The 17th Street Canal is a drainage canal in Greater New Orleans, Louisiana, that flows into Lake Pontchartrain. The canal forms a significant portion of the boundary between the city of New Orleans and Metairie, Louisiana. The canal has also been known as the Metairie Outlet Canal and the Upperline Canal.

Contents

History

The canal that was to become later known as the 17th Street Canal seems to have had its origin at the start of the 1850s as a canal dug through swampy ground to raise a parallel right of way where the Jefferson and Lake Pontchartrain Railway was built. The railway, in business from 1853 through 1864, connected the town of Carrollton, Louisiana (along the Mississippi River front) with a shipping port on Lake Pontchartrain at what became Bucktown, Louisiana, a distance of about 8 km (5.0 mi). At the time, most of the land between the two terminals was undeveloped swamp.

Meanwhile, in 1858, a secondary canal was built to aid in drainage in the low swampy area in "back of town" from Carrollton, with its head at what is now the intersection of Dublin and Palmetto streets, connecting to the Railway canal a short distance on the river side of the Metairie Ridge.

The railway was discontinued on 31 December 1864 as competing rail lines between the river and lake were more successful. The city of New Orleans annexed Carrollton, and the canal became the boundary line between Orleans Parish and Jefferson Parish. As the canal marked the up-river limit of Orleans Parish, it became known as the Upperline Canal.

The spur canal in the back of Carrollton was beside a projected street numbered "17th Street" (although at the time there was little actual development in back of Claiborne Avenue), and that canal was thus the first to be known as the "17th Street Canal", a name which would later come to commonly refer to the large canal which this connected to.

Improved drainage with pumping stations

"Pumping Station 6" astride the Canal from the back (lake) side

By the 1870s, a steam engine powered pump known as the "Dublin Street Machine" at the back of the Carrollton neighborhood was used to drain that neighborhood, pumping the water out the Upperline Canal. Use of the canal to pump water from the streets of the city into Lake Pontchartrain grew with the city. The Claiborne Canal connected with the 17th and Upperline Canal system via a canal along Dublin Avenue; thus the canal served to carry rain water to the lake from the majority of Uptown New Orleans above the New Basin Canal. Another canal, Hoey's Canal, was added connecting to the Upperline from up river to help drain the back of the Jefferson Parish communities along the riverfront, now known as "Old Jefferson".

In 1894, "17th Street" was renamed "Palmetto Street" (later redesignated Palmetto Avenue), but the canal continued to be popularly known by the old street name.

In 1899 a new pumping station was opened atop the Canal a couple blocks back from Metairie Road. In the early 20th century, new high-efficiency pumps designed by A. Baldwin Wood were installed, and remain in operation.

At the start of the 21st century Pumping Station 6, or the Metairie Pumping Station, astride the canal had 15 pumps capable of moving over six billion gallons of water a day through the station. Run off from substantial areas of Uptown New Orleans, Metairie, and surrounding neighborhoods drains into the canals and basins on the River side of the pumping station, which pulls the water up into the portion of the 17th Street Canal flowing in to Lake Pontchartrain.

20th century: Residential development of the "Back of Town"

When the Station 6 was constructed, it was at the "back" end of the developed part of town. As the area alongside the canal closer to the lake was largely undeveloped swamp, it was originally of little concern if waters pumped out of the city topped the canal and flowed into the swamp during heavy rains.

A portion of the 17th Street Canal, looking lakeward from behind the Metairie Road Pumping Station. Note the levees topped with concrete flood walls.

In the late 1920s and the 1930s, a project dredged fill along the lakefront, creating new land in what had been Lake Pontchartrain and creating a sizable levee along the lake side. However no efforts were made to raise the swampland between Metairie Ridge and the new lakefront fill. The areas along the Canal from Metairie Ridge to the Lake were substantially developed for residential use after World War II, and levees along the "back" sections of the Canal were raised. The water level of the canal is often significantly higher than the surrounding streets.

Additional smaller pumping stations were built to add drainage water to the canal from areas along its length.

After Hurricane Betsy, improved flood protection for the city and its canals to cope with storm surge from hurricanes was mandated, resulting in increasing the size and height of the canal levees further.

In 1998 Hurricane Georges elevated the level of Lake Pontchartrain, pushing lake waters into the canal. A report noted that there was at least one place where the water came within inches of topping the floodwall.

An upgrade of the canal levees, floodwalls, and bridges began in 1999. The canal was considered in good shape at the start of the 2005 Atlantic Hurricane Season.

Hurricane Katrina

Water is pumped out of the Lakeview neighborhood of New Orleans into the 17th Street Canal.

At about 6:30 am, a portion of the I-wall along the east side of the 17th Street Canal adjacent to the 6900 block of Bellaire Drive split open, sending torrents of water into New Orleans’ Lakeview neighborhood. The water level in the Canal at the time of failure was about 5 feet lower than the top of the I-wall, well below the design water level. The breach released storm surge floodwaters that destroyed buildings, homes, and infrastructure. The initial breach expanded to a nearly 450-foot wide gap. Thirty-one (31) victims were recovered from areas directly flooded by breach in 17th street canal levee.[1]

Investigations into the breach

On 10 November 2005, an article in the Times-Picayune revealed that sonar soundings discovered that the steel sheet pilings of the levee floodwall were 2.1 m (7 ft) less deep than engineering specifications. Sample pilings pulled up were found to be of the length specified in the design, but it was then revealed that this length was less than the actual depth of the canal, in retrospect an obvious engineering mistake. Current analysis strongly suggests that the catastrophic breach was due to faulty design, rather than storm and water conditions more severe than the levee and storm wall system of the canal was intended to survive.

