- Sussex Railroad
Infobox SG rail
railroad_name = Sussex Railroad
logo_filename =
logo_size =
system_
map_caption = The Sussex Railroad system at the height of its trackage in 1880 (with the addition of the early 1900s extension to Stanhope/Netcong).
map_size = 220
locale = Sussex County,New Jersey
start_year = 1853
end_year = 1945
predecessor_line = Sussex Mine Railroad
successor_line =Delaware, Lackawanna and Western Railroad
length = About convert|34|mi|km|0|abbr=on|lk=on
hq_city =Newton, New Jersey The Sussex Railroad (later known as the Sussex Branch of theDelaware, Lackawanna and Western Railroad ) was ashort-line railroad in northwesternNew Jersey . It replaced its predecessor, the Sussex Mine Railroad, in 1853 and operated under the Sussex Railroad Company until 1945 when it was fully merged into the Delaware, Lackawanna and Western Railroad (DL&W) system. The Sussex Railroad was important in the economic development of Sussex County as it supplied a route for early local industries, such as dairy farms and ore mines, to export their products. It was the last independently operated New Jersey railroad to be incorporated into the DL&W system. The last train travelled on the Sussex Railroad tracks onOctober 2 ,1966 . The tracks were removed soon after and the right-of-way was transformed into arail trail known as the Sussex Branch trail.Sussex Mine Railroad
The Sussex Mine Railroad, chartered on
March 9 ,1848 , was the predecessor of the Sussex Railroad that was to be used for the sole purpose of haulingiron ore from the recently re-opened Andover Mine. Thenarrow gauge railway was drawn bymule s from the Andover Mine down to theMorris Canal atWaterloo Village and was then taken on to the Thomas Iron Furnaces in Allentown,Pennsylvania . The Act by theNew Jersey Legislature that incorporated the railroad also allowed for the provision of extending the rail into Newton, thecounty seat .Wright, Kevin W. (2000). [http://www.newtonnj.net/Pages/railroad.htm "Newton and the Iron Horse: A History of the Sussex Railroad"] . Accessed online: 3 December 2007.]The initial eleven miles (18 km) of the Sussex Mine Railroad from the mine in Andover, which was named after the mine, was started in May 1849 and completed in August 1851. During construction of the railroad, the legislature approved a supplement to the charter on
March 18 ,1851 that allowed the railroad to extend the line to theMorris and Essex Railroad , which was extending its line to Hackettstown. The Sussex Mine Railroad struck a deal with the M&E that would work in their favor if they were to have the connection ready for operation by the time the M&E's extension reached Waterloo. In preparation for this extension and what eventually became a rebuilding of the entire existing line, the New Jersey Legislature approved another supplement to the charter onJanuary 26 ,1853 that allowed the company to change its name to the Sussex Railroad, reflecting its new purpose beyond just serving the mines and authorized the company to extend the track to any point in Sussex County on theDelaware River .Taber, Thomas Townsend. (1977). "The Delaware, Lackawanna & Western Railroad; The Road of Anthracite: In the Nineteenth Century: 1828-1899". 144-147.]Expansion (1853-1881)
The newly named Sussex Railroad Company drummed up support from the local community by issuing stock and bonds, which raised the necessary funds to lay the new track. Ground was broken on the 4 ft. 10 in.
rail gauge line from Newton to Waterloo onMay 5 ,1853 . The company wanted to proceed as quickly as possible to meet the deadline for the agreement that, if met, would mean a substantial source of revenue. Because of this fast pace, steeper grades and tighter curves were adopted than might have been preferred otherwise. Work progressed quickly, even though the M&E was trying to slow down progress any way they could, including compensating employees of the Sussex Railroad to delay the necessary cuts south of Newton. To speed work along, the Sussex Railroad Company used employees of the Andover Mine temporarily on the railroad right-of-way. All of this effort paid off as they were successful in meeting the deadline. The new railroad was completed and the first train entered Newton onNovember 27 ,1854 with traffic between Newton and Waterloo being opened onDecember 11 ,1854 . The M&E connected to the Sussex Railroad in January 1855, thus the financial agreement made earlier was upheld.At this point, the only stations on the Sussex Railroad were at Newton, Andover, and Waterloo, but they served many industries and moved products such as produce, dairy, meat, and of course iron ore from the mines. Increased interest in the
franklinite and iron and zinc ores from Franklin further northeast of Newton prompted the New Jersey Legislature to adopt another supplement on February 4th, 1863 that authorized the railroad to continue its line up to theFranklin Furnace and to other points north if "deemed most for the public good."Expansion came swiftly with ground breaking on a ten mile extension line north of Newton through Lafayette and Augusta to Branchville in 1866, around the same time that the track gauge was adjusted to 4 ft. 8½ in. to align with the M&E tracks. This branch would allow for an outlet for Sussex County's northern agricultural products and staged the potential future expansion of the line through Culver's Gap to the Delaware River. The first train to run on the Branchville extension went as far as Lafayette on
January 1 , 1869 as work continued further up the line; the entire Branchville line was completed on July 3rd, 1869.At the same time as work was being done on the Branchville line, pressure was increasing to bring rail to the ever-increasing mining industries of Franklin, including the
New Jersey Zinc Company . Work finally began on this nine mile extension in 1868, after a very heated debate and political power plays that could have routed traffic around Newton entirely. But residents of Newton rejected any plan to leave their town off the main line of traffic and insisted that the extension to Franklin be built north of Newton. The Franklin line opened to regular service in mid-September 1869. Additionally, an unconnected four mile spur known as the South Vernon extension, which ran from Hamburg to McAfee, was completed in 1871 and allowed access to an iron ore mine at the base of the Pochuck mountain range via trackage rights on the Midland Railroad. This represented the height of track building on the Sussex Railroad.Rutan, Dave. (2003). " [http://dlw-sussexbranch.com/History/his-timeline.html Sussex Branch Memorial: Sussex Branch Timeline] ". Accessed online: 3 December 2007.]In the 1870s, depots at Franklin, McAfee, Lafayette were completed and a new depot at Newton was constructed. Some other platforms used for local agricultural industries were also completed at Sparta Junction and Monroe. The 1870s also saw another supplement to the charter allowing the railroad to extend rail to Stanhope for an easier connection with the M&E tracks, though the track wasn't laid until 1901. Notably, in 1879, steel tracks replaced iron for the first time on the Sussex Railroad.
