- STS-111
Infobox Space mission
mission_name = STS-111
insignia = Sts-111-patch.png
shuttle = Endeavour
launch pad = 39-A
launch =June 5 ,2002 21:22:49 UTC
landing =June 19 ,2002 17:58:45 UTC EAFB Runway 22
duration = 13 days, 20:35:56
altitude = 122 nautical miles (226 km)
inclination = 51.6 degrees
distance = 5.8 million miles (9.3 million km)
crew_photo = STS-111 crew.jpg
crew_caption = (L-R):Philippe Perrin ,Paul S. Lockhart ,Kenneth D. Cockrell ,Franklin R. Chang-Diaz
previous =STS-110 | next =STS-112 STS-111 was a space shuttle mission to the
International Space Station (ISS) flown by Space Shuttle " Endeavour". STS-111 resupplied the station and replaced theExpedition 4 crew with theExpedition 5 crew. It was launched onJune 5 ,2002 , fromKennedy Space Center ,Florida .Crew
*
Kenneth D. Cockrell (5), Commander
*Paul S. Lockhart (1), Pilot
*Franklin Chang-Diaz (7), Mission Specialist
*Philippe Perrin (1), Mission Specialist -CNES Launched ISS
Expedition 5 crew*
Valery G. Korzun (2)), ISS Commander - RSA
*Peggy A. Whitson (1), ISS Flight Engineer
*Sergei Y. Treshchev (1), Flight Engineer - RSALanded ISS
Expedition 4 crew*
Yuri I. Onufrienko (2}, ISS Commander - RSA
*Carl E. Walz (4), ISS Flight Engineer
*Daniel W. Bursch (4), ISS Flight EngineerNumber in parentheses indicates number of spaceflights by each individual prior to and including this mission.
Mission parameters
*
Mass :
**"Orbiter Liftoff:" 116,523 kg
**"Orbiter Landing:" 99,385 kg
**"Payload:" 12,058 kg
*Perigee : 349 km
*Apogee : 387 km
*Inclination : 51.6°
*Period: 91.9 minDocking with ISS
*Docked:
June 7 ,2002 , 16:25:00 UTC
*Undocked:June 15 ,2002 , 14:32:00 UTC
*Time Docked: 7 days, 22 h, 7 min, 00 sMission highlights
STS-111, in addition to providing supplies, rotated the crews aboard the
International Space Station , exchanging the threeExpedition 4 members (1 Russian, 2 American) for the threeExpedition 5 members (2 Russian, 1 American).The
Multi-Purpose Logistics Module (MPLM) carried experiment racks and three stowage and resupply racks to the station. The mission also installed a component of the Canadarm2 called the Mobile Base System (MBS) to the Mobile Transporter (MT) (which was installed duringSTS-110 ); This completed the CanadianMobile Servicing System , or MSS. This gave the mechanical arm the capability to "inchworm" from the U.S. Lab fixture to the MSS and travel along the Truss to work sites.STS-111 was the last flight of a
CNES astronaut, the French agency having disbanded its astronaut group and transferred them to the ESA.ee also
*
Space science
*Space shuttle
*List of space shuttle missions
*List of human spaceflights chronologically
*List of ISS spacewalks
*List of spacewalks External links
* [http://science.ksc.nasa.gov/shuttle/missions/sts-111/mission-sts-111.html NASA mission summary]
* [http://spaceflight.nasa.gov/spacenews/reports/sts111/index.html Status reports] - DetailedNASA status reports for each day of the mission.
* [http://www.nss.org/resources/library/shuttlevideos/shuttle110.htm STS-111 Video Highlights]
Wikimedia Foundation. 2010.