- Narita Rapid Railway
The nihongo|Narita New Rapid Line|成田新高速鉄道線|Narita Shin-Kōsoku Tetsudō-sen is a new rapid rail link under construction between
Tokyo andNarita Airport . The whole line will be operated byKeisei Electric Railway , while some parts of the line are operated by other companies as well. The new service and the trains that will operate them are marketed by Keisei as the nihongo|New Skyliner|新型スカイライナー|"shingata sukairainā", replacing the existing "Skyliner " service.The project involves the refurbishment of 32.3 km of existing track on the
Hokusō Line , as well as the construction of 19.1 km of new track to Narita Airport, partly using disused rights-of-way originally planned for the cancelledNarita Shinkansen project. The total cost, according to the Narita Rapid Rail Access website, is estimated to be ¥1.26 trillion, or about US$10.7 billion. [cite news | last =| first = | coauthors = | title = Narita Rapid Railway | work = | pages = | language = Japanese | publisher = | date = | url = http://www.nra36.co.jp/project/index.html | accessdate = 2006-09-11]When complete in 2010 (planned), trains will also utilize the
Keisei Electric Railway 's Main Line between Keisei Ueno and Keisei-Takasago. Trains are planned to run at a maximum speed of 160 km/h and could thus complete the run from Nippori to the airport in 36 minutes, 15 minutes faster than the current 51 minutes. Through services from Keisei-Takasago toHaneda Airport via theToei Asakusa Line , theKeikyu Main Line and theKeikyu Airport Line are also planned, with the potential to connect the two airports around 65 minutes, as opposed to the current minimum of 106 minutes. [http://www.jiji.com/jc/v?p=ve_soc_airport080809j-02-h410&rel=y&g=tha]There are also plans to build a spur from the
Toei Asakusa Line toTokyo Station , opening a (potentially) faster route from Tokyo Station to the airport through theKeisei Oshiage Line .Basic data
*Length: 51.4 km / Approx. 31.9 mi.
*Operators::1: Already operational.
*Gauge: 1435 mm / 4 ft. 8½ in. (Standard gauge, in contrast to the narrow gauge of most Japanese railways.)
*Double track from Keisei-Takasago to Narita New Town Kita; single track from Narita New Town Kita to Narita Airport
*Electric supply: Whole line (1500 V DC)tations
*
Keisei Takasago Station (connections to Ueno and Oshiage)
*Higashi-matsudo Station
*Shin-kamagaya Station
*Komuro Station
*Chiba New Town Chuo Station
*Inzai-makinohara Station
*Imba nihon-idai Station
*Narita New Town Kita Station
*Airport Terminal 2 Station
*Narita Airport Station References
External links
* [http://www.nra36.co.jp/ Narita Rapid Rail Access Co. Ltd.]
* [http://www.new-skyliner.jp/ New Skyliner]
Wikimedia Foundation. 2010.