A494 road

A494 road

UK road routebox
road= A494
length-mi= 58
length-km= 92.8
direction= North - South
start= Queensferry
destinations= Mold
Ruthin
Bala
end= Dolgellau
construction-date=
completion-date=
junctions=

ukroadsmall|548
ukroadsmall|550
ukroadsmall|55
ukroadsmall|541
ukroadsmall|549
ukroadsmall|525
ukroadsmall|5104
ukroadsmall|5
ukroadsmall|4212
ukroadsmall|470
The A494 is an important trunk road in Wales. The road runs from "Drome Corner" near Queensferry, the junction of the A548 towards Chester and A550, to Dolgellau, where the road terminates on the A470.

History

The original route followed the North Wales coach road passing through Sealand, Shotton and Queensferry until the canalised section of the River Dee opened in the 18th century. A hand-operated ferry was then used to transport travellers, animals and vehicles across the New Cut. [http://www.cpat.org.uk/projects/longer/ports/ports.htm] By 1861 the ferry was mechanically operated, with an engine house on the Queensferry side.

In 1897 the Queen Victoria Jubilee Bridge, a single-arched stone bridge, was opened. However by the early 1920s, with increasing numbers of motor vehicles, the area was becoming notorious for traffic congestion. The stone bridge was proving too narrow for the road's larger vehicles.

The New Jubilee Bridge, a steel rolling bascule bridge, was opened by the Ministry of Transport for the newly named A494 in 1926. The original bridge was demolished although the [http://www.geograph.org.uk/photo/410716 stone abutments] can still be seen today.The New Jubilee Bridge then remained the sole road crossing until the late 1950s. By then traffic levels had again risen making this bridge obsolete.

The Queensferry bridge over the River Dee—on the main route from the north in Wales—is barely wide enough for two lines of vehicles, and five-mile traffic jams are normal. [http://www.time.com/time/magazine/article/0,9171,869049,00.html]

In the 1960s, a dual carriageway and new bridge was constructed by-passing the old route through Shotton and Queensferry.This route had remained unchanged until an upgrade in 2004.

Queensferry to Ewloe

This section forms part of the North Wales coast route between Holyhead and the M56 motorway. The section of the A494 north of the River Dee was upgraded to 4-lanes plus hard shoulders in each direction in 2004 as part of a wider scheme, which upgraded the A550 as well, although not all of the lanes on the A494 have been opened.

The next stage of the scheme was to widen a 2.5 mile stretch of the A494 from the River Dee up Aston Hill to the "Ewloe Interchange", the junction of the A55 and A494, to 3 and 4-lane plus hard shoulder standard.

In April 2006, local residents living at Aston Hill, part of the proposed route, began a campaign to oppose any further widening of the A494. [ [http://news.bbc.co.uk/2/hi/uk_news/wales/north_east/6246209.stm BBC NEWS | UK | Wales | North East Wales | Protest over road-widening plans ] ] After 15 months, protesters' high-profile message had garnered more than 2300 individual letters and numerous petitions rejecting the proposals. [ [http://www.eveningleader.co.uk/news?articleid=3014612 Mass protest call by A494 campaigners - Evening Leader ] ] A Planning Inquiry was held in September - October 2007.

In March 2008 the proposals (in entirety) were ordered to be scrapped by the Ieuan Wyn Jones, Deputy First Minister, responsible for Transport at the Welsh Assembly.

"In reaching my decision I have taken account of the concerns raised by the inspector that the overall size of the scheme would have a significant impact on the landscape and would affect walking and cycling routes. I have also noted [the planning inspector's] remarks that while he considers that this section of the A494 will need some form of improvement in the foreseeable future, he considers that the scale of the scheme as originally proposed is greater than required." Deputy First Minister Ieuan Wyn Jones [http://news.bbc.co.uk/1/hi/wales/7315973.stm]

This part of the A494 will remain a two-lane dual carriageway and the speed limit will be 50mph.

The decision has left a question mark over the future of the remaining upgrade at "Ewloe Interchange".

Resentment also remains within the Aston Hill community as thirty households were evicted from their homes earlier in the scheme. These houses were earmarked to be demolished to make way for the road-widening works. [ [http://www.eveningleader.co.uk/news/Evicted-man-slams-Welsh-Assembly.3925046.jp Evicted man slams Welsh Assembly over scrapped A494 plans - Evening Leader ] ] No decision has been made about the future of these properties.

Ewloe to Corwen

South of the Ewloe interchange, the A494 is entirely single-carriageway trunk road, with much lower traffic flows than the A494 to the north of the Ewloe Interchange. This section is approximately 25 miles (40 km) in length. There is a bypass for Mold before the road runs through Ruthin and several smaller villages before meeting the A5 at Corwen at a T-junction. There follows a short concurrency with the A5 at this point.

Despite being the most important road in this area, much of the traffic follows the largely parallel A5104 between the A55 and Corwen.

Druid to Dolgellau

The A494 emerges from the concurrency with the A5 at Druid, heading south-west for a further 27 miles (44 km) to the town of Dolgellau. After a few miles from Druid, it runs through the town of Bala, before meeting Llyn Tegid. As it does so, the road enters the Snowdonia National Park. It runs along the side of the lake for 4 miles (6 km), after which it largely follows the Afon Wnion with the famous mountain Cadair Idris in front, before terminating at Dolgellau at a T-junction with the A470, itself an important trunk route in Wales.

References

*http://www.time.com/time/magazine/article/0,9171,869049,00.html
*http://news.bbc.co.uk/1/hi/wales/7315973.stm
*http://www.cbrd.co.uk/futures/junction/a5117.shtml
*http://www.highways.gov.uk/roads/projects/5018.aspx
*http://www.cpat.org.uk/projects/longer/ports/ports.htm

External links

* [http://www.road-to-nowhere.co.uk/route-guides/A494.htm Road to Nowhere: A494]


Wikimedia Foundation. 2010.

Игры ⚽ Нужен реферат?

Look at other dictionaries:

  • A525 road — UK road routebox road= A525 length mi= 73 length km= 116.8 direction= North South start= Rhyl destinations= Rhuddlan Denbigh Ruthin Wrexham Whitchurch end= Newcastle under Lyme construction date= completion date= junctions= ukroadsmall|548… …   Wikipedia

  • A55 road — The A55 at Warren Mountain. Route information …   Wikipedia

  • A5117 road — The A5117 is a road in Cheshire, England. It runs between Shotwick and Helsby and connects the A550 at Woodbank to the M56. As such it forms a northerly bypass to Chester and a shorter route between the North West and North Wales than the A55.… …   Wikipedia

  • North Circular Road — A406 redirects here. For the proposed motorway in France, see A406 autoroute. For the ship, see RFA Hebe (A406). For other uses, see North Circular Road (disambiguation). A406 road Major junctions …   Wikipedia

  • A361 road — Route information Length: 195 mi (314 km) Major junctions …   Wikipedia

  • A4119 road — Route information Length: 19.5 mi (31.4 km) History: Construction completed 1995 …   Wikipedia

  • Oxford Ring Road — exits Woodstock Road A34 North, A44 A40 A4144 (Woodstock Road South) …   Wikipedia

  • A473 road — Major junctions Northeast end: Upper Boat   …   Wikipedia

  • A452 road — Road network Roads in the United Kingdom Motorways • A and B road zones The A452 is a road in England, which runs from …   Wikipedia

  • A roads in Zone 4 of the Great Britain numbering scheme — The numbering zones for A roads in Great Britain List of A roads in zone 4 in Great Britain starting north of the A4 and south/west of the A5 (roads beginning with 4). Contents …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”