- Smartlink, Ashford
"SMARTLINK" is a proposed fast link between the town centre of
Ashford, Kent ,England and it's suburbs and main amenities, creating an alternative to the car, reducing the overall impact of transport.Aims of the scheme
SMARTLINK is one of the key elements of the transport strategy for Ashford (along with
M20 motorway , junction 10 improvements, junction 10A development, a new "Victoria Way" and the dualing of "Chart Road" [http://www.ashford.gov.uk/ashfords_future/master_plan/documents/smartlink.pdf Ashford Borough Council] SMARTLINK scheme appraisal31 March 2006 ] ) and will be the realisation of a significant increase in the number and proportion of trips by sustainable means, particularly passenger transport.The new advanced passenger transit system aims to provide the vision for new services in Ashford by offering high quality, frequent, reliable, affordable, integrated bus provision across the town.
The plan is to give the SMARTLINK buses priority over other traffic and passengers improved waiting environments with real time travel information. [http://www.kent.gov.uk/NR/rdonlyres/B7C402A5-E4C1-443E-B03A-4935BD79FA2A/0/may06item4.pdf Kent County Council] A report by the Head of Transport Projects to the Highways Advisory Board on 2nd May 2006]
Routes
A three-legged SMARTLINK system is proposed linking the town centre with
#Chilmington Green to the south-west, possibly serving "Cobbs Wood", "Godinton Park", "Singleton" and "Stanhope".
#Cheeseman's Green to the south-east, also linking with the "Orbital Business Park, Waterbrook", the "Newtown Railway works, Designer Outlet" and the "International railway station".
#The Warren to the north-west, serving the "Eureka" leisure development at junction 9 of the M20. [http://www.ashford.gov.uk/ashfords_future/master_plan/documents/smartlink.pdf Ashford Borough Council] SMARTLINK scheme appraisal31 March 2006 ]Parking will play a key part in the overall strategy for encouraging use of alternative modes of travel and demand will be met by both the construction of new car parks and by the development of Park & Ride at the edges of the town. Three Park & Ride sites are proposed to anchor the new system with a phased implementation programme over the next ten years. [http://www.kent.gov.uk/NR/rdonlyres/B7C402A5-E4C1-443E-B03A-4935BD79FA2A/0/may06item4.pdf Kent County Council] A report by the Head of Transport Projects to the Highways Advisory Board on 2nd May 2006]
The three-legged proposal has been to a large degree prematurely announced, aligned with particular developer land-owners interests in mind, over the interests of others.
Constraints
One of the constraints to implementing SMARTLINK is the lack of height and width underneath the existing "Newtown Road" bridge, which lies upon the Cheeseman's Green route. The existing bridge headroom only allows use by mini-buses, restricts two-way traffic and only incorporates a narrow elevated footway on one side of the carriageway. Several scheme options have been assessed and the preferred option is to replace the existing bridge with a new bridge to current design standards. This will improve accessibility by bus, cycle and pedestrians between the town centre and the surrounding south-eastern area of the town.
Proposed works include -
*Improving the existing headroom under the bridge from 3.0metre s to 3.7 m in order to allow use of "Newtown Road" by single decker buses, including future SMARTLINK buses.
*To increase the width of the carriageway from 5.1 m to 6.3 m to allow the free and safe flow of two-way traffic including buses.
*To replace the existing narrow 1.5 m elevated footway with a 4.25 m wide segregated footway/cycleway to facilitate the safe passage of cyclists and pedestrians.In the longer term, the objective is for "Newtown Road" to be improved in further phasesto provide a strategic highway network extending south-east of the town to provideimproved multi-modal access to the housing areas of Cheeseman's Green and theemployment areas of "Waterbrook" and the "Orbital Business Park." [http://www.kent.gov.uk/NR/rdonlyres/B7C402A5-E4C1-443E-B03A-4935BD79FA2A/0/may06item4.pdf Kent County Council] A report by the Head of Transport Projects to the Highways Advisory Board on 2nd May 2006]
Funding
It is planned that the estimated £30,000,000 cost of the development will be funded -
*within the new housing areas of Cheeseman's Green and Chilmington Green, by the developers and ultimately the new homebuyers
*the remainder being allocated by the Office of the Deputy Prime Minister (ODPM)Completion
The proposal is to deliver SMARTLINK in two phases, phase one by
2012 , with phase two by2016 , dependent upon the development of Cheeseman's Green and Chilmington Green. In practice, it is expected that the Park & Ride scheme will be in place by2009 [ [http://www.ashford.gov.uk/ashfords_future/achievements.asp Ashford's Future] ] (originally2008 ), using conventional buses, but then "streetcar" type vehicles will be brought in to use as the development continues. [http://www.ashford.gov.uk/ashfords_future/master_plan/documents/smartlink.pdf Ashford Borough Council] SMARTLINK scheme appraisal31 March 2006 ]References