- London and Greenwich Railway
The London and Greenwich Railway was opened in
London between1836 and1838 . It was the first steamrailway to have a terminus in the capital, and the first of any to be built specifically for passenger service.Origins
The idea for the line came from was Colonel G. T. Landmann, until
1824 aRoyal Engineer , and George Walter, and the company was floated at a meeting on the25 November 1831 . An important features was that the line would run from close to London Bridge, thus making it convenient for journeys to the City. The line would be some 3¾ miles (6km), and the plan was to build on a viaduct of 878 brick arches, some of them skew.This was apparently to avoidlevel crossings over the many streets which were already appearing in the south of London. Colonel Landman also planned to rent the arches out as workshops. The intention had been to descend to ground level after the Grand Surrey Canal but this was opposed by Parliament.The first Act of Parliament was obtained in
1833 for a line from Tooley Street (now known as London Bridge) to a station in London StreetGreenwich .The ultimate intention was to reach Dover and there was much talk of a London to Gravesend railway which would extend from Greenwich. A scheme was presented to Parliament in
1836 but five others were competing for acceptance, and the bill failed on its second reading.Construction
The line ran parallel with Tooley Street crossing Blue Anchor Road, Corbetts Lane and the
Grand Surrey Canal . From there it curved towards the first station at Deptford High Street, and thence to London Street in Greenwich.The subsoil was a blackish peat, which gave considerable problems, and Landmann pioneered the use of concrete to reinforce the foundations. Even so, several of the piers near to Corbetts Lane moved four or five inches (100 - 125mm) out of the perpendicular and, on the
18 January 1836 two arches close to Tooley Street collapsed. Elsewhere, iron ties were used to prevent lateral spread in the brickwork. In1840 many of the arches were improved by laying convert|9|in|mm of concrete above the arches, with a layer of asphalt.From Deptford to Greenwich, the
River Ravensbourne was crossed atDeptford Creek by means of a balanced bridge to allow masted vessels to pass by. When it worked eight men were enough to operate it, but possibly because of trouble with the foundations, it was unreliable. It was replaced in1884 and again in1963 [ [http://www.portcities.org.uk/london/server/show/ConMediaFile.445/Raising-DeptfordCreek-Railway-Bridge.html Raising Deptford Creek Railway Bridge. - Port communities - Port Cities ] ] .Originally the track used single parallel rails to the Stephenson gauge of RailGauge|ussg, fixed to stone blocks or sleepers. By
1840 it would seem, however, that there was a mixture of bridge rails, single parallel and double parallel rails (See Rail profile). The original rails caused excessive noise, and also damage to structure and rolling stock. The bridge rails were used on the viaducts, between Deptford and Greenwich initially, laid on longitudinal timbers with cross sleepers at four foot intervals. At this time, the new double parallel rails at 78lb. to the yard were laid for a quarter of mile (400m) at Deptford, on timber sleepers, presumably as an experiment. In addition the concrete underlay was replaced with gravel ballast to convert|2|ft|mm thickness.Opening
The first section, between Spa Road in Bermondsey and Deptford, opened on
8 February 1836 . However, previously to this, a number of demonstration trains had been running from mid-1835. These were suspended for a while after a derailment in November, but resumed the following year, with somewhat apocryphal rumours circulating that some trains had reached convert|60|mph|km/h. On the Whit Monday following the official opening, the line carried around 13,000 passengers. There was a fatal accident on the7 March , when Daniel Holmes was run over, and a train collided with some carriages.The line reached Bermondsey Street in October, and finally to London Bridge on
14 December 1836 (Spa Road was no longer used as a stop at this time). At the other end, the line reached a temporary station at Church Row in Greenwich on24 December 1838 , having been delayed by problems with the Deptford Creek lift bridge. The present Greenwich station opened on12 April 1840 .Rolling stock
The first locomotives were a
2-2-0 built byCharles Tayleur and Company and three more by William Marshall of Gravesend of which one was2-2-2 . All would appear to be of the Stephenson "Planet" type. These were supplemented by two from Bury but subcontracted toGeorge Forrester and Company These were groundbreaking in that for the first time horizontal cylinders were mounted at the front of the locomotive outside the frame. While extremely successful for their time, they swayed so much they were referred to as "Boxers" and a trailing axle was added. In the next four years three more locos followed, one each byR and W Hawthorn andRobert Stephenson and Company , with three axles, and one byDay, Summers and Company . This latter one was also modified with a trailing axle soon after delivery.First and second class coaches were provided and were unusual in that the sole bars and headstocks were below the axles. The railway line, being for much of its length built on a viaduct, this was a safety measure, since, in the event of a derailment, the coaches would drop only a few inches onto the rails.
Later history
Between
1836 and1840 the line carried over 1¼ million passengers a year, benefiting it is thought from a developing tourist trade.On
5 June 1839 , theLondon and Croydon Railway opened. It shared the line between Tooley Street as far as a junction at Corbetts Lane (close to what is now Rotherhithe Road). It built its station between the existing station and Tooley Street. It is not clear when the station became known as London Bridge.It is believed that at Corbetts Lane there was installed first fixed signal used to control a junction. A white disc was installed, to be operated by the pointsman. This, or at night, a red light, showed that the route was set for Croydon. If the disc was edge on, or a white light showed, the junction was set for Greenwich.
In
1840 two further acts were obtained, one for laying additional lines as far as the junction at Corbetts Lane and for improvements and extensions to the stations at London Bridge. These were watched closely by a committee formed by the Croydon line, the Brighton line and the proposed South Eastern Railway. At this time the Greenwich and the Croydon Lines exchanged places to prevent crossing each other at Corbetts Lane. A resited station at Spa Road opened in1842 .By
1843 annual passenger numbers had risen to over 1½ million, with an average fare per head of 6.5d. In1844 numbers had risen to over 2 million although the average fare had dropped to 5.2d. Greenwich trains ran every 15 minutes, Croydon trains were hourly. Increasing congestion at London Bridge, and dissatisfaction with the high tolls charged by the London & Greenwich, caused the South Eastern and the London & Croydon to build a new terminus atBricklayers Arms which they used until1852 .In
1845 control of the London Greenwich passed to the South Eastern Railway.Greenwich
Greenwich was the other terminus until
1878 , when the finalcut-and-cover tunnel section between Greenwich and Maze Hill was opened, linking it to theNorth Kent Line just west of Charlton. This ran beneath the grounds of theQueen's House andGreenwich Hospital - where the graveyard was excavated, remains being reinterred inEast Greenwich Pleasaunce approximately convert|1|mi|km|2 to the east. The section between Charlton and Maze Hill opened in1873 , with Maze Hill functioning as a terminus until1878 .Westcombe Park railway station opened in1879 .The layout of Greenwich station still partly betrays that fact. The line from London, built on a continuous viaduct, is perfectly straight, but after Greenwich it makes a sharp turn and dips into a tunnel. There also used to be a space between the two tracks for the locomotive 'escape route' to reverse the trains, but this disappeared when the station was reorganised to accommodate the
Docklands Light Railway .References
*Ransom, P.J. G., (1990) "The Victorian Railway and How It Evolved," London: Heinemann
*Simmons, J., (1995 ppb ed) "The Victorian Railways," London: Thames and Hudson
*Whishaw, F, (1840) "The Railways of Great Britain and Ireland: Practically described and illustrated" London: Simpkin, Marshall and Co.
* Gray, A, (1990) "South Eastern Railway," Midhurst, Sussex:Middleton Press.
* Lowe, J.W., (1989) "British Steam Locomotive Builders," Guild Publishing
Wikimedia Foundation. 2010.