- Port of Ashdod
The Port of Ashdod is
Israel 's main cargoport , processing approximately 60% of Israeli marine cargo. The port is located inAshdod , about 25 kilometers south ofTel Aviv , adjoining the mouth of theLachish River . Its establishment doubled the country's port capacity.History
The need to open another deep water port arose in Israel's early years, when it became clear that the expansion of the existing ports of Haifa and Eilat could not ensure efficient handling of the increasing volume of export and import cargoes. The decision to start the new port was based on a number of considerations:
* The port meshes with the concern for population dispersal and the establishment of urban centers in the southern part of the country.
* The port substantially shortens the overland transport of cargoes to and from the southern and central parts of the country.
* The distance from the citrus groves ofRehovot to the Port of Ashdod is 102 km shorter than to Haifa's port and the transport ofpotash fromSodom to the Port of Ashdod is 120 km less than to Haifa.
* The port is close to the existing transport arteries with the possibility of developing new routes in the future.
* The port is situated near the industrial and production centers of the country, as well as toTel Aviv , the commercial center.The Port of Ashdod remains one of the few deep water ports in the world to be built on the open sea, and its construction involved great engineering challenges. The decision on the location and construction of the port was preceded by a maritime and climatic survey which confirmed the engineering feasibility of its construction. The physical design began in
1957 -1958 , a critical time, both from the point of view of the development of maritime transport and port facilities for cargo handling, and from the point of view of the development of cargo vessels. It was during this period that modern shipping concepts began to be applied throughout the world.Its construction was based on a long term development plan. Breakwaters were built to create a harbor where
quay s could be built and developed in stages. In the first stage, quays 1 and 3 were built, mainly for the handling of citrus and other agricultural exports.Other parts of the port were allocated for future development, as special needs arose.Thanks to this approach, the Port of Ashdod has managed so far to supply satisfactory solutions to the new types of cargoes and vessels which developed since its opening.Modern vessels, maritime transport methods, and appropriate port facilities have developed very rapidly over the last 30 years. World shipping has undergone a real revolution vis-a-vis vessel size, new cargo handling concepts based on containerized and unitized cargo, large consignments of liquid and dry bulk products. etc.The port began operations on
November 21 ,1965 , with the entry of the Swedish ship "Wingland" and its cargo of sugar.Expansion activities
Currently the port is in the midst of a large scale expansion program. Completed in
2006 , stage 1 of the program involved extending the main breakwater by 1150 meters and reclaiming 100hectare s which allowed the addition of 1700 meters of new operational quays capable of supporting Super Post-Panamax vessels. [ [http://www.port-technology.com/projects/ashdod/ Ashdod Port Development, Israel] port-technology.com]During the construction of the breakwater, retired IDF Chief of Staff
Rafael Eitan who was supervising the construction died when he was swept off the breakwater by a large wave into rough seas. [ [http://www.jafi.org.il/education/100/people/bios/raful.html Rafael ("Raful") Eitan (1929-2004)] The Jewish Agency for Israel] In his honor the new section of the port has been named the 'Eitan Terminal'.During stage 2 a secondary 1000 meter breakwater will be built and additional reclamation will allow the construction of another 2150 meters of quay for containers, bulk and general cargo.
In addition, plans also include the construction and development of cargo storage areas, operational and service structures for employees, electrical and communications networks, a modern gate complex, access roads to the local and national traffic network and a railway terminal.
General cargo
Most of the work is carried out on six conventional piers which handle such cargoes as agricultural exports, citrus fruit, timber, metals, pelletized cargo, sling cargo,
bulk cargo in grabs, etc. These piers can handle all types of ships of up to 30,000 tons.Pier no. 5 has been deepened and fitted to workPanamax type ships of up to 60,000 tons deadweight. The piers are outfitted with excellent equipment for efficient working. There are also 4berth s for Roll On/Roll Off ships, one of them on the container pier.Storage
The port's storage space totals about 500,000 m². Of these, 50,000 m² are covered, for general cargo storage. There is also a special shed for storing
hazardous material s, chemicals, etc. which may not be stored in enclosed spaces or open areas.Coal pier
In the second half of 1990 the first generating unit in the new power station at
Zikim , nearAshkelon , went into operation, fired by coal imported through the Port of Ashdod.The port has the necessary facilities for moving the incoming coal from the coal pier to the coal storage yard in the rear of the port, east of the Ashdod power station. There it is loaded on rail freight cars for transport to the power station at Zikim.In 1988 the building of pier 9 was completed, which made possible the unloading of 2.5 million tons coal per year.In August 1989, the building of a conveyor, which transports coal from pier 9 to the coal yard, was completed, and with it the Port of Ashdod's preparation for the "coal age" was concluded on schedule.In September 1989, the 120,000 ton collier M.S. Leon entered port with 85,000 tons of coal. The coal was unloaded by crane unto the conveyor and taken to the Coal Company at the rear of the Ashdod power station. The big ship was brought into port by modern Voit-Schneider type
tugboat s, which have an exceptional maneuverability and abollard pull of 35 and 45 tons respectively.Bringing 160,00 G.R.T. ships into the port (at partial load capacity) is a considerable accomplishment in view of the fact that the Port of Ashdod was planned for navigation by ships of maximum deadweight of 30,000 tons.Bulk handling
The specialized minerals handling pier was opened in 1967. In 1979 more modern systems were added to the old ones. All are computer controlled.The bulk installations can store 240,000 tons of phosphates (in 10 separate categories) and 140,000 tons of
potash (separated in 5 categories).Themineral s arrive in the port in special railcars and trucks. Their discharge into the stores is carried out by conveyor systems and heaping machinery, at a rate of 800 to 1,500 tons per hour. The loading ontoship s is carried out by two loaders, one at a rate of 800 tons per hour and the other at 1,600 tons per hour. Another loader is to be installed shortly to speed the operation.The potash loading ships anchor at the dolphins, where the water's depth is 12.5 meters, allowing the mooring ofPanamax ships of up to 225 meters in length and 60,000 tons capacity.Passengers and cruise ships
Following the signing of the interim agreement between the governments of
Israel andEgypt in the spring of 1975, the era of passengercruise ship s opened in the port.In September1975 , the first ship, Stella Polaris, arrived in the port fromAlexandria .In 1981, the traffic gathered momentum and since then the tourist traffic through the port has been growing. The terminal adjoins the debarkation area and allows passengers quick and convenient access. As the passenger traffic grew, the building of a new passengers terminal was approved and it is now in an advanced stage of planning.All passenger ship matters are handled by the security department and port services.Mechanical equipment
*Forklifts:75 units, diesel and electric, lifting capacity from 2.2 to 4 tons.18 units with lifting capacity from 7 to 12 tons.20 units with lifting capacity from 18 to 42 tons.70 units of
pallet jack manual electric forklifts.
*Tractors, bulldozers and trailers:55 transtainers.24 bulldozers, tracked and wheeled.230 trailers.
*Cranes:28 shore cranes 8-50 tons.5 mobile cranes 35 tons.10 container cranes.2 multi-purpose cranes.
*Other equipment:Grabs, compressors, loose bulk funnels and various other cargo handling equipment.See also
*
List of seaports
*Cargo ship
*Shipping References
External links
* [http://www.ashdodport.org.il/ Official website]
Wikimedia Foundation. 2010.