- Ranger Uranium Mine
The Ranger uranium mine is surrounded by
Kakadu National Park , in theNorthern Territory ofAustralia , 230 km east of Darwin. The orebody was discovered in1969 , and the mine commenced operation in1980 , reaching full production ofuranium oxide in1981 . It is operated byEnergy Resources of Australia , a 68% subsidiary ofRio Tinto Group .Uranium mined at Ranger is sold for use in
nuclear power station s in Japan, South Korea, UK, France, Germany, Spain, Sweden and the United States.The original orebody was completely mined out by the end of 1995, although some ore remains stockpiled. A second orebody ("Ranger 3") began mining in 1997. Both have been open-pit mines.
Ore processing
Ore is ground, then leached with
sulfuric acid . Uranium is removed usingkerosene withamine then stripped withammonium sulfate solution and gaseousammonia .Ammonium diuranate is precipitated by increasedpH and converted to uranium oxide (U3O8) in a furnace.cite web |url=http://www.uic.com.au/emine.htm#ranger |work=Australia's Uranium Mines |title=Ranger |publisher=Uranium Information Centre |month=October | year=2006 |accessdate=2007-01-15]In early 2006, ERA announced an expansion to the ore processing plant which will allow production to extend into lower-grade material and in November 2006 the company announced plans to invest in a Laterite processing plant, which will allow it to process ore with a high clay content that has been stockpiled since the mine began operating. This ore had been already included in stated reserves. The Laterite processing plant will contribute 400 tonnes of Uranium oxide per year from 2008 until 2014. cite web |url=http://www.energyres.com.au/showpdf.php3?id=236 |title=ERA APPROVES LATERITE PROCESSING PLANT |publisher=Energy Resources of Australia |accessdate=2007-01-16 |work=ASX announcement |date=
29 November 2006 ] .Environmental issues
Ranger uranium mine, being within the highly respected and iconic Kakadu preserve, and being a uranium mine is highly sensitive politically for its environmental impact upon this wilderness area.
The main long-term environmental impact of uranium mining is that posed by the large volumes of tailings, mining waste in the form of particularised sand, which remain on the minesite. Guidelines from the International Atomic Energy Agency describe the project area as particularly unsuitable for tailings storage.Current Practices for the Management of Uranium Mill Tailings. Technical Report Series No. 335, IAEA, Vienna 1992] The original pit is now being used to store tailings.
Due to inadequate estimation of annual rainfall in the design phase,cite web|url=http://www.sea-us.org.au/ranger/disaster.html|title=Mining at Ranger|publisher=Sustainable Energy and Anti-Uranium Service|date= 30 November 1997] the mine has continued to suffer routine seasonal failure of the water management systems.cite web|url=http://www.aph.gov.au/Senate/committee/ecita_ctte/completed_inquiries/2002-04/uranium/report/e06.pdf
title=Regulating the Ranger, Jabiluka, Beverly and Honeymoon uranium mines - Appendix 6
publisher=Senate Environment, Communications, Information Technology and the Arts Committee
date=14 October 2003]A mine closure model has been developed by the company and is provided for in the balance sheet to the value of over AU$180 million.cite web |url=http://www.energyres.com.au/corporate/era-ar-2005.pdf |publisher=Energy Resources of Australia |title=2005 Annual Report |accessdate=2007-01-16 |pages=pages 15-16 and 55 |month=February | year=2006 |quote=The company’s obligations in respect of mine closure are clearly rticulated in the Ranger authorisation, and each year an amended plan of rehabilitation, backedby a fund held by the Commonwealth Government, is approved by regulators and stakeholders to cover immediate closure of the site. In 2005 the company went further by creating, a draft ‘first pass’closure model which seeks to define the work required to close and rehabilitate the Ranger site upon final cessation of mining.|format=PDF] However opponents warn that this may be as little as one fifth of the final cost of rehabilitation.cite web
url=http://www.greenleft.org.au/2006/692/35953
title=No to Howard's nuclear madness
publisher=Green Left Weekly
date=24 November 2006] The rehabilitation plan has not been made public, and environmentalists warn that plans for further expansioncite web
url=http://www.news.com.au/couriermail/story/0,23739,21071072-3122,00.html
title=Uranium miner expands
publisher=the Courier Mail |author=Mandi Zonneveldt
date=16 January 2007 |accessdate=2007-01-17] will further widen the gap between needs and means for remediation of the mine site.Fact|date=February 2007afety breaches and controversy
Environment Australia (an agency of theGovernment of Australia ) have documented over 200 environmental incidents since 1979.In May 2005, the company was convicted for breaching environmental guidelines - the first such prosecution of a mining company in the Northern Territory, relating to accidental radiological exposure to ERA employees.John Carroll v Energy Resources of Australia [2005] NTMC 067] Radiologically contaminated process water had contaminated the drinking water supply and some workers drank and washed in the contaminated water. The maximum radiation exposure of workers was likely to have been much less than the regulatory limit, and no harmful long-term health effects are likely.cite web |url=http://www.deh.gov.au/about/publications/annual-report/04-05/outcome-1-settlements-industry.html#ranger-mine |work=Department of the Environment and Heritage annual report 2004-05 |publisher=
Australian Department of the Environment and Heritage |year=2005 |title=Contamination incidents at Ranger mine |id=ISSN 1441 9335 |accessdate=2007-01-15]Other incidents involving decontamination of vehicles have been identified. When the work-for-welfare mechanic in Jabiru opened the engine bay, he was unaware of the nature of the mud and dirt which fell on the floor. The court heard that in the following weeks, after he had swept the material outside his shed, his children played and built sandcastles in mud contaminated with Uranium.cite news |url=http://www.theage.com.au/news/Business/ERA-fined-150000-over-contamination/2005/06/01/1117568249370.html?oneclick=true |title=ERA fined $150,000 over contamination |date=June 1, 2005 |accessdate=2007-01-15 |publisher=
The Age ]Another significant controversy over Ranger's environmental impact is the public legal confrontation over releases into Magela Creek in the 1995 wet season. More recently, the ARRAC report from 2002 details a major leak of about 2 megalitres of potentially polluted water, over a number of months. In 2007, water breached a retention pond, overflowing back into the pit. The original authorisation required that this water be contained at all times. In 2006, water management systems were knocked into disarray by
Cyclone Monica .See also
*
List of uranium mines
*Uranium ore deposits
*Mining
*Uranium market
*List of Australian Inquiries into Uranium Mining
*Russell Walter Fox References
External links
* [http://www.energyres.com.au/ranger/ Energy Resources of Australia]
* [http://www.abc.net.au/pm/content/2004/s1086654.htm ABC Online:Ranger Uranium Mine resumes production despite contaminated water incidents]
* [http://www.ntne.ws/articles/article.php?section=ranger collection of news articles and media releases about Ranger Uranium Mine]
* [http://www.theage.com.au/news/Business/ERA-extends-mining-at-Ranger-site/2007/09/27/1190486453544.html Ranger uranium mine life pushed to 2012]
Wikimedia Foundation. 2010.