- Tsukuba Express
The Nihongo|Tsukuba Express|つくばエクスプレス線|Tsukuba Ekusupuresu-sen, or TX, is a
Japan ese railway line of theMetropolitan Intercity Railway Company that linksAkihabara Station inChiyoda, Tokyo andTsukuba Station inTsukuba, Ibaraki . The route was inaugurated onAugust 24 ,2005 . An extension through a deeptunnel toTokyo Station is planned.Fact|date=July 2008Route
*Operator:
Metropolitan Intercity Railway Company
*Length: 58.3 km from Akihabara Station to Tsukuba Station
*Stations: 20
*Gauge: 1,067 mm
*Double-track line: Whole line
*Electrification:
**Akihabara – Moriya: 1,500 V DC
**Miraidaira – Tsukuba: 20,000 V, 50 Hz AC
**Dead section: Moriya - Miraidaira
*Block System: Automatic (ATO with ATC)
*Depot: MoriyaHistory
Initially, the line was to be called "Jōban Shinsen" (New Jōban Line). The reason for the line was to relieve crowding on the
Jōban Line of JR East, which had reached the limit of its capacity. However, with the economic downturn in Japan, the goal shifted to development along the line. Also, the initial plan called for a line from Tokyo to Moriya, but expenses forced the planners to start the line at Akihabara instead of Tokyo, and pressure from the government of Ibaraki Prefecture resulted in moving the extension from Moriya to Tsukuba into Phase I of the construction.The original schedule called for the line to begin operating in 2000, but delays resulted in a 2005 start.
peed
The line has a top speed of 130 km/h, exceeding the 120 km/h top speed of trains on the
Keihin Electric Express Railway , the fastest private railway in the capital region. Rapid service has reduced the time required for the trip from Akihabara to Tsukuba from the previous 1 hour 30 minutes (by theJōban Line , arriving in Tsuchiura, about 15 km from Tsukuba) or 70 minutes (bybus , under optimal traffic conditions) to 45 minutes; from Tokyo, the trip requires 50 – 55 minutes. The line has no grade crossings.An
automatic train operation system allows a single individual to operate the train.Electrification and rolling stock
To prevent interference with the geomagnetic measurements of the
Japan Meteorological Agency at its laboratory in Yasato,Niihari District, Ibaraki , the portion of the line from Moriya to Tsukuba operates on alternating current. For this reason, the trains includeTX-1000 series DC-only trains which can operate between Akihabara and Moriya, andTX-2000 series dual-voltage AC/DC trains which can operate on the entire line.Volume production of the rolling stock began in January 2004, following the completion in March 2003 of two (TX-1000 and TX-2000 series) six-car trains for trial operation and training. The full fleet of 84 TX-1000s (14 six-car trains) and 96 TX-2000s (16 six-car trains) was delivered by January 2005.
tations
:● L: nihongo|Local|普通|Futsū:● S: nihongo|Semi-Rapid|区間快速|Kukan kaisoku:● R: nihongo|Rapid|快速|Kaisoku
All trains stop at stations marked "●" and pass stations marked "-". Some local trains stop at "▲".
Ridership figures
(Source: ["開業3周年を迎えるつくばエクスプレス(TX)" (Tsukuba Express Celebrates its 3rd Anniversary). Tetsudō Daiya Jōhō Magazine, August 2008 issue, p63] )
ee also
List of railway companies in Japan References
External links
* [http://www.mir.co.jp/english_guide.pdf Official Guide] en icon
Wikimedia Foundation. 2010.