Bude Canal

Bude Canal

The Bude Canal was a canal built to serve the hilly hinterland in the Devon and Cornwall border territory in the United Kingdom, chiefly to bring lime-bearing sand for agricultural fertiliser.

It was remarkable in using inclined planes to haul tub boats on wheels to the upper levels. There were only two conventional locks, in the short broad canal section near the sea at Bude itself. It had a total extent of convert|35|mi|km, and it rose from sea level to an altitude of convert|433|ft|m.

The design of the canal influenced the design of the Rolle Canal.

Origins

The coastal area at Bude has sand unusually rich in minerals and the poor agricultural land of the locality was found to benefit considerably from application of the sand. In the pre-industrial age, actually transporting it was difficult, even to land relatively close to the coast.

Several schemes were put forward for canals to bring the sand to the countryside, and these proposals did not lack ambition. One scheme gained parliamentary approval for construction in 1774, but financial problems frustrated the proposal.

In 1818, the West Country canal engineer James Green produced a report for canal's backers,Helen Harris (1996) "The Grand Wester Canal", Devon Books, ISBN 0-86114-901-7] and an Act of Parliament was obtained for this more moderate proposal in 1819. After some difficulties in the construction phase the canal was completed and opened on 8 July 1823Harris H and Ellis M, The Bude Canal, David & Charles (Publishers) Limited, Newton Abbot, 1972, ISBN 0 7153 7018 9] . Its cost was £118,000. [Canal Walks of England and Wales, Quinlan R, Alan Sutton Publishing Limited, Stroud, Glos, 1994, ISBN 0-7509-0608-1]

The canal system

The project:
* improved the difficult exposed sea harbour at Bude
* built a broad canal capable of taking convert|50|ft|adj=on barges for convert|2|mi to Helebridge Basin
* built the rest of the system for tub boats, convert|20|ft long by convert|5|ft|6|in wide
* built a reservoir at Virworthy to feed water to the system

The main line of the canal runs south east from Bude to a wharf near Launceston, with an easterly branch to Blagdonmoor, beyond Holsworthy. There was a northerly feeder arm leading from a new reservoir at Virworthy, called the Tamar Lake.

There were two conventional locks in the short broad canal section, each with a vertical interval of convert|5|ft|6|in. This section terminated at Helebridge, about convert|2|mi from Bude, and ordinary coastal barges travelled this far up the canal.

The tub boats were designed to use the main part of the system, and they generally made the transit from the harbour at Bude, or from Helebridge if trans-shipping from coastal vessels there.

After Helebridge there were three inclined planes to the summit section; the whole of the central part of the system was at this level, convert|433|ft above sea level. The main line to Druxton Wharf, near Launceston negotiated three descending inclined planes as it followed the southerly course of the River Tamar.

Having no intermediate locks on the tub boat sections, the canal had to follow the contours exactly between the inclined planes, and this made its route even more circuitous than most canals. However some relatively ambitious viaducts and earthworks were constructed, particularly where side streams and small valleys entered the main watercourse and its valley.

The inclined planes

The unusual feature of the canal was the six inclined planes. The tub boats had wheels, and on the inclined planes they were pulled up the slopes with the wheels running in channel rails (like a squat letter "U" in section). There were two sets of rails, one for each direction, but it does not appear that a counterbalancing system was used (in which a boat coming down would balance one being pulled up).

The tub boats were hauled up and let down the inclined planes by chains which were operated in most cases by waterwheels; the transit took five minutes or so. There were standby steam engines at some of the inclined planes. However the Hobbacott Inclined Plane used a different system of harnessing water power: water filled a very large bucket and it was simply the weight of the water that pulled the ascending tub boat up the incline. The bucket operated in a deep vertical shaft, and at the bottom a plug was opened and the water ran to waste along an adit which connected to the lower level of the canal; the descending bucket pulled an empty bucket up in the same operation. The full bucket had to be heavy enough to pull a loaded tub boat up the 1 in 4½ gradient as well as overcoming friction, and Green calculated that a weight of about fifteen tons was necessary. This was successful, and the bucket raised a boat up the plane in about four minutes, which was about one half of the time taken when the convert|16|hp standby steam engine was used.

