- Fort Canning Tunnel
Fort Canning Tunnel (zh-cp|c=福康宁遂道|p=Fúkāngníng Suìdào), abbreviated as FCT,cite web|url=http://www.worldroads2006.com/technical.htm|title=World Roads Conference 2006 Technical Tours|accessdate=2006-11-25|year=2005|work=
World Roads Conference 2006|publisher=Land Transport Authority &Association of Consulting Engineers Singapore ] is a vehiculartunnel in theCentral Area (Museum Planning Area ) ofSingapore .Besides the utilization of relatively new engineering techniques, special care was taken to minimize impact on the environment of the surrounding
Fort Canning during construction. The original contract for the FCT project was awarded toSato Kogyo for S$25.95 million.cite web|url=http://app.lta.gov.sg/corp_press_content.asp?start=1051|title=Traffic Diversion On Canning Rise And Closure Of Entrance To The Former National Library Building|accessdate=2006-11-25|date=2004-06-29|work=News Releases|publisher=Land Transport Authority ]The FCT was one of four Technical Tours organized by the
Land Transport Authority andAssociation of Consulting Engineers onSeptember 29 2006 during theWorld Roads Conference 2006 held in Singapore.Description
Location
The FCT cuts under Fort Canning Park and an access road, Canning Rise.cite web|url=http://www.onemotoring.com.sg/publish/onemotoring/en/on_the_roads/road_projects/fort_canning.html#MainPar_0033|title=Construction of Fort Canning Tunnel & Realignment of Stamford Road|accessdate=2006-11-25|work=ONE.MOTORING – Road Projects|publisher=
Land Transport Authority ] cite news|url=http://www.todayonline.com/articles/109861.asp|title=Cutting through the hill to Orchard|author=Lin Yanqin|accessdate=2006-11-25|date=2006-03-30 |work=TODAYonline|publisher=MediaCorp Press] The entrance to the tunnel is roughly located on the land housing theOld National Library Building ,cite news|url=http://asia.news.yahoo.com/061122/5/singapore242658.html|title=$40m Fort Canning Tunnel to open in January|accessdate=2006-11-25|date=2006-11-22 |work=Yahoo! Asia News|publisher=Channel NewsAsia ] at the junction ofStamford Road ,Armenian Street and Queen Street. It brings traffic toPenang Road , providing direct access to the Orchard area. The stretch of Stamford Road between Queen Street andBencoolen Street will also be permanently realigned in front of theNational Museum of Singapore after the FCT's construction. Thebedrock of the area was the so-called "Fort Canning Boulder Bed", a stiffclay with huge embeddedboulder s.cite web|url=http://www.laabmayr.at/en/references/road_tunnels/01_25_Singapur_Fort_Canning_Tunnel.php|title=Singapore Fort Canning Tunnel|accessdate=2006-11-25|year=2005|publisher=Consulting Engineers Laabmayr & Partner ZT GmbH]Features
The tunnel is part of a 500 m uni-directional three-lane new road. The FCT itself has a length of 350 m, and will include an
Electronic Road Pricing (ERP) gantry to "close up theOrchard Road ERP cordon". The FCT incorporatescable s to ensure continuedmobile phone andradio coverage. Furthermore, ventilation jets were installed in case oftraffic congestion or fire. The tunnel has nofire exit s, due to the relatively short distance.National Fire Protection Association standards require emergency escapes in tunnels every 300 m. 4closed-circuit TV cameras are installed, 2 of which are inside the tunnel.cite news|url=http://www.todayonline.com/articles/156131.asp|author=Leong Wee Keat|title=Faster trip from town|accessdate=2007-01-23|date=2006-11-22 ]Rationale
The FCT project was based on the
