators and front-end loaders. Overburden is blasted or ripped by bulldozers prior to extraction.[23]

During the fiscal year ended 31 July 2008 (fiscal 2008), total saleable coal production from New Hope’s operations was 4.451 million tons. The New Acland Mine is located 16 kilometers northwest of Oakey on the Darling Downs in South East Queensland and is the Company’s major production source with approximately 3.92 million tons produced during fiscal 2008. The balance of coal production in fiscal 2008, of 531,000 tons came from the New Oakleigh mine in the West Moreton district, near Ipswich. In September 2008, the Company announced the sale of New Saraji Coal project to the BHP Mitsubishi Alliance (BMA).[24]

Peabody Pacific

One of Australia’s largest mining companies with 10 operations in Queensland and New South Wales.

Mines :

A. Queensland hosts six of the mine sites operated by Peabody Pacific. Four of these, Burton, North Goonyella, Eaglefield and Millennium span the length of the Bowen Basin coalfield. The Wilkie Creek mine site operates within the Surat Basin.

a. Burton mine is located in the Bowen Basin, about 150 kilometres south-west of Mackay. Mining commenced in 1996 and now extends over three individual operating pits: Plumtree, Wallanbah and Broadmeadows. The open-cut mine uses the terrace mining technique supported by a truck and shovel fleet. It is operated under contract by Thiess.

b. North Goonyella underground and Eaglefield open-cut mines are located at the northern end of the Bowen Basin, about 160 kilometres west of Mackay. The combined operations produce around three million tonnes (3.3 million tons) of coking coal a year from a lease of 3341 hectares. Mining commenced from the underground in 1994.

c. Millennium mine is located near the town of Moranbah in the Bowen Basin. Mining commenced in May 2006 at a rate of 1.5 million tonnes (1.65 million tons) a year. The mine plans to increase its annual saleable PCI and coking coal production to three million tonnes (3.3 million tons) as port constraints are eased at Dalrymple Bay Coal Terminal. Millennium provides a low ash coking coal and low to mid-volatile PCI coal to customers in Japan, Korea and India.

d. Wilkie Creek mine is located in the Surat Basin of south-east Queensland. Although mining originally started in 1994, Peabody commenced operations in 2005. Currently producing around 1.8 million tonnes (2 million tons) of low sulphur, low nitrogen, environmentally superior thermal coal, plans are under way to ramp up to 2.5 million tonnes (2.8 million tons) in 2008.

B. Peabody Pacific operate four mine sites in New South Wales. These extend from the Hunter Valley coalfields west of Newcastle to the Southern coalfields just below Sydney.

a. Wilpinjong mine is located 10 kilometres south-east of Ulan mine and 40 kilometres north-east of Mudgee. Mining commenced in late 2006; production in 2009 was 8.3 million tons, and Peabody plans to make further investments to increase output.[25]

b. Wambo is one of Peabody's largest operating mines and is located in the Hunter Valley, about 30 kilometres from Singleton. Mining commenced in 1969. Wambo produces around five million tonnes (5.5 million tons) of saleable thermal coal a year.

c. Chain Valley is located in the Newcastle coalfield on the southern shore of Lake Macquarie, around 100 kilometres north of Sydney. The mine is immediately adjacent to Delta Electricity's Vales Point power station, one of Chain Valley's major customers.

d. Metropolitan is located in the Southern coalfields, about 50 kilometres south of Sydney. The coal leases cover an area of 5195 hectares. The mine currently produces around 1.5 million saleable tonnes (1.65 million tons) of hard coking and semi-hard coking coal per year. Reserves provide for a mine life of more than 20 years at current and proposed levels of production.

In 2003 Peabody Energy ships a record 185 million tonnes (204 million tons) of coal to its clients worldwide.[26]

Rio Tinto Coal Australia Pty Ltd

In Queensland, Rio Tinto Coal Australia operates the Blair Athol, Hail Creek and Kestrel Mines and is currently constructing the Clermont Mine Project. In New South Wales, Rio Tinto Coal Australia manages Coal & Allied's operations at Mount Thorley Warkworth, Hunter Valley Operations and Bengalla.

