Eolica Mihai Viteazu Wind Farm
- Eolica Mihai Viteazu Wind Farm
Infobox_Power_Station
station_name=Eolica Mihai Viteazu Wind Farm

caption=
location=Mihai Viteazu, Constanţa County
owner=Eolica
status=Approved
fuel_type=Wind
mine_type=
conveyance=
cooling_water=
technology=
combined_cycle=
turbines=87
reciprocating_engines=
pumped_storage=
max_capacity= 174 MW
commissioned=
decommissioned=
extra=The Eolica Mihai Viteazu Wind Farm is an proposed wind power project in Mihai Viteazu, Constanţa County, Romania. It will consist of five individual wind farms connected together. It will have 87 individual wind turbines [ [http://www.edch.ch/projects/descriptions.shtml Eolica Dobrogea to build wind farm in the Dobrogea region] ] with a nominal output of around 2 MW which will deliver up to 174 MW of power, enough to power over 110,000 homes, with a capital investment required of approximately US$ 185 million.
References
Wikimedia Foundation.
2010.
Look at other dictionaries:
Deleni Wind Farm — Country Romania Location Deleni Status Under construction Commission date 2014 (expected) Developer(s) Midmar Callatis Enol Gro … Wikipedia
Mărişelu Wind Farm — Location Mărişelu, Cluj County Status Approved Commission date 2011 Owner(s) City council … Wikipedia
Mereni Wind Farm — Country Romania Location Mereni Status Under construction Commission date 2014 (expected) Developer(s) Westwind … Wikipedia
Orşova Wind Farm — Location Orşova, Mehedinţi County Status Under construction Commission date 2009 Owner(s) Toplet Energy … Wikipedia
Corbiţa Wind Farm — Location Corbiţa, Vrancea County Status Approved Commission date 2010 Owner(s) Energycum … Wikipedia
List of wind farms in Romania — The Tihuţa Pass is situated at an altitude of 1,200 m (3,900 ft). As of 2008, there is an installed capacity of 76 megawatts (MW) of wind power in Romania, up from the seven MW installed capacity in 2007.[1] … Wikipedia