- Mereni Wind Farm
-
Mereni Wind Farm Country Romania Location Mereni Status Under construction Commission date 2014 (expected) Developer(s) Westwind Turbine information Turbines 30 x 1.5 MW Power generation information Maximum capacity 45 MW As of 19 December 2010 The Mereni Wind Farm is an under construction wind power project in Constanţa County, Romania. It will consist of an individual wind farm with 30 individual wind turbines with a nominal output of around 1.5 MW which will deliver up to 45 MW of power, enough to power over 29,400 homes, with a capital investment required of approximately €50 million.[1]
References
- ^ "Parc eolian la Mereni" (in Romanian). Graiul Dobrogei. 2009-07-18. http://www.graiuldobrogei.ro/articole/2465-parc-eolian-la-mereni.html. Retrieved 2010-12-17.
Wind farms in Romania
≥ 100 MW Sinus Holding - 700 MW · Fântânele-Cogealac - 600 MW · Blackstone - 500 MW · Deleni - 500 MW · Eolica Cogealac - 448 MW · Mărişelu - 300 MW · Eolica Sǎcele - 252 MW · Eolica Casimcea - 244 MW · Văcăreni - 240 MW · Alpha Wind Casimcea - 201 MW · Green Energy - 200 MW · Verbund Casimcea - 150 MW · Sabloal Valea Dacilor - 147 MW · EDP Cernavodă - 138 MW · Eolica Beidaud - 128 MW · Eolica Baia - 126 MW · Eolica Sarichioi - 102 MW · Gheorgheni - 100 MW50-100 MW EDP Peştera - 90 MW · Râmnicu Sărat - 80 MW · Eolica Mihai Viteazu - 80 MW · Eolica Istria - 74 MW · Enel Corugea - 70 MW · Eximprod Galaţi - 70 MW · Eolica Corbu - 68 MW · Eolica Pantelimon - 66 MW · Auşeu-Borod - 65 MW · Eolica Grǎdina - 62 MW · Valea Nucarilor - 60 MW≤ 50 MW Corbiţa - 50 MW · EOL Săcele - 50 MW · Babadag - 48 MW · Roşieşti - 46 MW · Activ Business Casimcea - 45 MW · Mereni - 45 MW · Eolgen Racoviţeni - 45 MW · Blue Investment Baia - 35 MW · Orşova - 35 MW · Enel Agichiol - 34 MW · EDP Sarichioi - 33 MW · Eolus Vind - 30 MW · Sălbatica I - 30 MWCategories:- Proposed wind farms in Romania
- Romanian building and structure stubs
- Wind farm stubs
Wikimedia Foundation. 2010.