Tōzai Line (Kyoto)

Tōzai Line (Kyoto)

The Nihongo|Tozai Line|東西線|Tōzai-sen is a Kyoto Municipal Subway line that runs from the southeastern area of the city (starting from Rokujizo Station), then east to west (i.e. "tōzai" in Japanese) through the Kyoto downtown area. The Kyoto Municipal Transportation Bureau operates the system along with the Karasuma Line and the City Bus. The present terminal stations are Rokujizo Station in Uji and Uzumasa Tenjingawa Station in Ukyō-ku, Kyoto. It handles an average of 120,000 passengers daily.

The stations are made modern in design. They are wheelchair-friendly, with elevators, narrow gaps between platform and train, and no height differences at places like rest rooms. Each station has a color code for easy recognition. All platforms on the line are island platforms, and have security doors separating the platform from the tracks.

The distance of the present line is 17.5 km with a gauge of 1,435 mm. The entire length is double-track. Trains are electric, operating on 1,500 V DC.

On October 12, 1997, the section the line from Daigo to Nijō opened. On November 26, 2004, the line from Daigo to Rokujizō opened. An extension westward from Nijō to Uzumasa Tenjingawa began service on January 16, 2008. [cite web|url=http://www.city.kyoto.jp/kotsu/news/2007/2007106.htm|title=地下鉄東西線二条~太秦天神川間が1月16日に延伸開業|language=Japanese|author=Kyoto Municipal Transportation Bureau|date=October 17, 2007|accessyear=2007|accessdate=November 6]

Line data

*Total length
**Rokujizō - Uzumasa Tenjingawa: 17.5 km
*Length (by jurisdiction)
**Kyoto Municipal Transportation Bureau
***Rokujizō - Misasagi: 8.7 km
***Sanjō Keihan - Uzumasa Tenjingawa: 5.4 km
**Kyoto Municipal Transportation Bureau / Kyoto High-Speed Rail Corp.
***Misasagi - Sanjō Keihan: 3.4 km
*Gauge: 1,435 mm
*Number of stations: 17
*Double-track sections: Entire line
*Electrification: 1,500 V DC, overhead
*Door closing method: In-car signaling (ATC, ATO)
*Top speed: 75 km/h

History

Events leading up to construction

After World War II, the Kyoto Municipal Transportation Bureau discussed the possibility of creating a new municipal streetcar system, connecting Rokujizō, Daigo, and Keage, before cutting along the center of Oike-dōri (an elevated line was also considered). Before long, the proposal was at an impasse in the face of ever-increasing automobile use in the city. However, the plan was eventually reworked as a subway line.

The population along the east-west route showed a considerable trend of growth, but road development in the vicinity could not overcome traffic congestion, so a plan for transportation facilities connecting the eastern part of the city (Yamashina-ku and the eastern portion of Fushimi-ku) with the city center was developed starting in 1965, and it was officially approved by the city government in 1969. The construction of the segment from Daigo to Nijō was set to start in 1975.

At that time, however, the Keihan Keishin Line ran above-ground between Misasagi and Sanjo Keihan along the planned route, and the issue of competition arose. As a result of negotiations, Kyoto City and Keihan Electric Railway agreed to establish a Third Sector (public-private partnership) company to obtain a Type-3 railroad business permit and control the tracks, while the City of Kyoto would obtain a Type-2 railroad business permit and operate the trains on that section. Thus the Kyoto High Speed Railway Corporation was born. Founded in 1986, then-mayor Masahiko Imagawa assumed duties as its president. Kyoto High Speed Railway constructed the subway through the Japan Railway Construction Group, and along with the Keihan Keishin Line's incorporation, the above-ground section was set to be eliminated.

Over the course of construction work underneath Kyoto, the project faced frequent, unavoidable interruptions due to discoveries of remains and ruins, and experienced difficult work in tunneling underneath the Kamo River and Tōkaidō Shinkansen. The section from Daigo to Nijō opened in 1997, and the Keihan Keishin Line was integrated from Misasagi to Kyoto Shiyakusho-mae.

