- Workover
The term workover is used to refer to any kind of
oil well intervention involving invasive techniques, such aswireline ,coiled tubing orsnubbing . More specifically though, it will refer to the expensive process of pulling and replacing a completion.Reason to perform a workover
Workovers rank among the most complex, difficult and expensive types of wellwork there is. They are only performed if the completion of a well is terminally unsuitable for the job at hand. The
production tubing may have become damaged due to operational factors like corrosion to the point where well integrity is threatened. Downhole components such as tubing retrievabledownhole safety valve s orelectrical submersible pump s may have malfunctioned, needing replacement.In other circumstances, the reason for a workover may not that the completion itself is in a bad condition, but that changing reservoir conditions make it unsuitable. For example, a high productivity well may have been completed with 5½" tubing to allow high flow rates (a narrower tubing would have unnecessarily choked the flow). Some years on, declining productivity means the reservoir can no longer support stable flow through this wide bore. This may lead to a workover to replace the 5½" tubing with 4½" tubing. The narrower bore makes for a more stable flow.
Operation
Before any workover, the well must first be killed. Since workovers are long planned in advance, there would be much time to plan the
well kill and so the reverse circulation would be common. The intense nature of this operation often requires no less than the capabilities of adrilling rig .The workover begins by removing the Xmas tree and lifting the
tubing hanger from thewellhead and thus beginning to pull the completion out of the well. The string will almost always be fixed in place by at least oneproduction packer . If the packer is retrievable it can be released easily enough and pulled out with the completion string. If it is permanent, then it is common to cut the tubing just above it and pull out the upper portion of the string. If necessary, the packer and the tubing left in hole can be milled out, though more commonly, the new completion will make use of it by setting a new packer just above it and running new tubing down to the top of the old.Workovers on casing
Although less exposed to wellbore fluids, casing strings too have been known to lose integrity. On occasion, it may be deemed economical to pull and replace it. Because casing strings are cemented in place, this is significantly more difficult and expensive than replacing the completion string. If in some instances the casing cannot be removed from the well, it may be necessary to sidetrack the offending area and recomplete, also an expensive process. For all but the most productive well, replacing casing would never be economical.
ee also
*
Oil well
*Well intervention
*Well kill
*Completion (oil well) External links
* [http://www.glossary.oilfield.slb.com/Display.cfm?Term=workover Schlumberger oilfield glossary]
* [http://www.keyenergy.com/main.php Key Energy Services Website]
Wikimedia Foundation. 2010.