- Susquehanna River Bridge
Infobox_Bridge
bridge_name= Susquehanna River Bridge
caption=
official_name=
also_known_as=
carries= 4 lanes of I-76
crosses=Susquehanna River
locale=Harrisburg, Pennsylvania
maint=Pennsylvania Turnpike Commission
id=
design= 1950 bridge:steel plate girder bridge ; 2007 bridge: concretesegmental bridge
mainspan=
length= 4,526 feet
width=
clearance=
below=
traffic=
open= old bridge: 1950; new bridge: 2007
closed=
toll= Fares dictated byPennsylvania Turnpike
(E-ZPass )
map_cue=
map_
map_text=
map_width=
coordinates= Coord|40|12|15|N|76|48|18|W|region:US_type:landmark|display=inline,titleThe Susquehanna River Bridge carries Interstate 76 (
Pennsylvania Turnpike ) across theSusquehanna River between Dauphin and York County nearHarrisburg, Pennsylvania .History
The original structure was built as a
steel girder bridge with concrete piers. The steel was provided from a plant operated byBethlehem Steel , directly adjacent to the turnpike inSteelton, Pennsylvania . [cite web| url=http://www.pahighways.com/toll/PATurnpike.html| date=October 6, 2006| title= History of the Pennsylvania Turnpike|first=| last=Pennsylvania Highways| publisher=pahighways.com| accessdate=2006-12-14] It was opened to traffic in 1950. [cite web| url=http://www.harrisburgriverboat.com/bridges.htm| date=November 29, 2006| title= Bridges on the Susquehanna River|first=| last=Harrisburg Area Riverboat Society| publisher=harrisburgriverboat.com| accessdate=2006-11-29]On
November 16 ,2004 , the Turnpike Commission let a contract for a bridge to replace the 1950 span. [cite web |url= http://kci.com/projects/srb/Overview.htm |title= Susquehanna River Bridge Project - Project Overview |accessdate=2007-07-11 ] Two new 3-lane segmental, concrete signature spans were constructed just upriver from the old 4 lane span. The new span was the first of its type built in Pennsylvania at a cost of nearly $100 million [http://kci.com/projects/srb/] . The westbound span opened on17 May 2007 , and the eastbound span was opened on17 June 2007 . The new roadway and bridges will open to normal traffic flow in Summer 2008. Destruction of the old span was planned to begin in July 2007.References
ee also
*
List of crossings of the Susquehanna River External links
* [http://kci.com/projects/srb/ Susquehanna River Bridge project web site]
Crossings navbox
structure = Bridges
place =Susquehanna River
bridge = Susquehanna River Bridge
bridge signs =
upstream =John Harris Bridge
upstream signs =
downstream =Shocks Mills Bridge
downstream signs = "Pennsylvania Railroad"
Wikimedia Foundation. 2010.