- Longhedge Railway Works (Battersea)
Longhedge railway works was in the borough of
Battersea , SouthLondon .In 1860 the directors of the
London, Chatham and Dover Railway decided to purchase 75 acres of land, formerly part of the Long Hedge farm in Battersea, to establish their new locomotive works and motive power depot. The site was on the south south side of theLondon and South Western Railway main line at Stewarts Lane. By February1862 an erecting shop for twelve locomotives, and a running shed for 26 locomotives had been completed, and by the end of the year a carriage works was also completed on the site. Further extensions were made in 1875/6 and 1880/1.The new works was initially used by the locomotive superintendent
William Martley for the repair and rebuilding of the existing locomotive stock, with new locomotives obtained from outside contractors. However, in 1869 he began the construction of three new L class2-4-0 locomotives there. However, it was not until the appointment ofWilliam Kirtley as locomotive superintendent in 1876 that the works were again used for new construction with further examples of Martley’s ‘’Europa’’ class 2-4-0 locomotives, Kirtley’s own T class0-6-0 T and his M1, M2 and M3 class4-4-0 express passenger locomotives. Following Martley’s retirement in 1898 on the formation of theSouth Eastern and Chatham Railway Ashford became the major locomotive works for the new company, but the new Locomotive, Carriage & Wagon Superintendent Harry H.S. Wainwright used Longhedge works for the construction of some examples of his0-6-0 freight locomotives of the 'C' class in 1902-4. Thereafter the works was used for heavy repairs until 1911, when much of the equipment and machinery was transferred to Ashford, leaving only the capacity to undertake light repairs associated with the adjoining Stewarts Lane motive power depot.After the creation of the Southern Railway in 1923, the nearby Battersea depot of the
London, Brighton and South Coast Railway was closed and Stewarts Lane grew to become the largest steam motive power depot of the system. The buildings of Longhedge works were demolished in 1957 to make way for a new depot for servicing electric trains. The site is now occupied by the Stewarts Lane Traction Maintenance Depot.References
* Bradley, D.L., (1979) "The locomotive history of the London Chatham and Dover Railway," Railway Correspondence & Travel Society
Wikimedia Foundation. 2010.