The gradients of the planes differed somewhat, with Hobbacott being the steepest at 1 in 4½ and Vealand being the gentlest at 1 in 8.6.

Tub boats

The tub boats were convert|20|ft long and convert|5|ft|6|in wide, and carried about 20 tons payload; the usage of tub boats was not confined to the Bude Canal. They were commonly operated by coupling between 4 and 6 together and hauling them – by horse power – together. A "train" of boats could therefore be convert|120|ft long, and on the very sinuous alignment of the canal, the train must have been difficult to pass round sharp curves. Steering was possible by manually altering the connection between adjacent boats, using handspikes.

Each boat had four wheels convert|14|in in diameter for running on the inclined planes; the boats were hauled up and down individually.

The operation of lining the tub boats up with the rails, at transfer from canal to plane, must have been difficult. Once engaged with the continuous chain, it would have been impracticable to stop the motion momentarily while the wheels were guided to the rail channels; but no record is available as to how this was achieved.

Operation

On completion of the canal, the owning company was constantly short of cash, and inevitably income did not reach the levels predicted at the stage of promoting the canal. In addition, serious problems with the state of the newly finished works were discovered, although in the circumstances of a locally promoted scheme with novel technological aspects, the canal as built was better engineered than it might have been. The chains on the inclined planes were constantly breaking, the rails broke, and other mechanical failures were frequent, and physical damage from careless boat handling was also common.

However the rich sand was successfully carried to farms near the various wharves in large quantities, and other merchandise was also carried, particularly coal from South Wales. Traffic picked up in the 1880s, and when the London and South Western Railway reached Holsworthy, the canal carried significant volumes of the sand to Stanbury Wharf for onward conveyance by railway; the mile or so between the wharf and the railway station must have been negotiated by horse and cart.

Nonetheless the arrival of the railway soon spelt the ultimate doom of the canal: manufactured fertilisers had become commonplace and cheap, and they could be brought in by railway, so that the demand for the local sand was diminished considerably.

When it became obvious that the canal could not survive, some directors proposed obtaining parliamentary authority for abandonment, or selling the canal outright to the railway company, or anyone else. However legal conditions agreed at the time of construction gave certain landowners rights to take water from the canal, and they would not give up these rights without compensation, so for the time being the proposals for disposal were frustrated. Finally abandonment of the tub boat operation took place on 14 November 1891 with the Launceston main line and the Holsworthy branch being abandoned, but the Feeder arm continuing to be kept open because of the water rights. After protracted negotiations the remainder of the canal was bought by Stratton and Bude Urban District Council, on 1 January 1902, and this enabled them to supply domestic water in due course to the villages in the district from the canal's Tamar reservoir. The works became the responsibility of North Cornwall District Council [http://www.ncdc.gov.uk] when English local government was reorganised in 1974.

The canal today

Today the sea lock is still in working order, and the canal is 'in water' as far as the base of the first inclined plane. The sea lock, though, is the only lock on this section still in working order, so that navigation is not possible along the whole network. Much of the upper section has been ploughed over or has become overgrown, but it is possible to see many remaining signs of the canal's presence, in bridges and wharf buildings. On the feeder branch and on the lower part of the Launceston main line the alignment is indicated on current Ordnance Survey maps. In most cases the alignment is not open to the public, however.

An exhaustive list of locations where the canal's remains can be seen may be found in Harris and Ellis.

Plans for restoration

In 2005 major plans were approved to re-develop the canal, including renewal of the two locks between the sea lock and the first inclined plane. £3.8 million in funding for this project was provided by the Heritage Lottery Fund, Objective One and the South West Regional Development Agency. The plan states that work will start in 2007 and finish in 2009."North Cornwall Matters" North Cornwall District Council - Issue 19 - Autumn/Winter 2006]

Also worthy of note is that the towpath from the Sea Lock is navigable via powered wheelchair or a mobility carriage (with reasonable ground clearance) all the way to where the A39 crosses over it by Helebridge (approx convert|2.5|mi), allowing less mobile users to enjoy the views of the surrounding countryside and wild life. This will also improve when the new tow path extension is completed underneath the A39.

