- Nightstar (train)
-
The Nightstar was a proposed overnight sleeper service from various parts of Britain to continental Europe, via the Channel Tunnel. To run alongside the Eurostar and north of London day time Regional Eurostar services, the Nightstar was the last part in a round the clock passenger train utilisation of the Channel Tunnel.
After rejection of various British ideas for the service that was to become the Eurostar train, which eventually was created from the existing French TGV scaled for a British loading gauge, the Nightstar emerged as an individual locomotive-hauled passenger train.
Contents
Rolling stock
The trains were to use equipment based on the British Rail Mark 4 coaches modified for long distance service,[1] configured as a fifteen coach train as follows:
- Seated coach: 4 per train
- Lounge/Service: 1 per train
- Sleeping car: 10 per train
Locomotives
Electric
On electrified lines the services were to be hauled by Class 92 locomotives. These locomotives were built and designed as multipowered electric units for this role as well as hauling Channel Tunnel freight services.
Diesel
On non-electrified routes Nightstar services would have been hauled by a pair of Class 37/6 locomotives, which would have come from a dedicated operational pool of twelve units (37601-37612). These diesel locomotives were modified during 1995 and 1996 at Doncaster Works and fitted with through wiring for electric train supply, ETS (used for powering services in the coaches such as air conditioning) and RCH jumper cables to enable the locomotives to work in multiple.[2]
Generator van
To produce the ETS there would have been a generator van, containing two 500 horsepower (370 kW) diesel engines, marshalled between the two Class 37/6 locomotives.
Routes
The proposed services were to operate via intermediate stations on five routes to Glasgow, London, Manchester, Plymouth and Swansea in the UK to/from Amsterdam, Dortmund and Frankfurt.[3]
Delay
The 139 carriage stock order began construction in 1992 and continued slowly until the whole project was put on hold in 1997, then formally abandoned in 1999. The reasons for the delay in the start of operations and then the final cancelling of construction are similar to those given for the non-start of Regional Eurostar service: primarily due to rising costs and competition from low cost airlines such as Ryanair and EasyJet.[4]
Fragmentation and privatisation of Britain's rail network also left European Passenger Services (Eurostar) as a small operator lacking financial muscle and technical know-how, and incapable of operating such a service even had there been demand for it.
In retrospect, the service was ill conceived. Specifying numerous trains to numerous destinations meant loadings would have been low, and security at some stations high-cost trying to separate security cleared international passengers from local commuters.[3]
Withdrawal
Although only 45 cars (20 seated, 19 sleeper & 6 service vehicles) of the 139-car order were completed when the project was put on hold in 1997, at least 32 more were partially complete and all the body-shells were complete. All the complete and partially complete cars were moved to secure storage, mainly at MoD Kineton which stored 38 numbered complete cars and 32 unnumbered incomplete cars in 2001.[5]
As it became clear that the Nightstar services were unlikely to ever run, in June 1997, London and Continental Railways initially sold half of the fleet of twelve Class 37/6 locomotives to Direct Rail Services, followed by a further three locomotives three years later bringing the DRS total to 9 Class 37/6 units.[6]
Resale
After withdrawal of the service, in 2002 London and Continental Railways were credited by the UK Government with the lease fees on the carriages. The UK Government reached an agreement with builders Alstom to sell the carriages back, subject to Alstom securing a new purchaser.
There was interest in the carriages from both British and European operators but the weight, high electric train supply demand and the need to extensively modify them to suit the prospective operator's needs meant there were no takers, with Alstom accepting that if they could not sell them they would all eventually be scrapped. The heavy weight steel (by European standards) of the cars (seated cars: 50.2 tonnes, sleeper cars: 53.3 tonnes, service vehicles: 52.9 tonnes) came from all the safety systems required for the carriages to run through the Channel Tunnel, and the wiring for the over-specified hotel services. The same over-specified hotel services also account for the high ETS index.
Just before the service was finally withdrawn, it was estimated by one expert to The Sunday Times that only one European produced locomotive could have hauled and powered a fully laden Nightstar - and that the locomotive was not due into production for another two years, would not fit the British loading gauge, and would draw too much power from a single section, thus requiring it to have special clearance while operating. The article concluded that the only pair of locomotives available to power and move the complete train was the Eurostar modified TGV power car.
Via Rail Canada
Alstom confirmed in early May 2000 that Canada’s Via Rail was interested in purchasing some of the redundant Nightstar stock.
Via Rail took delivery of three cars for evaluation in June 2000.
The carriages required several modifications for Canadian service:
- Fitting of knuckle couplers
- Doorways to suit Canadian low-level platforms
- Compatible with the 480V HEP system
- Enhanced air-conditioning system
On 15 December 2000 Via Rail issued a press release[7] confirming that it had placed an order with Alstom for the supply of the 139 Nightstar cars. Due to the lack of other interested purchasers, Via Rail acquired them for $130 million total, a considerable discount from the fair market value of $400–500 million. According to the press release Via Rail planned to use them to expand service in the Corridor routes (notably on services between Toronto, Montreal, Ottawa, and Quebec), on sleeper routes from Montreal to Halifax (Ocean) and Gaspé (Montreal – Gaspé train), and to free up existing stock for use on The Canadian (Toronto–Vancouver) transcontinental route.[8]
The cars were shipped to Bombardier Transportation’s Thunder Bay facility, where the conversion work was carried out.[9]
References
- ^ Nightstar, the train that never was
- ^ British Railways Locomotive Classes
- ^ a b "Second chance for Eurostar sleepers". Railwatch.org.uk. http://www.railwatch.org.uk/backtrack/rw098/rw098p10.pdf. Retrieved 2009-04-28.
- ^ Class 373: Trans Manche Super Train
- ^ [1][dead link]
- ^ rolling stock : class 37
- ^ "Via's New Renaissance Passenger Cars". Via Rail. http://www.viarail.ca/corporate/en_bkgdr_20011116_renaissance_passenger_cars.html.[dead link]
- ^ Via Rail Canada / Renaissance of Passenger Rail / Backgrounder 2001-11-16[dead link]
- ^ [2][dead link]
External links
Categories:- Channel Tunnel
- Eurostar
- Passenger rail transport in Belgium
- Passenger rail transport in Canada
- Passenger rail transport in France
- Passenger rail transport in the United Kingdom
- Named passenger trains of the United Kingdom
- International named passenger trains
- Night trains
Wikimedia Foundation. 2010.