The City of London Pedway Scheme was a plan to transform traffic flows in the City of London by separating pedestrians from street level traffic using elevated walkways. First devised as part of the post World War II reconstruction plans for London, it was put into effect in the mid 1960s and eventually abandoned in the 1980s.

History

Versions of the plan had been under consideration since the 19th century, but the scheme was given impetus after World War II, during which London had suffered severe bomb damage. Enthusiasts for the scheme saw an opportunity to put it into practice through the post-war reconstruction programme, and in 1947 architect Charles Holden and planner William Holford developed a blueprint that envisaged a network of first-floor walkways that would connect buildings across the City.[1]

By the mid 1960s, the City of London Corporation had incorporated the scheme into its development plan, and designers of new developments were required to incorporate first-floor access to the Pedway network as a condition of being granted planning consent. As most of the network had not been built, this meant that many developments incorporated unused "dead space" at first-floor level and partial walkways that led to dead ends. In consequence, the scheme was unpopular with many architects.[2]

Buildings that were required to incorporate links to the Pedway included the National Westminster Tower, which incorporated a pedestrian bridge across Bishopsgate that was never used and is now demolished; the Commercial Union building and Draper's Gardens.

By the mid 1980s, the scheme had effectively been discontinued. The reason for its ultimate demise were escalating costs and the increase in influence of the conservation lobby, which opposed the extensive redevelopment of the historic areas of the City. The Pedway scheme only succeeded in establishing itself in areas that required extensive post-war reconstruction. The most extensive part of the network to be completed was in the Barbican Estate and surrounding streets; the main entrance to the Museum of London is, to this day, at first-floor level. Other significant stretches of the Pedway network were built in Lower Thames Street, Cannon Street and around the former Stock Exchange building.

References

  1. ^ http://entertainment.timesonline.co.uk/tol/arts_and_entertainment/article473424.ece
  2. ^ "Architecture of the Gollins Melvin Ward Partnership" SBN 85331 3687

Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Library — Reading room redirects here. For other uses, see Reading room (disambiguation). For other uses, see Library (disambiguation). Reading room of the library at the University of Graz, in Austria …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”