March 2008 Damage

On Monday 10th March 2008 powerful storms wrenched one of the lock gates off its fixings.cite web |url=http://www.ncdc.gov.uk/index.cfm?articleid=27337 |title=Bude Canal Lock Gate emergency tackled swiftly |accessdate=2008-03-21 |format=html |work=North Cornwall District Council Press release] As the water started to drain out, a dam made of sandbags was built. The following day, four tonne concrete pipes were placed in the canal basin to dissipate the power of waves coming in from the sea.

The water continued to flow out until the lower end of the canal was practically empty. This revealed some interesting finds in the mud, including a shotgun.cite web |url=http://news.bbc.co.uk/1/hi/england/cornwall/7292413.stm |title=Sandbags plug storm leak in canal |accessdate=2008-03-21 |format=html |work=bbc news ]

The North Cornwall District Council used the opportunity to repair the canal walls and dredge the basin.cite web |url=http://www.thisiscornwall.co.uk/northcornwall/Counting-cost-canal-repaired/article-186141-detail/article.html |title=Counting the cost as canal is repaired |accessdate=2008-07-14 |format=html |work=cornwall24 ] . During the course of the dredging 6000 cubic meters of silt was removed. The lock gates were closed and the canal started to refill on the 9th of Julycite web |url=http://www.ncdc.gov.uk/index.cfm?articleid=28157 |title=Bude Canal Lock gates are closed to allow Canal to refill |accessdate=2008-07-14 |format=html |work=North Cornwall District Council Press release]

References

External links

* [http://www.bude-canal.co.uk/ Bude Canal & Harbour Society]
* [http://www.marhamchurch.eu/Marhamchurch-Holiday-Trails.htm Description and photos of the Planekeepers Path from Cann Orchard to Thurlibeer (Hobbacott) Incline]


Wikimedia Foundation. 2010.

Игры ⚽ Нужен реферат?

Look at other dictionaries:

  • Bude — For other uses, see Bude (disambiguation). Coordinates: 50°49′26″N 4°32′31″W / 50.824°N 4.542°W / 50.824; 4.542 …   Wikipedia

  • Canal inclined plane — An inclined plane is a system used on some canals for raising boats between different water levels. Typically, such a feature consists of a slope, up which there are two sets of rail tracks. Boats are raised between different levels by sailing… …   Wikipedia

  • Canal — Canals are artificial channels for water. There are two types of canals: water conveyance canals, which are used for the conveyance and delivery of water, and waterways, which are navigable transportation canals used for passage of goods and… …   Wikipedia

  • Canal de Bristol — Saltar a navegación, búsqueda Canal de Bristol (Bristol Channel Môr Hafren) Océano o mar de la IHO (n.º id.: 20) …   Wikipedia Español

  • Bude railway station — Infobox UK disused station name = Bude gridref = SS210059 caption = manager = London and South Western Railway owner = Southern Railway Western Region of British Railways locale = Bude borough = North Cornwall, Cornwall platforms = 2 years = 11… …   Wikipedia

  • Okehampton to Bude Line — Legend …   Wikipedia

  • Grand Western Canal — The Grand Western Canal ran between Tiverton in Devon and Taunton in Somerset in the United Kingdom. The canal had its origins in various plans, going back to 1796, to link the English Channel and the Bristol Channel by a canal, bypassing Lands… …   Wikipedia

  • Rolle Canal — The Rolle Canal (also known as the Torrington Canal) in North Devon, England runs 6 miles from Landcross, where it joins the River Torridge, to the limekilns at Rosemoor.Lost canals and Waterways of Britain Ronald Russell page 96 ISBN 0 7153 8072 …   Wikipedia

  • History of the British canal system — The British canal system of water transport played a vital role in the United Kingdom s Industrial Revolution at a time when roads were only just emerging from the medieval mud and long trains of pack horses were the only means of mass transit by …   Wikipedia

  • Kidwelly and Llanelli Canal — The Kidwelly and Llanelli Canal was a canal and tramroad system in Carmarthenshire, Wales, which was built to carry anthracite coal to the coast for onward transportation by coastal ships. It began life as the Kymer Canal in 1766, was extended… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”