- Glasgow and Paisley Joint Railway
The Glasgow and Paisley Joint Railway company was formed in 1837 to provide a railway link between
Glasgow andPaisley ,Scotland . It was promoted jointly by theGlasgow, Paisley and Greenock Railway and theGlasgow, Paisley, Kilmarnock and Ayr Railway .With the passing of the
Railways Act 1921 (Grouping Act) the line, together with the Caledonian and Glasgow and South Western railways, became part of theLondon, Midland and Scottish Railway (LMS). The line is still in use today as the eastern end of theInverclyde Line and theAyrshire Coast Line .Formation
Both the Glasgow, Paisley and Greenock Railway (GP&G) (later to become part of the
Caledonian Railway company) and the Glasgow, Paisley, Kilmarnock and Ayr Railway (GPK&A) (later to become part of theGlasgow and South Western Railway company) wished to run their respective railways between Glasgow and Paisley. However, they were told that the necessary Acts of Parliament to build the lines could only gained by forming a joint company to run the line between Glasgow and Paisley. The anticipated problem was obtaining the necessary agreement from the land owners.The GP&G and the GPK&A both received their respective Acts on
15 July 1837 . Due to the failure of the Glasgow, Paisley and Ardrossan Canal to be completed beyondJohnstone , both railway companies were required to start work from both ends of their respective lines.The GPK&A was the first line to open, in September 1840, and GP&G opened in March 1841, due to the difficulties of cutting a tunnel through whinstone at Bishopton.
The Joint Railway line ran from
Glasgow Bridge Street railway station on the south of theRiver Clyde toPaisley Gilmour Street railway station . At Gilmour Street, the GP&G and the GPK&A continued on their separate ways.Glasgow extensions and service redirections
* Central station: Some thirty years later, on
31 July 1879 , the Caledonian Railway opened their new Glasgow terminus at Glasgow Central; the line having been extended across the Clyde via a four-track bridge built bySir William Arrol . Bridge Street station was also refurbished to include two new through platforms leading to Central Station and four bay platforms: two for the Caledonian and two for the Glasgow and South Western.* St Enoch station: Three years earlier, on
1 May 1876 , the City of Glasgow Union Railway opened their new Glasgow terminus atSt Enoch railway station . It used a different crossing over the Clyde. Their new line left the Joint Railway nearShields Junction and continued along the City of Glasgow Union Railway, through theGorbals , and crossed the Clyde at Hutchesontown to St Enoch station; construction of the line having taken 11 years. In 1883, St Enoch railway station became the headquarters of the Glasgow and South Western Railway, by then the owner of the Glasgow, Paisley, Kilmarnock and Ayr Railway, and it moved all its passenger services to St Enoch.* Closure of Bridge Street station: Whilst the Caledonian Railway redirected their London services through Bridge Street station into Central Station, Bridge Street remained the terminus for the Clyde coast services for another twenty five years. After Central Station was refurbished and extended (1901 - 1905) and an additional, eight-track, bridge built over the Clyde, Bridge Street station was closed in 1905 and its remaining services redirected to Central Station. The vacant site of the Bridge Street station bay platforms were used as carriage sidings for Central Station; and the site of the through platforms used for running lines for Central station.
Govan and Princes Dock branches
* A branch was opened to
Govan in 1868.Casserley (1968)] It left the main line at Ibrox.
* Another branch which became thePrinces Dock Joint Railway was added in 1903; it also left the main line at Ibrox and served Glasgow's Princes Dock. It was also accessed via theGeneral Terminus and Glasgow Harbour Railway .Connections to other lines
*At
Shields Junction to City of Glasgow Union Railway
*AtShields Junction toGeneral Terminus and Glasgow Harbour Railway
*AtShields Junction to G&SWR Paisley Canal Branch
*AtShields Junction toPolloc and Govan Railway
*At Ibrox to the Govan Branch of Glasgow and Paisley Joint Railway
*At Ibrox to thePrinces Dock Joint Railway
*At Cardonald toGlasgow and Renfrew District Railway
*AtArkleston Junction toPaisley and Renfrew Railway
*At Paisley Gilmour Street toGlasgow, Paisley and Greenock Railway
*At Paisley Gilmour Street toGlasgow, Paisley, Kilmarnock and Ayr Railway Quadruple tracks
In the 1890s, or later, the original double track line between Bridge Street station and Paisley Gilmour Street station was increased to quadruple tracks.Smith (n/d)]
They were reduced to double tracks during the mid 1960s
railway electrification of what is now known as theInverclyde Line services between Glasgow Central and Gourock and Wemyss Bay.As part of the
Glasgow Airport Rail Link , work started in Autumn 2007 to reinstated a third track betweenShields Junction and Paisley.Present day: Inverclyde and Ayrshire Coast Lines
The Joint Railway line, between Glasgow Central Station and Paisley Gilmour Street, is still in use today as part of the
Inverclyde Line and theAyrshire Coast Line ; although Central station is the only one of the three (mentioned above) Glasgow stations still in existence.The Inverclyde Line was electrified in 1967; with electric Class 311
electric multiple unit (EMUs) rolling stock specially built for the line in 1967, although Class 303 EMUs were also used. During electrification the line lost its quadruple tracks between Shields Junction and Arkleston Junction, the two middle lines were removed.The Ayrshire Coast Line was electrified later in 1985.
British Rail Class 318 EMUs were introduced on the Ayrshire Coast Line, replacing the elderly British Rail Class 101, Class 107 and Class 126diesel multiple unit s. As part of these works, the Slow Lines between Arkleston Junction and Paisley Gilmour Street were taken out of use.Accidents
There was an [http://www.railwaysarchive.co.uk/eventsummary.php?eventID=1241 accident] [cite web
url = http://www.railwaysarchive.co.uk/documents/DoT_Shields1973.pdf
title = Report on the Collision that occurred on 30th August 1973 at Shields Junction in the Scottish Region British Railways
accessdaymonth = 28 August
accessyear = 2007
year = 1977
publisher = Her Majesty's Stationary Office
language = English ] to the west side of Shields Junction on30 August 1973 when an Inverclyde Line service from Wemyss Bay to Glasgow Central crashed into the rear of an Ayrshire Coast Line service from Ayr which was just starting away for a signal.The western end of the line was the scene of a railway accident, on
16 April 1979 , when an Inverclyde Line service from Glasgow Central to Wemyss Bay crossed from the Down Fast Line to the Down Gourock Line at Wallneuk Junction, immediately to the east of Paisley Gilmour Street railway station.Hall, Chapter 6] It collided head-on with an Ayrshire Coast Line special service from Ayr, which had left Platform 2 against a red signal.References
Notes
ources
*
*
*
*
* Hall, Stanley (1999). "Hidden Dangers: Railway Safety in the Era of Privatisation". Shepperton: Ian Allan. ISBN 0-7110-2679-3.
*
*
*ee also
*
Ayrshire Coast Line
*Glasgow Airport Rail Link
*Inverclyde Line
*Paisley Gilmour Street rail crash
* [http://www.railscot.co.uk/Glasgow_and_Paisley_Joint_Railway/frame.htm RAILSCOT on Glasgow and Paisley Joint Railway]
* [http://www.railscot.co.uk/Govan_Branch/frame.htm RAILSCOT on Govan Branch]
* [http://www.railscot.co.uk/Princes_Dock_Joint_Railway/frame.htm RAILSCOT on Princes Dock Joint Railway]
Wikimedia Foundation. 2010.