- Interstate 530
Infobox road
state=AR
route=530
type=I
maint=
length_mi=46.65
length_round=2
length_ref= [ [http://www.fhwa.dot.gov/reports/routefinder/table2.htm Route Log - Auxiliary Routes of the Eisenhower National System Of Interstate and Defense Highways - Table 2] ]
year_established=1997 (completed 1999) [ [http://www.kurumi.com/roads/3di/ix30.html#530ar Kurumi.com - Interstate 530] ]
direction_a=South
terminus_a=
junction=
direction_b=North
terminus_b=Jct|state=AR|I|30|I|440|US|65|US|167 inLittle Rock, AR
previous_type=
previous_route=
next_type=
next_route=Interstate 530 (abbreviated I-530) in
Arkansas is a nearly 47 mile (76 km) long spur route from Little Rock at the junction ofInterstate 30 and Interstate 440 in the northwest, to Pine Bluff in the southeast. The current route was formerly designated as U.S. Highway 65; that designation continues. It formally gained the I-530 designation after a full interstate-grade bypass of Pine Bluff (known locally as the Wiley Branton Highway) replaced a less-than-interstate segment of U.S. 65 through Pine Bluff (known locally as the Martha Mitchell Expressway, now U.S. 65B); U.S. 65 was moved to the bypass shortly before it became I-530.A planned extension of the route (away from U.S. 65) continues it to U.S. Highway 278 in
Wilmar, Arkansas ; the first segment of it, from U.S. 278 north to Arkansas 35, opened as atwo-lane freeway called Arkansas Highway 530 on June 6, 2006. [http://www.todaysthv.com/news/news.aspx?storyid=29435] This extension is intended to connect to the proposed southern extension ofInterstate 69 ; U.S. 278 at Wilmar also provides four-lane access to the future I-530 from the much larger cities of Warren and Monticello, thus allowing both cities to champion its completion.Currently the I-530 interchange in Pine Bluff is under construction and is scheduled for completion in late 2010. [ [http://www.jeffersoncountyalliance.com/index.php/site/news_ext/i_69_connector_groundbreaking_signals_change_for_pine_bluff/ Jefferson County Alliance ] ] Also, a segment in the middle stretching from near the Pinebergen community (off U.S. 63 South) to 16 miles south of Pinebergen is under construction, with completion scheduled for 2010 also. The north and south segments between Pine Bluff and Monticello have an anticipated contract date of 2009. [http://www.pbcommercial.com/articles/2008/07/19/news/news1.txt]
Route description
The US Highway 167 junction (Exit 10) only be accessed by southbound I-530 and not northbound. Until a few years ago there was a median crossover to access US 167 South from I-530 North, but this was removed due numerous severe and fatal accidents at the crossover. Northbound I-530 traffic must now use the Bingham Road (Exit 9) exit and cross the overpass to I-530 South.Fact|date=November 2007
Exit list
References
Wikimedia Foundation. 2010.