- Waddamana Power Stations, Tasmania
Waddamana Hydro-Electric power station was the first
hydro-electric power plant ever operated by the Tasmanian Hydro-Electric Department (later theHydro-Electric Commission or HEC), opened in 1916.Conception and Construction
The privately-owned Tasmanian Hydro-Electric and Metallurgical Co. Ltd. first took a serious interest in generating hydro-electric power from one of
Tasmania 's highland rivers in late 1909, to provide power forJames Gillies ' newly patented electrolytic process forzinc refining, and a "carbide" smelter to be constructed near Snug. They resolved to construct a hydro-electric power plant in the valley of theOuse River , above the town that bears that name. Water was to be provided by a small dam on the Great lake at Miena, which would then divert water down the steep drop using awoodstave pipeline and a flume. Construction began in earnest in 1910.However, the Tasmanian Hydro-Electric and Metallurgical Co. ran out of money before the scheme could be completed, and they sold the incomplete works to the newly-formed Hydro-Electric Department in 1914. The works were completed under Hydro-Electric Department ownership in 1915, and the plant was officially opened in 1916. It was the first plant ever operated by them.
History
The plant operated at its original capacity of 7
megawatt s from 1916 to 1929, when, in stages, it was upgraded to 49 megawatts to cater for increased demand. The Hydro-Electric Commission decided, in 1931, to construct a completely new plant to replace the original Waddamana one. However, lack of funds forced them to build alongside the existing plant instead. Thus, from 1944, two power plants were in operation at Waddamana. The new plant was referred to as Waddamana B, and it generated 48 megawatts of electricity from six Pelton turbines.Both plants operated through the 1940s and 1950s, but, in the early 1960s, construction of a new, larger power plant at Poatina began. Designed to replace the two Waddamana plants, with the small Shannon plant nearby, the Poatina power plant was opened in 1964 with a capacity of 325 megawatts, over three times the combined capacity of the plants it replaced. In order for the Poatina plant to be successful, it was necessary to stop the flow of water through Waddamana A and Shannon, both of which were decommissioned in 1964. The Shannon plant was demolished, but the two Waddamana plants remained standing. Indeed, Waddamana B remained in active service until 1994 when it too was closed. Both plants have since been re-opened as a museum.
External links
*http://www.hydro.com.au/home/Energy/Tasmanian+Hydro+Electric+Schemes/Catchment+Areas/Great+Lake+and+South+Esk+Catchment/Waddamana+and+Shannon.htm
Wikimedia Foundation. 2010.