Hail Creek Mine can now produce eight million tonnes of coking coal. Bengalla Mine is a 6.6 million tonne per year open cut operation located about four kilometres west of Muswellbrook. The mine produced 5.9 million tonne of thermal coal in 2005, and has marketable reserves of 154.6 million tonnes. The Hunter Valley coal preparation plant (HVCPP) is consented to receive has a capacity of about 20 million tonnes per annum (Mtpa) run of mine (ROM) coal utilising dense medium cyclones and spirals. The coal preparation plants at MTW have a capacity of 9 million tonnes per annum (Mtpa) of feed yielding about 5.8Mtpa of saleable coal, utilising crushing, screening, dense medium separation, froth flotation.

Vale

Vale’s global coal business is headquartered in Australia includes mining operations in Australia, China, Colombia and Mozambique. In Australia, Vale operates mines in Queensland’s Bowen Basin and the Hunter Valley district of New South Wales with a nominal production capacity of 8Mtpa. Vale is also involved in continuing exploration activities with 7,000km2 of coal exploration assets in Queensland.

Carborough Downs Mine Carborough Downs Mine, near Moranbah in Queensland, is a modern underground longwall operation owned 80% by Vale, with JV partners Nippon Steel 5%, POSCO 5%, Tata 5% and JFE Shoji 2.5%. Carborough Downs produces redominantly semi-hard coking coal coking coal product, with a longwall mining rate on average 5.5 Mtpa ROM to yield approx 3.8Mtpa coking coal and PCI coal. The seam is relatively uniform, ranging 4.5 to 5.7 metres thick. Total resources 280Mt - 300Mt. (est).

Integra Mine Integra Coal is 61.2% owned by Vale, with JV partners Toyota Tsusho Australia 28%, Nippon Steel 3.6%, POSCO 3.6%, JFE Shoji 1.8% and JFE Steel 1.8%. Integra has annual coal production capacity of 5.4 Mtpa of semi-hard, semi-soft and thermal coals from integrated underground and open cut operations. The underground and open cut mine share related infrastructure. Underground and open cut expansions are planned at Integra, which is located in the Hunter Valley region of New South Wales.

Isaac Plains Mine Vale has a 50% ownership of the Isaac Plains Mine, 22 km from Moranbah. Commissioned in late 2006, Isaac Plains is contract mined and has an annual production capacity of 2.8 Mtpa of coking, PCI, and thermal coals. Commissioning of a dragline in 2010 will increase annual capacity to 4.5 Mtpa. The mine has a 15+ year life expectancy.

Wesfarmers Coal Ltd

The Wesfarmers Resources division, with mining interests throughout Australia, is part of Wesfarmers Limited, a major diversified Australian public company. Their coal interests include the Curragh mine in Queensland’s Bowen Basin (metallurgical coal for export markets and steam coal for domestic markets), the Premier Coal mine at Collie in Western Australia’s south west (steam coal for domestic markets), and a 40 per cent interest in the Bengalla mine in the Hunter Valley of New South Wales (steam coal for both export and domestic markets).

The coal interests of Wesfarmers Resources comprise: a. the Curragh mine in Queensland’s Bowen Basin (coking coal for export markets and steam coal for domestic markets) b. the Premier Coal mine at Collie in Western Australia’s south-west (steam coal for the domestic market) c. a 40 per cent interest in the Bengalla mine in the Hunter Valley of New South Wales (steam coal for both export and domestic markets).[27]

Coal production at the mine during the March quarter totalled 2.157 million tonnes, comprising 1.451 million tonnes of metallurgical coal and 706,000 tonnes of steaming coal, down 13.5 per cent on the previous quarter.[28]

Whitehaven Coal Limited

A publicly listed mining company Whitehaven Coal Limited is currently developing and operating coal projects in the Gunnedah Region of New South Wales and exploring other opportunities. The Group operates five open cut mines, Canyon (formerly Whitehaven), Tarrawonga, Werris Creek, Rocglen (formerly Belmont) and Sunnyside and is developing the Narrabri North underground mine.