Urban Redevelopment Authority 's plans for theMuseum Planning Area . Over 3,000 vehicles pass through Stamford Road every hour during peak periods. With the old traffic scheme, motorists stopped at 2traffic light s at slow speeds, which made the area prone to congestion. In view of increased traffic from new developments inMarina Centre andMarina South to the Orchard shopping area, design plans for the tunnel were drawn up to allow motorists to bypass several traffic junctions.cite web|url=http://www.mof.gov.sg/budget_2004/exp_overview/exp_over_section3.1.html|title=Expenditure Overview: Ministry of Transport|accessdate=2006-11-25|date=2004-03-10 |work=Singapore Budget 2004|publisher=Ministry of Finance (Singapore) ] The tunnel cuts journey times from 5 minutes to as fast as 18 seconds.The construction of the FCT would form a grid pattern, resulting in more efficient
land use for the adjacentSingapore Management University (SMU) campus. The realignment of Stamford Road would also make the journey to Bras Basah and Little India smoother. By cutting through Fort Canning Hill, the historical and environmental significance of the area would still be preserved.Construction
Construction of the FCT started in October 2003 and is projected to end by January 2007, despite original plans for completion by the end of 2006. The cost of the project was originally set at S$25.95 million,, but this increased to S$34 million and eventually up to S$40 million. The tunnel was opened on
January 16 ,2007 at 6 a.m. SST. [cite news|url=http://www.channelnewsasia.com/stories/singaporelocalnews/view/252688/1/.html|title=Changes to bus lane operating hours from April|author=Noor Mohd Aziz|accessdate=2007-01-23|date=2007-01-15 |publisher=Channel NewsAsia ]Facilitating construction
To make way for the construction process, the old National Library was demolished and moved to its present location along Victoria Street. Sections of Canning Rise were closed twice during the course of construction. First, a stretch of road was closed for 3 months from
July 1 ,2004 . After this, a different section was closed "to facilitate the reinstatement works" of the FCT fromApril 25 2006 for a period of two months. [cite web|url=http://app.lta.gov.sg/corp_press_content.asp?start=1553|title=Temporary Closure Of Canning Rise|accessdate=2006-11-25|date=2006-04-21 |work=News Releases|publisher=Land Transport Authority ] However, this second closure was extended toAugust 31 . [cite web|url=http://app.lta.gov.sg/corp_press_content.asp?start=1642|title=Re-Opening Of Canning Rise|accessdate=2006-11-25|date=2006-08-23 |work=News Releases|publisher=Land Transport Authority ] In addition, a section of Stamford Road was temporarily redirected through the SMU campus nearPrinsep Street during construction before its final realignment in front of the National Museum.Construction method
180 m of the tunnel was constructed using an engineering technique known as the
New Austrian Tunnelling method (NATM), which is similar tomining . The construction team used overlappingsteel pipe roofs as support, withshotcrete lining, thick temporary invert, 2 layers ofmesh , latticegirder s and awatertight PVC membrane. The FCT is the first Singaporean road tunnel to use NATM, which has saved at least 22 trees in Fort Canning Park, [cite web|url=http://www.lta.gov.sg/projects/index_proj_environ.htm|title=Environmental Initiatives - Preserving Our Trees|accessdate=2006-11-25|date=2005-03-17 |publisher=Land Transport Authority ] including a 50-year-old tree. None of the designated 'Heritage Trees' were impacted by the FCT project. The remainder of the tunnel was constructed with the cheaper and more traditionalcut-and-cover method.A professional
arboriculture company, "Arborculture", was employed to assess the risk toflora in the area, as well as provide conservation and management strategies. [cite web|url=http://www.arborsingapore.com/m_portfolio.htm|title=Arborculture Portfolio|accessdate=2006-11-25|publisher=Arborculture ]References
External links
*pdflink| [http://www.onemotoring.com.sg/publish/onemotoring/en/on_the_roads/road_projects/fort_canning.MainPar.0028.File.tmp/Construction%20of%20Fort%20Canning%20Tunnel%20and%20realignment%20of%20Stamford%20Road.pdf ONE.MOTORING Construction/Realignment Map]
Wikimedia Foundation. 2010.