Bavarian Maximilian's Railway

Bavarian Maximilian's Railway
The three Bavarian main lines. The Ludwig South-North Railway is shown in red, the Ludwig's Western Railway is shown in blue, and the Maximilian's Railway in green

The Bavarian Maximilian’s Railway (German: Bayerische Maximiliansbahn) was as an east-west line built between the Bavarian border with Württemberg at Neu-Ulm in the west via Augsburg, Munich and Rosenheim to the Austrian border at Kufstein and Salzburg in the east as part of the Royal Bavarian State Railways. The Munich–Augsburg section of the line had already been built by the Munich-Augsburg Railway Company and opened in 1840. The line was named after the reigning King of Bavaria from 1848 to 1864 Maximilian II.

History

Wappen Bayer.Staatsbahn.jpg

Relatively late for a German state, Bavaria decided in around 1851 to complete its major rail links by building an east-west rail link between the German states and Italy via the Brenner railway and via Salzburg to Vienna and the Semmering railway. These lines were expected to be well used, particularly for the connection to the Austrian Adriatic port of Trieste. Treaties agreed with the Kingdom of Württemberg and with the Austrian Empire on 25 April 1850 and ratified in 1851. The route included, the existing line between Augsburg and Munich, completed by the former private Munich-Augsburg Railway Company in 1840.

The line began at the Württemberg and Bavaria border in the middle of the newly built bridge over the Danube between Ulm and Neu-Ulm, and ran for about 85 km to Augsburg. In Ulm, it connected with the Württemberg Eastern railway to Stuttgart and the Southern railway to Friedrichshafen.

From Munich, the line ran for over 106 km over the route now known as the Mangfall Valley line via Großhesselohe and Rosenheim to Kufstein, where it connected with the Austrian Lower Inn Valley line. The Salzburg line branched off in Rosenheim and ran for 83 km via Traunstein to the border near Salzburg.

Construction

Under a Bavarian law of 4 May 1851 work started on the western section. The 83.7 km long line opened in four sections:

Date Route Length
1 May 1854 Centre of the Danube bridge in Ulm–Neu-Ulm 1.3 km
26 September 1853 Neu-Ulm–Burgau 38.1 km
1 May 1854 Burgau–Dinkelscherben 17.9 km
26 September 1853 Dinkelscherben–Augsburg 26.4 km

Construction of the eastern section was regulated by the Bavarian Law of 7 May 1852. The 188 km long line opened in five sections:

Date Route Length
24 June 1854 München–Großhesselohe 10.7 km
31 October 1857 Großhesselohe–Rosenheim 62.9 km
5 August 1858 Rosenheim–Border at Kufstein 31.9 km
7 May 1860 Rosenheim–Traunstein 53.3 km
1 August 1860 Traunstein–Border at Salzburg 29.5 km

The three years delay in continuing the line from Großhesselohe to Rosenheim was due to the complicated construction of the great 300-metre bridge over the Isar valley there. The foundation work for the bridge foundations and its three 30-meter piers started in 1852. The heavy traffic on the first section led to building of a second track in 1862. From 1871, this section of the line lost its long distance services after the opening of the shorter route via Grafing.

References

  • Ücker, Bernhard (1985) (in German). 150 Jahre Eisenbahn in Bayern (150 years of railways in Bavaria). Fürstenfeldbruck. 
  • Klee, Wolfgang; Welser, Ludwig v. (1993–1995) (in German). Bayern-Report (Bayern-Report). 1–5. Fürstenfeldbruck. 
  • (in German) Die Deutschen Eisenbahnen in ihrer Entwicklung 1835–1935 (The German railways in its development 1835-1935). Berlin: Deutsche Reichsbahn. 1935. 
  • Foit, Wolfgang, ed (2007) (in German). Als die Eisenbahn in unsere Heimat kam. Die Geschichte der Maximiliansbahn München–Holzkirchen–Rosenheim (When the railway came into our home. The story of Maximilian’s Railway, Munich-Holzkirchen-Rosenheim). Holzkirchen. 

Wikimedia Foundation. 2010.

Игры ⚽ Нужна курсовая?

Look at other dictionaries:

  • Bavarian Eastern Railway — The Royal Bavarian Eastern Railway Company ( Königlich privilegirte Actiengesellschaft der bayerischen Ostbahnen ) or Bavarian Ostbahn was founded in 1856. Within just two decades it built an extensive railway network in the eastern Bavarian… …   Wikipedia

  • Bavarian Ludwig Railway — Bayerische Ludwigs Bahn 1835/69 share certificate …   Wikipedia

  • Palatine Ludwig Railway — Mannheim−Saarbrücken Route number: 670 Line n …   Wikipedia

  • Munich–Augsburg Railway Company — The Munich Augsburg Railway Company (München Augsburger Eisenbahn Gesellschaft), the second private railway company in Bavaria, built the Munich–Augsburg line between 1838 and 1840. It was nationalised in 1846 and became part of the Royal… …   Wikipedia

  • Munich–Augsburg railway — Munich–Augsburg Route number: 980, 999.4 Line length: 61.9 Gauge: 1435 Voltage: 15 kV 16.7 Hz AC Maximum speed …   Wikipedia

  • Neustadt–Dürkheim Railway Company — The Neustadt–Dürkheim Railway Company (Neustadt Dürkheimer Eisenbahn Gesellschaft ) or NDE was an early German railway company dating from the final decade of Bavarian independence. It was founded on 22 October 1862, by a committee of leading… …   Wikipedia

  • Munich–Salzburg railway — The Munich–Salzburg railway (German: Bahnstrecke München–Salzburg, line 951 in the official timetable (KBS)) is a 153 kilometre long double track main line of the German railways. It connects Munich with the line to Vienna at Salzburg. At… …   Wikipedia

  • Rosenheim–Kufstein railway — The Rosenheim–Kufstein railway (German: Bahnstrecke Rosenheim–Kufstein) is a 32 kilometre long double track main line of the German railways. It connects the Munich–Salzburg line at Rosenheim with the line to Innsbruck, thus connecting Germany,… …   Wikipedia

  • Royal Bavarian State Railways — As a nation state, Germany did not come into being until the creation of the German Empire in 1871 from the various German speaking states such as Prussia, Bavaria, Saxony, Baden and Württemberg. By then each of the major states had formed its… …   Wikipedia

  • Mittelschwaben Railway — (Günzburg–Mindelheim) Legend …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”