The Canyon (formerly Whitehaven) open cut mine is located 15 km east of Boggabri. Annual production is up to 1 million tonnes, all of which is exported. The Tarrawonga open cut mine commenced production in 2006. The mine is located 16 km north-east of Boggabri. Mining is by truck and excavator method to produce up to 1.5 million tonnes of export coal per year. The Werris Creek open cut mine is located 4 km south of Werris Creek on the Quirindi road. Werris Creek is mined using truck and excavator producing up to 1.5 million tonnes per annum as raw coal for the export market. The Rocglen mine (formerly Belmont Project) is located 28 km north of Gunnedah on the Wean road the Rocglen open cut mine commenced coal production in late 2008. Using truck and excavator method up to 1.5 million tonnes per annum of coal will be trucked 30 km by road to Gunnedah CHPP for washing & loading then transport by rail to the Port of Newcastle. The Narrabri North underground mine is located between Boggabri and Narrabri within Mining Lease 1609. Initial production using continuous miners will be 1.5 million tonnes per year. Coal production commenced on 28 June 2010 with the train to be loaded for export to Newcastle port around end July 2010. Initial production would be raw coal as Coal Washery needs to be build, which is Stage 2 of the project.The Sunnyside open cut coal mine is located 15 km west of Gunnedah and will produce up to 1 million tonnes per year of raw coal for the export market. Coal production commenced in late 2008.[29]

Xstrata Coal Pty Ltd

Xstrata is a major global diversified mining group, listed on the London and Swiss stock exchanges.

Locations:

  • Westside, New South Wales, Australia- Annual production capacity 800,000 tonnes run of mine coal
  • West Wallsend, New South Wales Australia - Annual production capacity 3 million tonnes run of mine coal
  • Bulga, New South Wales Australia- Annual production capacity 8.3 million tonnes run of mine coal
  • Beltana, New South Wales Australia- Annual production capacity 6.8 million tonnes run of mine coal
  • United - Annual production capacity 3 million tonnes run of mine coal
  • Narama, New South Wales Australia - Annual production capacity 2.5 million tonnes run of mine coal
  • Mangoola, Hunter Valley, New South Wales, Australia
  • Mount Owen - The Mount Owen Complex consists of the Mount Owen, Ravensworth East and Glendell open cut coal mines.
  • Liddell - Liddell Colliery is an established open-cut coal mining operation located at Ravensworth in the Hunter Valley in New South Wales.
  • Cumnock, New South Wales Australia- Annual production capacity 1.4 million tonnes run of mine coal
  • Ravensworth, New South Wales Australia- Annual production capacity 1.8 million tonnes run of mine coal
  • Ulan Coal
  • Baal Bone, New South Wales Australia- Annual production capacity approximately 2.5 million tonnes run of mine coal.[30]

