- USS Artemis (AKA-21)
USS "Artemis" (AKA-21) was an "Artemis" class attack cargo ship named after the asteroid
105 Artemis , which in turn was named after the Greek goddessArtemis . She served as a commissioned ship for 2 years and 4 months."Artemis" (AKA-21) was laid down under a
Maritime Commission contract (MC hull 1882) on 23 November 1943 atProvidence, R.I. , by theWalsh-Kaiser Co., Inc. ; launched on 20 May 1944; sponsored by Mrs. Thomas J. Walsh; acquired by the Navy from the Maritime Commission on 28 August 1944; and placed in commission that same day, Lt. Comdr. Thomas J. Rattray in command.After fitting out at
Boston , Mass., the attack cargo ship proceeded to theChesapeake Bay for shakedown training. She then sailed to the naval supply depot atBayonne, N.J. , to embark naval passengers and supplies for transportation to thePacific . The ship got underway on 12 October and transited thePanama Canal on the 17th. On that same date, she reported to Amphibious Forces, Pacific Fleet, and continued on toward the west coast. She reachedSan Diego , Calif., on the 26th and remained in port for one day. The vessel then shaped a course for Hawaii."Artemis" reached
Pearl Harbor on 3 November and unloaded her passengers. One day later, she left Hawaiian waters to return to California. On 13 November, the ship arrived atPort Hueneme to take on pontoon equipment and carried this cargo to Pearl Harbor. While in Hawaii, she participated in a series of training exercises held off Pearl Harbor. On 5 December, "Artemis" left Hawaiian waters to return to the west coast. Once again, cargo was taken on at Port Hueneme, and the ship proceeded back to Hawaii."Artemis" spent the Christmas holidays in port at Pearl Harbor. On 4 January 1945, she proceeded to Kahalui,
Maui , to embark marines. The vessel got underway on 12 January with units of Task Force (TF) 51 for amphibious training exercises off Maui and arrived back at Pearl Harbor on the 18th. Nine days later, she sailed forEniwetok with Task Group 53.2.After spending two days at that atoll, "Artemis" got underway to participate in the invasion of the Volcano Islands. Steaming via
Saipan , the ship anchored in Transport Area "Baker" off the southeast coast ofIwo Jima on 19 February. She then sent her boats to assist the transports during the initial assault. The attack cargo ship remained in the area through the 27th discharging troops and cargo and taking casualties on board during the day and retiring out to sea each night."Artemis" touched back at Saipan on 3 March. Three days later, she got underway for
Ulithi and remained in port there during the next three weeks to resupply and undergo minor repairs. On 29 March, the vessel paused at Manus before getting underway forNew Caledonia . She arrived atNoumea on 4 April where she took on passengers and cargo before sailing on 3 May for Leyte,Philippine Islands .The vessel reached Leyte on 16 May and began unloading operations the next day. "Artemis" headed for "New Guinea" on the 30th and touched at
Hollandia on 3 June. Two days later, she moved toOro Bay to take on cargo and troops. The ship sailed for the Philippines on 9 June, discharged her cargo atManila , and then sailed to theAdmiralty Islands . After pausing at Manus to refuel,Artemis proceeded toLae , New Guinea, to pick up more troops and cargo. The loading was completed on 3 July, and the vessel got underway to return to the Philippines. She unloaded at Manila in mid-July before proceeding toTacloban , Philippine Islands, to pick up troops and equipment for transportation to Hawaii."Artemis" sailed eastward on 31 July and reached Pearl Harbor two weeks later. She was discharging her cargo there when word of the Japanese capitulation was announced on 15 August. The vessel entered
drydock at thePearl Harbor Navy Yard on the 24th for overhaul. This work was completed in mid-September, and she embarked occupation troops for transportation to the Japanese home islands. On 3 October,Artemis moored at Yokosuka, Japan, and began discharging her passengers. She operated in Japanese waters until 24 November, when she set a course for the west coast of the United States.The vessel reached
San Francisco , Calif., on 10 December and, 10 days later, set out for the Philippines. Upon her arrival at Samar, "Artemis" embarked military personnel for transport back to the United States. She got underway on 21 January 1946 and made San Francisco on 9 February. The ship remained in port there until 20 March, when she headed for Hawaii. Upon her arrival at Pearl Harbor, the ship conducted logistic support operations for nearby naval activities until 15 May, when she was assigned to Joint Task Force 1 to support Operation "Crossroads," tests conductd atBikini Atoll to learn of the effects of atomic bomb explosions upon warships. This assignment occupied the cargo ship through mid-August when she returned to Pearl Harbor and resumed local operations.On 6 November, "Artemis" departed Hawaiian waters and shaped a course for the west coast. She reached San Francisco one week later, but left that port on the 23d and proceeded to the
Panama Canal Zone . After retransiting the canal, the ship continued on to Norfolk, Va., where she was decommissioned on 10 January 1947. Her name was struck from the Navy list on 25 February 1947. The ship was transferred to the Maritime Administration on 1 April 1948 and was laid up in theNational Defense Reserve Fleet in the James River. She was later sold during the 1960s to the Union Minerals & Alloys Corp., of New York City, and was subsequently scrapped."Artemis" earned two battle stars for her
World War II service.References
*DANFS|http://www.history.navy.mil/danfs/a12/artemis-iii.htm
External links
* [http://www.navsource.org/archives/10/02021.htm NavSource Online: AKA-21 "Artemis"]
* [http://ussrankin.org/id352.htm 51 Years of AKAs]
Wikimedia Foundation. 2010.