- Cairo Metro
Infobox Public transit
name = Cairo Metro
imagesize = 220px
locale =Cairo
transit_type =Rapid transit
began_operation = 1987
ended_operation =
system_length = km to mi|65.5|abbr=yes|precision=1 [cite web
url = http://mic-ro.com/metro/metrocity.html?city=126
title = Cairo
publisher = Metro Bits
author = Rohde, Mike
accessdate = 2008-03-22]
lines = 2
vehicles =
stations = 53
ridership =
track_gauge =
reporting marks =
operator =
owner =The Cairo Metro in
Egypt isAfrica 's only full-fledged metro system. The system consists of two operational lines, with construction having begun on a third line in September 2008.The metro is run by the National Authority for Tunnels. The line uses
standard gauge (1435 mm). Ticket price is EGP 1.00 for each journey (as ofOctober 2007 , EUR 0.13 or USD 0.18), regardless of distance. On allCairo metro trains, the middle two cars (4th and 5th) of each train are reserved for women until early evening as an option for women who do not wish to ride with men in the same car; however, women can still ride other cars freely.The two lines carry around 700 million passengers a year and on average 2 million per day [ [http://www.ameinfo.com/31095.html Egypt's brightest new advertisng idea | Business Features ] ] .
Line 1 (Helwan - El-Marg)
Line 1 (the red line) opened in
1987 after the joining of two existing above-ground lines with a large underground section through the city center. (Because of this, it is sometimes referred to as the "Regional Line".) The line runs a total of 43.5 km (27 miles) with 3 km (1.8 miles) underground, serves 33 stations, and has a 60,000 hourly passenger capacity per direction. Sometimes known as the "French-Built Line", this metro runs from the industrial Helwan area in the south to El-Marg northward. It is mostly above ground, with thedowntown section below ground.This line was built in three stages:
*First: (Helwan / Ramsis field): 29 km, opened 1987.
*2nd: (Ramsis field / El-Marg ): 14 km, opened 1989.
*3rd: Northern continuation of Line 1: 1.3 km, opened 1999.Line 2 (Shobra - El Mounib)
Cairo 's metro network was greatly expanded in the mid-1990s with the building of Line 2 (yellow), from Shoubra toCairo University , with an extension toGiza . Extending convert|21.5|km|mi|0 with 20 stations, it is sometimes called the "Japanese-Built Line" and includes the first underground crossing of theNile . It is mostly in bored tunnel, with two exceptions: a short section at the northern end approaching Shubra El-Kheima which is elevated, and a section just south of this by cut-and-cover. The main difference between Lines 1 and 2 is that Line 1 uses anoverhead line while Line 2 uses thethird-rail system.* October 1996 Shobra - Mubarak, convert|8|km|mi|0
* Sept 1998: Mubarak - Sadat, convert|3|km|mi|0
*April 19 ,1999 : Sadat - Cairo University, convert|5.5|km|mi|0 (including crossing of the Nile)
*October 8 ,2000 : Cairo University - Giza Suburban convert|2.7|km|mi|0
*January 17 ,2005 : Giza Suburban - Monib convert|2.5|km|mi|0Plans
Four more lines are proposed — all with the goal of reducing Cairo's chronic road congestion — with Line 3 (green) from Imbaba / Mohandessin to Abbasiya, and eventually to
Cairo International Airport at Heliopolis. Line 4 is expected to go from the southwest at Al Ahram to the east at Nasr City; Line 5 is planned as a half-circular line connecting all the other lines, from Nasr City to Port Said Street and Shubra El Kheima; and Line 6 is to be a north-south line from Shubra toMaadi .A recent transportation study of the Greater Cairo region was completed in 1999 and recommended the implementation of four new metro lines, Lines 3, 4, 5 and 6, in addition to the two existing lines currently under operation. The completed Metro Network will be capable of serving most of the densely populated areas in the Greater Cairo region, which is in much need of a mass transit system. The Metro Network includes many interchange stations between the six metro lines and also provides interchange facilities with existing main railway stations and bus terminal stations.
Line No. 3 extends from the northwest of the Greater Cairo at Imbaba to the northeast at Heliopolis and will eventually also serve the Cairo International Airport. The line crosses under the two branches of the River Nile, as does Line 2. The total length of the line is approximately convert|30|km|mi|0 most of which is in bored tunnel and will be implemented in four phases. The project includes a Main Workshop adjacent to the western terminal of the line and a Light Repair Workshop at the middle of the line at Abbasia.
The implementation of Line No. 3 will start with Attaba to Abbasia section, the first phase, followed by the second phase from Abbasia to Heliopolis, which are the most urgent sections for the transportation needs.
The design of phase 1 is taking into consideration the safe crossing of two major underground structures; namely, the line 2 bored tunnel at Attaba and the wastewater spine tunnel north of Attaba. It is also planned that some of the underground stations will be extensively used as commercial centres. These stations will be constructed by the cut-and-cover method and the rolling stock will be fed by power through a third rail.
Currently, 3 stations are being built and dug as of August 2008. They are El Geish, Abdo Basha and Al Abbasiyya. El Geish street has been closed since May 2008 for underground works. Works underground the attaba station has been running since 2007 to divert water pipes, electricity grid and sewage network. Work in that station which also serves Line 2 will begin in early 2009.
Line No. 4 crosses the region from the southwest at Al Ahram to the east at Nasr City, a length of convert|24|km|mi|0 most of which is also in bored tunnel and crosses under the two branches of the River Nile.
Line No. 5 is a half-circular line connecting lines 1, 2, 3 and 4 and has a length of convert|20|km|mi|0. The entire route is in bored tunnel.
Line No. 6 is a longitudinal line stretching from the north of the city to the south, a length of convert|19|km|mi|0, most of which is in bored tunnel.The six metro lines are planned to meet the transportation demands of the Greater Cairo area up to the year 2022. However, the actual construction and implementation schedule will be restricted by the available funding resources.
See also
*
List of Cairo metro stations
*List of rapid transit systems References
External links
* [http://www.photouploads.net/PhotoAlbum.php?photoalbumid=6&StartPhotoID=119 Some hi-res pictures from inside the Cairo Metro]
* [http://www.nat.org.eg/ National Authority for Tunnels official website]
* [http://www.urbanrail.net/af/cairo/cairo.htm Cairo Metro] (UrbanRail.Net)
* [http://www.ita-aites.org/cms/329.html The Greater Cairo Metro Network] (International Tunnelling Association)
Wikimedia Foundation. 2010.