- FS Class E412
Infobox Locomotive
name=FS class E412
powertype=Electric
electricsystem=3,000 V DC
15 kV AC
1,500 V DC
tractionmotors=3-phase asynchronous
caption=E412.018 inVerona station
builddate=1996 – 1998
builder=Adtranz , then Bombardier
weight=88.7 tons
uicclass=Bo-Bo
firstrundate=1997
disposition=still in service
numinclass=20 as model E412, 8 as EU43
wheeldiameter=1.1 m
poweroutput=6,000 kW with 3 kV
5,500 kW with 15 kV AC
2,700 kW with 1.5 kV
wheelbase=11.4 m between bogies
2.65 m between axles in each bogie
tractiveeffort=227 kN
topspeed=220 km/h (limited to 200 km/h inItaly )
length=19.4 m
width=2.85 m
height=4.1 m
transmission=1/3.65 gear ratio
railroad=Trenitalia
The E412 class (factory name 112E) is a batch of multi-role electriclocomotive s built for the mountain lines, particularly for the northern Italian lines of theBrenner pass . They are known as "Brenner" or "Brennerlok" locomotives. 28 units from both the groups have been acquired byTrenitalia , as part of a process of unifying the rail networks betweenItaly ,Switzerland ,Austria andGermany . The locomotives are qualified for running on French rails, too, making the E412s a potentially fit for service on mostEurope an lines except the high speed lines.They were initially produced by
Adtranz (a consortium made up ofABB Trazione andAEG ), but now are built by the Canadian companyBombardier .History
In the early 1990s,
Ferrovie dello Stato started an operational plan to organize an integrated rail system with the countries on Italy's northern border, following the European political-economic unification process. Austria and Germany used differentrailway electrification system s, necessitating the use of a locomotive able to use a variety of electric systems: alternate and direct current, varying from 1,500 to 15,000Volt s.The E412 class was to be used on the longest, steepest and hardest mountain-crossing line, connecting
Verona andBrenner , crowded with cargo and passenger trains and with different electrifications. Before the E412's were introduced, the route required three locomotive changes. The Italian railroad's goal was for trains to reach Germany without changing locomotives.The contract was signed in 1993 with an Italian-German consortium,
Adtranz , headed byABB Trazione andAEG , based inVado Ligure . The first unit was delivered on14 April 1997 . It successfully passed its initial tests, showing excellent performance and strong reliability. The remaining 19 units in the first batch were delivered shortly after the completion of the test to the Italian railway administration. Another 8 (Polish class EU43) were ordered in1996 but never bought by Polish railways (PKP ). Those locomotives were afterwards bought by the Italian companyRail Traction Company to serve on the same line and still have Polish "EU43" designation.In 1998 new trials were made to for service on Swiss lines. These trials resulted in failure when the deal between
Trenitalia and the Logistics division of SBB was scrapped.In 2004 the class was certified as backup power for malfunctioning locomotives. In 2005 talks began to move the class of locomotives to the passenger division, swapping them with older E646 and E656 class locomotives used for passenger service (but better suited for cargo). These machines could be removed from passegner trains, and refitted as E645/E655 by changing the transmission gears. Having 3
bogie s instead of 2, these locomotives have better adhesion on steep grades and can be easily fitted with multiple traction control. However, they are old machines and have proven not very reliable, so they are not suited to the intense use on this line.E412-001 was the first Italian locomotive to be built with the new unified color scheme "XMPR".
The Italian E464 class (for light commuter trains) is based on E412, sharing part of their components to reduce building costs and to simplify maintenance.
Technical
Engine and transmission
The E412 has four very powerful three-phase asynchronous
traction motor s, with an electronic digital traction system based on experience on the E632s, E402s and experimental E444s. The device was modified to adapt it for use with the different voltages, featuring technical innovations such as the use of a primary multitension converter as a front-end inducer to the filter feeding current.The 6 megawatt of nominal power makes these the most powerful electric locomotives in Italy. They are 400 W more powerful than the previous record held by the E402B.
Power supply
Pantographs are single-armed "Y" shaped, built by the German company
Schunk . The two pantographs are different, designed for use on two different electrification systems: one (WBL 85/15, on side B) for the 15 kV alternated, one (WBL 85/3 on side A) for the 3 kW / 1,5 kV continuous. The first can stand 3 kA, the second only 0.8 kA.The closed circuit, liquid cooled converters feed the triphase motors. Every converter gives energy to only one motor on every bogie, to reduce breakdown effects. Two more 450 V 60 Hz converters energize all the secondary devices, including a semiautomatic emergency fire extinguishing system.
Running gear
Bogie s are fixed to the chassis with Flexicoilcoil s, a solution that removes the necessity of a central rotation point. A low traction bar and an auxiliary bar hold the weight: the traction motors are partly placed on these, connected with the Adtranz bogies.Braking on the bogies is made in two ways: mechanical and "energy recover". The first is a common system with 8 self venting discs on the 4 axles, automatically regulated. The second one is an advanced electric system that uses the traction motors as generators, recovering some electricity and sending it back to the line. This is a particularly efficient system on mountain lines, and is currently gaining market shares on different locomotives. The brake has different presets, fitted to cargo trains or passenger trains.
There is a third mechanic "station brake", controlled by electrovalve regulated coils. An emergency system enables the driver to totally shut down the machine pressing two big red buttons on the console, cutting off electricity and engaging the brakes.
Chassis
The chassis is in
steel beams with bent steel foils as coverings, except for the upper part inaluminium and the front shields incomposite plastic s. The front of the two control cabs have two characterizing "masks", styled by the designerRoberto Segoni , made by thermoforming technology. The chassis is solid and compact, well isolated and responding to the strict standards of comfort needed by the new work laws.Controls
The control console is made up of three different but similar parts, to follow Italian, Austrian and German laws. Movement controls are duplicated on both the left and right, and monitors for security systems of both Germany and Italy are present. Moreover, on the right side a third monitor is used for operation in Germany, where the main direction of travel on multiple track lines is the opposite from that of Italy. An on-board computer chooses the active controls, giving priority to one or another based on the electric frequency. The cabs are connected by a corridor, and have climate controls, while in the central body of the locomotive all the technical equipment that can be reached easily from the corridor are placed. The whole electric and electronic systems have a self-control system.
The E412 locomotives have a remote control system made with a UIC TCN-18 cable for use with pilot cars, or for
multiple unit operation (with a 78-wire cable). This could allow the locomotive's use with newer locomotives, but is now certified only for use with the E405. An E412 could serve as master (the locomotive controlled by a human operator), as slave (controlled in remote by another locomotive) or as router (joining a modern 78-wire control connection and an older 18-wire connection).Railway computer games
* The E412 appears in the computer game "Transport Tycoon 3".
* It also appears in "Railroad Tycoon 2 "and "Railroad Tycoon 3 "as "Brenner E412".External links
* [http://loco.leferrovie.it/e412.php Drawings and info on E412]
* [http://www.photorail.com/phr1-leFS/e412.htm Photo gallery]
* [http://www.interlok.info/EU43.htm Technical data on EU43]
* [http://www.rfi.it/quadronormativo/NORMATIVA%20ESERCIZIO/Delibere/2004/3104/d3104all.pdf Decision for use in service by Trenitalia] (PDF)
Wikimedia Foundation. 2010.