This was to be the height of the Sussex Railroad. Only little more than a decade after all the extensions had been completed, the South Vernon extension was sold off to the
Lehigh and Hudson River Railway onJuly 6 ,1881 and the McAfee station was closed in May 1881. The Lehigh & Hudson was also trying to buy a controlling interest in the Sussex Railroad Company itself, but the DL&W, which had already leased the M&E line that connected to the Sussex Railroad, stepped in and bought the controlling interest onJuly 27 ,1881 . The Sussex Railroad was the last independently operated New Jersey railroad to be acquired by DL&W.Under DL&W control (1881-1945)
The Sussex Railroad, operating under the DL&W as the Sussex Branch, began its slow, early decline in the late 19th century, owing to the discovery of better ore elsewhere in the country. Many industries and mines began to close in Sussex County, including the blast furnace in Franklin that shut down in 1900. Still, there was some expansion: A new station was added at Cranberry Lake, which proved to be a nice country get away and weekend vacation spot for residents, and the Stanhope connection was completed in 1901, thus prompting the abandonment of the line to Waterloo.
As industry began to decrease in the area, the rise of the automobile and trucking took away valuable passenger and freight business from the Sussex Branch. As the suffered during the
Great Depression , so did the railroad. Permission was granted by thePublic Utilities Commission to discontinue service to Franklin onFebruary 23 ,1932 , with total abandonment of the Franklin branch being approved by theInterstate Commerce Commission on May 26th, 1934. The remaining line was that of the 21 mile (34 km) Branchville to Stanhope line. By 1945, the Sussex Railroad ceased to exist as the company was finally fully merged into the DL&W.End of service (1945-1969)
After the railroad was merged into the DL&W, the downward trend continued with the 1950s seeing more industries served by the railroad go out of business. By 1959, all mail service via the Sussex Branch was ceased as well.
The 1960s brought the end of the Sussex Branch with the last milk train seen on the tracks in November 1964; the last passenger train from Branchville on July 10, 1966; the last passenger train from Newton on July 13th, 1966; and the last passenger train on the entire branch pulling away from Andover on October 2nd, 1966. By 1969, all track formerly owned by the Sussex Railroad was completely out of service, with the exception of the former South Vernon extension, which is still used today by the
New York, Susquehanna and Western Railway on its way up to Syracuse andUtica, New York .Destruction, removal of tracks, and rail trail (1970-present)
After abandonment, buildings of the former Sussex Railroad deteriorated and track was removed. The Newton passenger depot was demolished in November 1970. The final bit of track between Andover and Stanhope/Netcong was removed in July 1977.
The right-of-way for the Sussex Branch has mostly been preserved, however. The earliest purchase of a former right-of-way occurred in 1938 when Sussex County bought the former Franklin branch after service was discontinued. After all service ceased on the line, the state preserved the remainder of the line in the form of the Sussex Branch Trail, a division of the
Kittatinny Valley State Park system. The trail stretches all the way from Stanhope up to Branchville with only minor interruptions from privately-owned sections.New Jersey Skylands. (2007). [http://www.njskylands.com/pkkitt.htm Kittatinny Valley State Park: Paulinskill Valley and Sussex Branch Trails] . Accessed online: 3 December 2007.]External links
* [http://dlw-sussexbranch.com/index.html Memorial website] to the Sussex Branch by Dave Rutan.
* [http://www.newtonnj.net/Pages/railroad.htm History] of the Sussex Railroad by Kevin W. Wright.
* [http://www.state.nj.us/dep/parksandforests/parks/kittval.html Kittatinny Valley State Park] site with information on the Sussex Branch.References
Wikimedia Foundation. 2010.