The reason that the Keishin Line does not terminate at Sanjo Keihan as it originally did when above-ground, is that the necessary amount of space for a turnaround could not be provided (not only is there a sharp curve directly to the west of that station, but the turnaround would be directly underneath the Kamo River, so it was not feasible). The reason it did not originally continue to the (then-)terminus at Nijō was for the Kyoto Municipal Transportation Bureau to keep the calculated costs of running the trains balanced. However, since the opening of the extension in 2008, this is no longer the case and trains of the Keishin line now continue all the way to the present terminus at Uzumasa Tenjingawa. When the above-ground Keishin Line portion was demolished, Kujōyama Station and Hinooka Station (which have no subway counterparts) were demolished as well. City residents who lived near Kujōyama Station demanded that there be a Kujōyama subway station, but due to anticipated difficulties in construction, as well as an insufficient estimated number of riders, this request went unfulfilled.

Extension west

A plan exists to extend the Tōzai Line as far west as Rakusai in Nishikyō-ku, but for the time being, extension will be stopped at Uzumasa Tenjingawa; prospects beyond that are as-yet still unclear. There are several issues to be considered:
*The population of Rakusai New Town is holding steady or decreasing;
*Beyond Hankyu Katsura Station, Rakusaiguchi Station is already in service, and a new JR station (JR Katsura Station) is planned, so the inconvenience of transportation in that area has already been resolved to a degree;
*The subway's high construction costs;
*and the population of the Umezu and Kamikatsura districts leading into Rakusai New Town along the route are not very large.

Timeline

*October 12 1997: Opening of the section from Daigo to Nijō. The Keihan Keishin Line is incorporated into the subway.
*November 26 2004: Opening of the section from Rokujizō to Daigo.
*January 16 2008: Opening of the section from Nijō to Uzumasa Tenjingawa.

tations

The colors indicated by the "Station Color" column in this section may not display as the correct colors, depending on your viewing environment and monitor settings.

Highlights of the line

Daigo Station: Daigo-ji, a splendid Buddhist temple with a fine pagoda and a beautiful Japanese garden; connections to Toyotomi Hideyoshi

Kyōto Shiyakusho-mae Station: Kyoto City Hall; nearby, the rebuilt Honnō-ji, the original of which (in another part of the city) burned in the treacherous attack by Akechi Mitsuhide against Oda Nobunaga

Nijō-jō-mae Station: The Nijō Castle of Tokugawa Ieyasu

Notes


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • Tōzai Line — can refer to one of several Japanese railway lines. The name literally means East West Line . The following lines exist: *Tōzai Line (JR West), operated by JR West mainly in Osaka Prefecture *Tōzai Line (Kobe), operated by Kobe Rapid Railway in… …   Wikipedia

  • JR Tōzai Line — infobox rail railroad name=JR Tōzai Line logo filename= logo size= system map size=240 map caption= marks= locale=Osaka Prefecture and Hyōgo Prefecture start year=1997 end year=present successor line= successor line= gauge= 1,067 mm / 3 ft 6 in… …   Wikipedia

  • Kyoto — For other uses, see Kyoto (disambiguation). Kyoto 京都   Designated city   京都市 · Kyoto City …   Wikipedia

  • Kyoto Shiyakusho-mae Station — (京都市役所前駅 Kyōto shiyakusho mae eki ) is a stop on the Tozai Line of Kyoto Municipal Subway in Kyoto, Japan. It is in Nakagyo ku. With the station number designation T12, its station color is kara kurenai . Because it lies beneath the Kawaramachi… …   Wikipedia

  • Kyoto Municipal Transportation Bureau — nihongo|Kyoto Municipal Transportation Bureau|京都市交通局|Kyōto shi Kōtsū kyoku operates municipal subways and city buses in Kyoto, Japan.*Kyoto Municipal Subway **Karasuma Line **Tozai Line *City Busee also* List of rapid transit systemsExternal… …   Wikipedia

  • Kyoto Municipal Museum of Art — The Kyoto Municipal Museum of Art (Kyoto shi bijutsukan, 京都市美術館) is an art museum in the city of Kyoto which opened in 1933. It was conceived in 1928 as a commemoration of the Showa emperor s coronation ceremony, and it was initially called the… …   Wikipedia

  • Nijō Station (Kyoto) — Nijō Station 二条駅 Location Prefecture Kyoto (See other stations in Kyoto) City Kyoto Ward Nakagyō …   Wikipedia

  • Nara Line — This article is about the West Japan Railway Company (JR West) line. For the Kintetsu line, see Kintetsu Nara Line.      Nara Line 奈良線 221 series EMU Miyakoji Rapid …   Wikipedia

  • Osaka Loop Line —      Ōsaka Loop Line 103 series (left) and 201 series EMUs Overview System …   Wikipedia

  • Yotsubashi Line —      Yotsubashi Line Yotsubashi Line 23 series train …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”