Eolica Istria Wind Farm

Eolica Istria Wind Farm

Infobox_Power_Station
station_name=Eolica Istria Wind Farm


caption=
location=Istria, Constanţa County
owner=Eolica
status=Approved
fuel_type=Wind
mine_type=
conveyance=
cooling_water=
technology=
combined_cycle=
turbines=37
reciprocating_engines=
pumped_storage=
max_capacity= 74 MW
commissioned=
decommissioned=
extra=
The Eolica Istria Wind Farm is an proposed wind power project in Istria, Constanţa County, Romania. It will consist of two individual wind farms connected together. It will have 37 individual wind turbines [ [http://www.edch.ch/projects/descriptions.shtml Eolica Dobrogea to build wind farm in the Dobrogea region] ] with a nominal output of around 2 MW which will deliver up to 74 MW of power, enough to power over 47,000 homes, with a capital investment required of approximately US$75 million.

References


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Deleni Wind Farm — Country Romania Location Deleni Status Under construction Commission date 2014 (expected) Developer(s) Midmar Callatis Enol Gro …   Wikipedia

  • Mărişelu Wind Farm — Location Mărişelu, Cluj County Status Approved Commission date 2011 Owner(s) City council …   Wikipedia

  • Mereni Wind Farm — Country Romania Location Mereni Status Under construction Commission date 2014 (expected) Developer(s) Westwind …   Wikipedia

  • Orşova Wind Farm — Location Orşova, Mehedinţi County Status Under construction Commission date 2009 Owner(s) Toplet Energy …   Wikipedia

  • Corbiţa Wind Farm — Location Corbiţa, Vrancea County Status Approved Commission date 2010 Owner(s) Energycum …   Wikipedia

  • List of wind farms in Romania — The Tihuţa Pass is situated at an altitude of 1,200 m (3,900 ft). As of 2008, there is an installed capacity of 76 megawatts (MW) of wind power in Romania, up from the seven MW installed capacity in 2007.[1] …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”