See also

References

  1. ^ http://www.anglocoal.com.au/wps/wcm/connect/AngloCoal/Contact+Us/Anglo+Coal+Mines
  2. ^ http://www.bloomcoll.com.au/Portals/1/Bloomfield_Vol1_ExecSummary.pdf
  3. ^ http://www.bhpbilliton.com/bb/ourBusinesses/metallurgicalCoal/bma/aboutBma.jsp
  4. ^ http://www.bhpbilliton.com/bb/ourBusinesses/energyCoal/mtArthurCoal.jsp
  5. ^ http://www.centennialcoal.com.au/ssl/axs/1/2.asp?recID=152
  6. ^ a b http://cetresources.com/files/Cullen_Valley_Mine_Overview_April_08.pdf
  7. ^ http://www.youtube.com/watch?v=NJ1P2Gicpyw
  8. ^ http://www.cemaust.com.au/driver.asp?page=/our%20company/subsidiaries/cornwall+coal
  9. ^ http://www.doncoal.com.au/
  10. ^ http://www.sourcewatch.org/index.php?title=Australian_coal_mines
  11. ^ http://lithgow.yourguide.com.au/news/local/news/general/more-angst-for-blackmans-flat-residents/447830.aspx
  12. ^ http://www.ensham.com.au/updated/indexhtml.asp
  13. ^ http://www.felixresources.com.au/?p=7
  14. ^ http://www.atns.net.au/agreement.asp?EntityID=2633
  15. ^ a b http://www.ensham.com.au/updated/informationhtml.asp
  16. ^ http://www.bhpbilliton.com/bb/ourBusinesses/metallurgicalCoal/illawarraCoal.jsp
  17. ^ a b c d http://sourcewatch.org/index.php?title=Australian_coal_mines
  18. ^ http://www.jellinbah.com.au/
  19. ^ http://www.macarthurcoal.com.au/Operations/tabid/56/Default.aspx
  20. ^ http://www.abnnewswire.net/multimedia/en/36635/MACARTHUR-COAL-LIMITED.html
  21. ^ http://www.delisted.com.au/Company/5707/MUSWELLBROOK%20COAL%20COMPANY%20LIMITED
  22. ^ http://www.alacrastore.com/deal-snapshot/Idemitsu_Muswellbrook_Coal_Pty_acquires_Muswellbrook_Coal_Co-31488
  23. ^ http://www.newhopecoal.com.au/about-us/profile.aspx
  24. ^ http://www.google.com/finance?q=ASX:NHC
  25. ^ "Peabody Energy Approves Expansion of Highly Productive Wilpinjong Mine in Australia - Mining Top News". http://www.miningtopnews.com/peabody-energy-approves-expansion-of-highly-productive-wilpinjong-mine-in-australia.html. Retrieved 2010-09-13. 
  26. ^ http://www.peabodyenergy.com.au/
  27. ^ http://www.wesresources.com.au/default.aspx?MenuID=101
  28. ^ "Wesfarmers' Curragh coal prices plummet". The Sydney Morning Herald. 20 April 2009. http://news.smh.com.au/breaking-news-business/wesfarmers-curragh-coal-prices-plummet-20090420-ac6w.html. 
  29. ^ http://www.whitehaven.net.au/pages/community.php
  30. ^ http://www.xstrata.com/operation/narama/

Wikimedia Foundation. 2010.

Игры ⚽ Нужен реферат?

Look at other dictionaries:

  • Coal in Australia — Australian Energy resources and major export ports …   Wikipedia

  • Australia and New Zealand Banking Group — Limited Type Public (ASX: ANZ) Industry Banking …   Wikipedia

  • Coal mining in India — Coal reserves in BTUs as of 2009 Coal mining in India has a long history of commercial exploitation covering nearly 220 years starting in 1774 with John Sumner and Suetonius Grant Heatly of the East India Company in the Raniganj Coalfield along… …   Wikipedia

  • Australia — /aw strayl yeuh/, n. 1. a continent SE of Asia, between the Indian and the Pacific oceans. 18,438,824; 2,948,366 sq. mi. (7,636,270 sq. km). 2. Commonwealth of, a member of the Commonwealth of Nations, consisting of the federated states and… …   Universalium

  • Coal power in the People's Republic of China — Entrance to a small coal mine in China. A coal shipme …   Wikipedia

  • Coal-mining region — World coal producers and consumers. Coal reserves in BTUs as of 2009 …   Wikipedia

  • Coal phase out — A coal phase out is a type of fossil fuels policy that dictates the gradual shutdown of operating coal fired power plants while prohibiting construction of new plants. Main Causes Environment Global warming The primary reasons for a government to …   Wikipedia

  • New Hope Coal — New Hope Corporation Limited Type Public (ASX: NHC Industry Resourcess Headquarters Brisbane, Australia Area served …   Wikipedia

  • Rio Tinto Coal Australia — Krupp twin boom portal reclaimer at RTCA Kestrel Mine Rio Tinto Coal Australia (RTCA) is an Australian coal mining organisation, and is part of the worldwide Rio Tinto Group. In Queensland, RTCA operates the Blair Athol, Hail Creek, Kestrel and… …   Wikipedia

  • Coal — Sedimentary Rock Anthracite coal Composition Primary carbon Secondary hydrogen, sulfur …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”