* closedThe Erewash Valley Line runs from south of
Chesterfield along theErewash Valley to Trent Junction atLong Eaton , joining theMidland Main Line at each end.History
The Erewash Valley Line has historic, but troubled, origins. At the beginning of the
nineteenth century theNottinghamshire coalminers had a lucrative trade withLeicester using theErewash Canal , theRiver Trent and theLeicester Navigation . The Leicester miners had attempted to compete by building theCharnwood Forest Canal but this was unsuccessful. However, in1832 , they opened theLeicester and Swannington Railway .The Nottinghamshire miners already had a tramway, the
Mansfield and Pinxton Railway . They attempted to raise the funds for a railway to Leicester but experienced difficulty in attracting investors. Their ideas developed into a line linkingNottingham toDerby andLeicester which would carry their coal from the Erewash Valley. This was the beginning of theMidland Counties Railway and they attracted the attention ofLancashire andYorkshire financiers. The idea developed further into a connection to theLondon and Birmingham Railway at Rugby. However, a proposed connection from the north of the Erewash toChesterfield was its undoing, since it would compete with theNorth Midland Railway .The building of the Midland Counties Railway went ahead without the Erewash Valley Line. However, in
1844 , theMidland Railway was formed through the amalgamation of the North Midland, the Midland Counties and theBirmingham and Derby Junction Railway . The Midland almost immediately acquired the "Leicester and Swannington" and the "Mansfield and Pinxton".Finally in
1844 they built the Erewash Valley line as far asPinxton in1847 , with a link to theButterley Company 's own railway at Codnor Park in1849 . The line was finally completed to Chesterfield in1862 .It was immediately successful, not only serving the collieries but also the ironworks and brickworks around Ripley, particularly the Butterley Company. By the end of the century, it was also carrying the main line expresses to
Leeds and Settle and Carlisle Line services toScotland , while the main line to Derby served the expresses toManchester , and the main line toNottingham used the Corby line from Kettering and ran through the now closed Old Dalby line diverting nearMelton Mowbray .Present day
With the loss of heavy industry in the area, local traffic contracted massively, yet it continues to be the second most busy freight line in the
East Midlands .*
East Midlands Trains use this route for several of its key business morning and late afternoon services fromSheffield and Leeds to London, the most notable of these, the morning southbound Master Cutler service which travels non-stop from Chesterfield toLondon .
*There is also the inter-urban service that use this route between Nottingham and Chesterfield hourly on theNorwich toLiverpool services.
*Northern Rail from December 2008 will opperate an hourly Nottingham Leeds service on the route.Future
Network Rail as part of a £250 million investment in the regions railways have proposed improvements to the junctions at each end, and resignaling throughout and a new East Midland Control Centre. [cite web|url=http://www.networkrailmediacentre.co.uk/Content/Detail.asp?ReleaseID=3654&NewsAreaID=2&SearchCategoryID=6|title=SECRETARY OF STATE OPENS NETWORK RAIL CONTROL CENTRE|work=Network Rail|accessdate=2008-08-29] As well as renewing the signaling, three junctions at Trowell, Ironville and Codnor Park will be redesigned and rebuilt.Since the existing Midland Main Line from Derby through the Derwent Valley has a number of tunnels and cuttings which arelisted building s and it is a World Heritage Area, it seems that the Erewash line is ripe for expansion. As the new signaling is rolled out, train detection is moving away from the traditionalTrack circuit detection of trains to Axle counting.*Part 1a - North Erewash (Trowell to Coney Green)
*Part 1b - Tapton (Coney Green to Tapton)
*Part 2a - South Erewash (Toton)
*Part 2b - South Erewash (remainder)ummer 2007 Engineering Work
Signaling was renewed at a cost of £56 million over a 19-mile stretch between Trowell and Coney Green Junction via Langley Mill and Alfreton, the railway was closed from 10 June 2007 until 6 August 2007 while the project was completed. Services using this route were diverted via Derby whilst Network Rail undertook the signaling renewals work. Westinghouse Rail Systems engineers installed and tested new signaling equipment along the line, GrantRail Ltd remodelled Trowell Junction, installed the new Ironville Junction and renewed three miles of track in the Stanton Gate to Trowell area and at Ironville. The closure was also used to rebuild three bridges at Langley Mill, Eastwood and Ilkeston. [cite web|url=http://www.networkrailmediacentre.co.uk/Content/Detail.asp?ReleaseID=3081&NewsAreaID=2&SearchCategoryID=6|title=PASSENGER REMINDER - RENEWING THE RAILWAY IN THE EAST MIDLANDS THIS SUMMER|work=Network Rail|accessdate=2008-08-29]