- BC Hydro
Infobox_Company
company_name = BC Hydro
company_
company_type =Crown Corporation
company_slogan = For Generations
foundation =1961
location =British Columbia ,Canada
key_people =Bob Elton , President & CEO [ [http://bchydro.com/info/board_execs/board_execs12078.html Executive team] ]
num_employees = 4,546 (2007)
revenue =
industry =Electricity
products =
homepage = [http://www.bchydro.com/ www.bchydro.com]BC Hydro and Power Authority is a Canadian
electric utility in the province ofBritish Columbia .Commonly referred to as BC Hydro, it is one of the largest electric utilities in
Canada , serving more than 1.7 million customers [ [http://www.bchydro.com/info/reports/reports853.html BC Hydro - Info - Annual Report ] ] in an area containing over 95 percent ofBritish Columbia 's population is mandated to provide, "reliable power, at low cost, for generations." As a provincialCrown corporation , BC Hydro reports to the BC Ministry of Energy, Mines and Petroleum Resources, and is regulated by theBritish Columbia Utilities Commission (BCUC). BC Hydro operates 30hydroelectric facilities and threenatural gas -fueledthermal power plants . About 80 per cent of the province's electricity is produced by major hydroelectric generating stations on the Columbia and Peace rivers. BC Hydro's various facilities generate between 43,000 and 54,000 gigawatt hours of electricity annually, depending on prevailing water levels. [http://www.bchydro.com/info/reports/reports851.html BC Hydro - Info - Reports ] ] BC Hydro's capacity is about 3.3 gigawatts.Electricity is delivered through a network of 18,286 kilometers of transmission lines and 55,254 kilometers of distribution lines. For fiscal 2005, domestic electric sales volume reached 51,205 gigawatt hours. For fiscal 2007, net income was $407 million, which resulted in a return on equity of 13.44 per cent. On March 31, 2007, BC Hydro, its subsidiaries and British Columbia Transmission Corporation had 4,546 employees. [http://www.bchydro.com/info/reports/reports921.html BC Hydro - Info - Quick Facts ] ] Hydro is in strange position as the debt from building the dams, billions of dollars worth, is held by the provincial government and not shown on Hydro's balance sheet.History
BC Electric started as a the
British Columbia Electric Railway (streetcar and lighting utility) in Victoria,Vancouver and New Westminster in 1898. Power was generated by coal fired steam plants. Increasing demand in the Edwardian boom years meant BC Electric sought expansions through Hydro power atBuntzen Lake , and later atStave Lake . Sensible growth and expansion of the power, streetcar andcoal gas utilities meant that BC Electric was a major company in the region.An English financier named Robert Horne-Payne secured the funding and created the large company from what had been a patchwork of small regional steam, hydro and diesel plants.Also at this time, sawmills and factories converted to electricity, further increasing load. BC Electric erected more local hydro stations around the province. Similarly, small towns also built and operated their own power stations. More power AC and DC power lines were strung, though DC was on the way out as it could not travel distances. Dams on the Puntledge, Jordan, and Elk River were built in the 1920s.BC Electric created one of the largest streetcar systems in the world with some 200 miles of track running from Point Grey toChilliwack. There were both city street cars and interurban cars servicing Richmond, Burnaby, Vancouver and North Van. New dams were planned in the 1920s, such as at Seton Portage, but the Great Depression affected business expansion. By the first world war, private cars and jitneys were beginning to affect streetcar traffic. The expansion of private automobile ownership in the 1920s further constrained the expansion of streetcar lines. However, the arrival of the Depression saw an increase in ridership, at the expense of maintenance in the system. Large dam schemes were planned for BC. The war years continued to crimpexpansion or modernization of the streetcar system, thereby, in the post war years smaller street car systems, such as Victoria and North Vancouver, were junked for buses. Vancouversstreetcars were converted to
trolley bus ses, and the interurban system abandoned by 1955. BC Hydro operated the transit system for many years, supporting it with a small levy onthe electric bill, until the transit system was taken over byTransLink .The
post-war years saw increasing government involvement with the power utility. Organizations such as the BC Electrical Commission helped expand its aegis. Finally, BC Hydro was set up in 1962.By this time, BC Hydro had plants at the Hart Dam and Mission Hill, and had commenced vast projects on the Peace River and theColumbia River . [ [http://www.bchydro.com/info/history/history1027.html bchydro.com official site - Company History] ]The Modern Age
Under the leadership of Dal Grauer, BC Hydro became the largest industrial company in BC. It built the first high rise inthe city of Vancouver, and started projects on an unheard of scale. The
W. A. C. Bennett Dam in Hudson's Hope, BC was the center piece of this program. Other dams were planned for the Fraser River, the Stikine, and minor rivers.With increased capacity, Hydro exported power to the US, under theColumbia River Treaty . Large dams,such as the Keenleyside, Mica and Revelstoke-- were built on theColumbia.These power exports became controversial as BC Hydro sells power to California to meet its peak summer load. A separate company called Powerex acts as a power broker and trader andbuys and sells electricity on the spot market. BC is in a consortium with Alberta, Washington, Oregon, Idaho and California and network and generation capacity shared.During the
Enron inducedblackouts in California of 2003, BC Hydro was accused of price gouging.Energy Conservation Initiatives
BC Hydro is currently exploring its options for new capacity. Conservation and retrofitting are favoured items as are
run of river micro and medium hydro generation around the province. Wind turbines are planned for Hecate strait and the Peace District. New coal plants have been discussed while wood waste thermal plants have been approved.Tidal and solar panel options are not emphasized as much. Waiting and looming behind all of this is the third massiveSite C dam at Peace River which Hydro had planned back in the' 1960s.BC Hydro also buys power off industrial companies such as Alcan and Cominco and small regional plants. Hydro has commenced on apower smart program which encourages conservation through insulation, efficient lamps, and removing old fridges.In the spring of 2007, BC Hydro and the
Gulf Islands Film and Television School (GIFTS) embarked on a long term collaboration to promote energy conservation. The first project they launched, called 'Off the Grid', challenged British Columbia high school students to think of new ideas to save energy, on both large and small scales, and create short video spots about their suggestions. It produced sixty four videos in total.The second initiative, called 'Invent the Future', was launched in 2008, this time also in conjunction with an environmental project called 'goBEYOND' (created by several British Columbia universities and funded by the Ministry of Advanced Education and the Climate Action Secretariate). The goal of Invent the Future is to bridge the gap between intent and action among B.C.’s student population interested in reducing energy use. British Columbia youth between the ages of 13-29 are tasked with creating original energy conservation solutions.
References
External links
* [http://www.bchydro.com/ BC Hydro company website]
* [http://www.powerpioneers.com/ Power Pioneers]
* [http://www.bctc.com/ British Columbia Transmission Corporation]
* [http://www.powerpioneers.com/BC_Hydro_History/1860-1929/chronology.aspx/ History: Founding]
* [http://www.powerpioneers.com/BC_Hydro_History/1929-1945/chronology.aspx/ History 1929-45]
* [http://www.powerpioneers.com/BC_Hydro_History/1945-1962/chronology.aspx/ History 1945-62]