A few years before Katrina, it also became public knowledge that homes in the area near what would become the breach were experiencing problems with flooding in their yards from seepage from the canal, which they repeatedly reported. The US Army Corps of Engineers the entity responsible for the design and construction of the canal stated afterwards that they had been unaware of this. The Orleans Levee Board which is responsible for maintenance of the canal also claimed to be unaware.

The Interagency Performance Evaluation Task Force confirmed that the canal floodwall failed at significantly lower water level than the top of the floodwall due to faulty design. In August 2007, the Corps announced the results of an engineering analysis applying more stringent post-Katrina design criteria which showed the maximum safe load on some of the surviving floodwalls is only 7 feet (2.1 m) of water, which is half the original 14-foot (4.3 m) design intent.[2]

After Katrina

In January 2006 the U.S. Army Corps of Engineers announced it had finished the temporary repairs of the breached section of the levee, and construction of more permanent repairs would commence.

Louisiana Historic Plaque at 17th Street Canal Breach Site

The Army Corps of Engineers' district commander in New Orleans in October 2010 approved an environmental document Thursday that green lights the agency's plan to shore up faulty floodwalls and levees on the 17th Street Canal.[3] While plans are not finalized, it is likely that a new pumping station will be constructed at the lake edge of the canal, which will serve not only to improve pumping capacity but also to act as a barrier to storm surge and lake flooding; the building would be constructed to act as an additional levee. As a temporary measure until such a new station can be built, the Corps of Engineers constructed storm surge barrier gates and an interim pump station at the lake end of the canal. Staunch critics suggested the pumps have inadequate capacity to prevent the canal from overflowing and predicted failure of both the pumps and gates. In February, 2007, a contract was awarded to WESTON Solutions to increase the pumping capacity of the 17th Street Canal.[4] On September 1, 2008, the gates were closed as Hurricane Gustav approached the Louisiana coast. Both hydraulic and direct drive pumps were operated without problem for several hours during the peak storm surge. The gates remained closed for 18 hours and pumps were operated over a 9-hour period to keep the city from flooding. [5]

Since repairs began, there was discussion possible about expropriation of homes on either side of the canal in order to construct wider and more stable levees at crucial points along its length. On August 8, 2006, the Corps of Engineers began tearing down 14 homes on the Orleans side of the Canal.[6][dead link]

In June, 2008, plans were announced by the Corps of Engineers to clear private land for access to the floodwall and levee. This land comprises the back yards along Bellaire Drive on the New Orleans (east) side of the canal. On July 7, 2008, a state court judge ruled the Corps could continue, but that property owners could seek compensation.[7] Plans to clear encroachments on the west (Jefferson Parish) side of the canal were to begin with field surveys in early 2009.

In August 2010, the grassroots group Levees.org installed a Louisiana State Historic Plaque at the levee breach site. The text of the plaque read as follows:

On August 29, 2005, a federal floodwall atop a levee on the 17th Street Canal, the largest and most important drainage canal for the city, gave way here causing flooding that killed hundreds. This breach was one of 50 ruptures in the federal Flood Protection System that occurred that day. In 2008, the US District Court placed responsibility for this floodwall's collapse squarely on the US Army Corps of Engineers; however, the agency is protected from financial liability in the Flood Control Act of 1928.

See also

References

External links

Coordinates: 30°00′41″N 90°07′19″W / 30.01139°N 90.12194°W / 30.01139; -90.12194


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • 17th Ward of New Orleans — The 17th Ward is one of the seventeen Wards of New Orleans, a section of the city of New Orleans, Louisiana.BoundariesThe Ward stretches from the Mississippi River to Lake Pontchartrain. It is the furthest up river Ward of the city; the upper… …   Wikipedia

  • Orleans Canal — This article is about a canal in New Orleans, La.. For the canal in France, see Canal d Orléans . The Orleans Canal is a drainage canal in New Orleans, Louisiana. The current version of the canal is about 2 km long, running along the up… …   Wikipedia

  • London Avenue Canal — The London Avenue Canal is a drainage canal in New Orleans, Louisiana, used for pumping rain water into Lake Pontchartrain. The Canal runs through the 7th Ward of New Orleans from the Gentilly area to the Lakefront.The Canal was constructed in… …   Wikipedia

  • Canal — Canals are artificial channels for water. There are two types of canals: water conveyance canals, which are used for the conveyance and delivery of water, and waterways, which are navigable transportation canals used for passage of goods and… …   Wikipedia

  • Chesapeake and Ohio Canal — Map of the path of the C O Canal. The Chesapeake and Ohio Canal, abbreviated as the C O Canal, and occasionally referred to as the Grand Old Ditch, [ …   Wikipedia

  • National Register of Historic Places listings in Manhattan below 14th Street — Main article: National Register of Historic Places listings in New York County, New York List of the National Register of Historic Places listings in Manhattan below 14th Street Map of all coordinates from Google …   Wikipedia

  • Erie Canal — at Lockport, New York in 1839 Original owner New York State Principal engineer Ben …   Wikipedia

  • Mott Street (Manhattan) — Coordinates: 40°43′11″N 73°59′47″W / 40.7196°N 73.9963°W / 40.7196; 73.9963 …   Wikipedia

  • History of the British canal system — The British canal system of water transport played a vital role in the United Kingdom s Industrial Revolution at a time when roads were only just emerging from the medieval mud and long trains of pack horses were the only means of mass transit by …   Wikipedia

  • Church Street (Manhattan) — Church Street Station post office Church Street is a short but heavily travelled north/south street in Lower Manhattan in New York City. It runs along the eastern edge of the site of the World Trade Center destroyed in the terrorist attacks of… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”