- Rimutaka Tunnel
Infobox tunnel
name = Rimutaka Tunnel
caption =
line =Wairarapa Line
location =Rimutaka Ranges ,Wellington ,New Zealand
coordinates =
system =ONTRACK
status = Open
start = Maymorn,Upper Hutt
end = Rimutaka Loop
stations =
open =3 November 1955
close =
owner =ONTRACK
operator = Toll Rail,Tranz Metro
character = passenger/freight
linelength = 8.798km
tracklength =
notrack = single
gauge = 1067mm
el = provided for 1500vDC but not installed
speed = 100km/h
hielevation =
lowelevation=
height =
grade =|The Rimutaka Tunnel is a railwaytunnel throughNew Zealand 'sRimutaka Ranges , betweenMaymorn , nearUpper Hutt , and Featherston, on theWairarapa Line .Length
The tunnel is 8.798 kilometres (5.467 miles) long, the second-longest tunnel in New Zealand, and allegedly the
Southern Hemisphere . It was the longest tunnel in New Zealand, superseding theOtira Tunnel in the South Island, but in 1978 the Kaimai Tunnel (8.88 km, 5.55 miles) nearTauranga opened. It is now the longest tunnel in New Zealand with scheduled passenger trains.History
The tunnel was built as part of a deviation to replace the costly
Rimutaka Incline and its Fell engines, and the first shot was fired in 1948. The deviation opened on3 November 1955 , five days after the incline closed.Design and construction
The deviation's ruling grade is 1 in 70, compensated for curvature. The tunnel rises at 1 in 400 from the western portal to the highest point on the deviation, roughly halfway through the tunnel, and then descends to the eastern portal at 1 in 180. [Keller, 1954; p. 404] It has an internal height of 5.18 metres (17 ft) and a width of 4.68 metres (15 feet 4 inches); it is lined with concrete with a minimum thickness of 38 cm (15 inches) inside the face of the excavation. When the tunnel holed through on
20 April 1954 the surveying error was found to be only 44.5 mm (1.75 inches). [Keller, 1954; p. 413]After its completion, a 2.74 metre (9 ft) diameter vertical ventilation shaft was driven up from a point almost halfway through the tunnel. It reaches the surface beside the
Rimutaka Rail Trail near the former route's Pakuratahi Tunnel. The 117 metre (380 ft) high shaft was constructed after tests showed that the tunnel would not generate enough natural ventilation without it. The original specification using electric locomotives did not require the level of ventilation that was required to clear the tunnel of exhaust fumes generated by the subsequently used diesel traction.The construction of the Rimutaka Tunnel consumed::*Gelignite: 299,258 kg (659,750 lbs),:*Detonators: 327,850,:*Diesel fuel: 3,182,264 litres (700,000 imp. gallons),:*Cement: 26,163 tonnes (25,750 tons),:*Aggregate: 87,837 metres3 (114,886 cu. yd), and:*Timber: 15,820 metres3 (6,703,533 super feet). [Keller, 1954; p. 416]
Traction
Diesel-Electric
The first locomotives to work through the tunnel were the 792 kW DG class - the tunnel was too long for steam locomotives, making the
Wairarapa Line the first fully dieselised line in New Zealand. Today, DBR, DC and DX class locomotives run the route.team
The annual
Daffodil Carnival steam train from Wellington to Carterton has to be hauled by diesel-electrics attached to the front of the steam locomotive between Upper Hutt and Featherston, through the tunnel.Electric
There have been proposals to electrify the tunnel and the Wairarapa line as far north as Masterton as an extension of the Wellington suburban electrification. The tunnel was designed to enable catenary to be installed but this has not happened, and the catenary finishes just north of Upper Hutt station.
Use of the tunnel
Passenger
Tranz Metro operates passenger services named theWairarapa Connection betweenWellington andMasterton via the tunnel five times a day each way Monday to Thursday, six on Friday, and twice a day each way on Saturday, Sunday, and public holidays. Excursion trains also go through the tunnel, such as railway enthusiast specials and trains to the Toast Martinborough festival. Steam-hauled excursions requirediesel locomotive s to provide motive power through the tunnel due to the dangers of smoke in the tunnel's lengthy and confined conditions.Freight
The tunnel is used by some Wellington to Napier freight trains, and for freight from the Wairarapa to Wellington, notably wood products from the Juken Nissho timber mill at Waingawa, just south of Masterton.
Notes
References
* Anon. (1950) " [http://www.ukrailarchive.org/nz/rm08-1950-543.PDF The Rimutaka Incline and Deviation, New Zealand] ", "Railway Magazine", 96 (592: August), p. 543–547
* Keller, G. P. (1954) "The Rimutaka Deviation", "New Zealand Engineering", 9 (12:15 December ), p. 399–420
Wikimedia Foundation. 2010.