- Bundesstraße 30
The
Bundesstraße 30 (abbreviated B30) is a highly frequented federal highway inGermany running throughUpper Swabia inBaden-Württemberg fromUlm toFriedrichshafen onLake Constance . It has a length of approximately 105 km (approximately 65 miles).Course
The B30 starts at Ulm, passing the
cities ofLaupheim ,Biberach an der Riß ,Bad Waldsee , Weingarten andRavensburg , terminating at Friedrichshafen. Originally planned to continue toGünzburg and passing the motorway interchange atNeu-Ulm , this stretch has never been completed. The motorway junction at Neu-Ulm, however, has partially been completed.The first 40 km (approximately 25 miles) from Ulm to Biberach are laid out as a
dual carriageway .From junction Biberach-South to
Oberessendorf , the Bundesstraße 30 is a single lane road. It is planned, however, to extend this stretch with an alternating extra lane for overtaking. The works for this are planned to be completed by 2009. From Oberessendorf until Baindt the road is again a single lane road. The onlytraffic lights on the whole route can be found inGaisbeuren , north of Ravensburg.A bypass of Ravensburg has been almost completed, the stretch of the original federal road between Baindt and Ravensburg having been downgraded to the status of a Landesstraße, the L 313.
History
Originally designated as Württembergische Staatsstraße 49, during the re-numbering of the road network in
1932 , it becameReichsstraße 30 with the maintenance being taken over by theReichsstraßenverwaltung in1934 . Already in1936 , a bypass of Ravensburg was planned. Due toWorld War II , this was not built.Instead, in1961 , a bypass of Bald Waldsee was completed as a dual carriageway.In1981 , works started on the Ravensburg bypass which is almost complete except for a stretch to the south of Ravensburg.Problems
Lorries trying to avoid the motorway toll by using federal highways, have caused an increase of traffic on secondary roads. This has led to slow-moving traffic southbound from junction Biberach-South onwards. In case of road accidents, traffic frequently comes to a complete standstill. During the various holiday seasons, many motorists, trying to evade heavy traffic on the motorways nearby (A7 and A96), contribute, in conjunction with the increase in lorries, to additional congestion.
When in October 2004, major roads works were carried out between
Enzisreute and Ravensburg, the importance of the B30 as a major traffic artery became apparent. Diversionary routes up to 60 km (37.5 miles) were necessary that had to split into two different routes. On the first day of the road works, there were traffic jams of more than 4 km (3.5 miles) at the exits leading to the diversions. On the diversions themselves, traffic collapsed completely at times. The raof works enabled the inhabitants of Gasibeuren to measure the width of the B30, showing that the road in Gaisbeuren is up to 16 metres (18 yards) wide.Future
Since
1963 , the state ofBaden-Württemberg aims in the long term to convert the B30 first into a motorway-like federal highway and consequently into the motorway A89.At this point in time, only the stretch from Ravensburg-South to Friedrichshafen is included into the plans of the federal government. On 23 February 2006, this pans met legal approval, the beginning of the road works for the extension, however, are still uncertain, the earliest date possible being 2008 with a completion date in 2010. The original concern have therefore come true in that once thelegal obstacles to built the extension are overcome, the federal government has run out offunding .Except for the stretches just outside of Ulm and between Ravensburg and Friedrichshafen, the part of the B30 between Bad Waldsee and Ravensburg counts the highest traffic density, where up to 22.000 vehicles each day were recorded. However, there are plans for a reconstruction of this stretch. These plans are currently only at an embryonic stage, with the only concrete planning being an extension at Enzisreute. Gaisbeuren is particularly badly affected by the intense traffic flow but plans for improvement are not as yet known. Any improvement will have to wait for at least 20 years.
Due to the extension of the road network in the former
German Democratic Republic ,funding for traffic projects in the state] of Baden-Württemberg was cut severely. As a consequence, even the most basic maintenance work on the B30 could often not be carried out, due to the lack offinancial resources.Since then, the federal state of Baden-Württemberg has received more funding from the federal government for maintenance and extension work of the road system, which, however, are still quite modest.
Wikimedia Foundation. 2010.