- Sydney Opera House
Infobox building|right
building_name=Sydney Opera House
building_type=Arts complex
architectural_style=Expressionist
structural_system=Concrete frame & precast concrete ribbed roof
location=Sydney, Australia
completion_date=1973
opened = 20 October 1973
main_contractors=Civil & Civic (level 1), M.R. Hornibrook (level 2 and 3 and interior)
architect=Jørn Utzon
structural_engineer=Ove Arup & Partners|The Sydney Opera House is located in Sydney,New South Wales , Australia. It was made aUNESCO World Heritage Site on 28 June 2007. [cite news
last = Braithwaite
first = David
title = Opera House wins top status
publisher = The Sydney Morning Herald
date =2007-06-28
url = http://www.smh.com.au/news/travel/opera-house-wins-top-status/2007/06/28/1182624058781.html
accessdate = 2007-06-28 ] Based on the competition winning entry by Danish architectJørn Utzon , the Sydney Opera House is one of the world's most distinctive 20th century buildings, and one of the most famousperforming arts venues in the world.Louis Kahn remarked: "The sun did not know how beautiful its light was until it was reflected off this building".The Sydney Opera House is situated on Bennelong Point in Sydney Harbour, close to the
Sydney Harbour Bridge . The building and its surroundings are one of the best known icons of Australia.As well as many touring
theatre ,ballet , and musical productions, the Opera House is the home ofOpera Australia , theSydney Theatre Company and theSydney Symphony . It is administered by theSydney Opera House Trust , under the New South Wales Ministry of the Arts.__TOC__
Description
Infobox World Heritage Site
WHS = Sydney Opera House
State Party = AUS
Type = Cultural
Criteria = i
ID = 166
Region = Asia-Pacific
Year = 2007
Session = 31st
Link = http://whc.unesco.org/en/list/166The Sydney Opera House is an expressionist modern design, with a series of large precast concrete 'shells' [ [http://nsw.royalsoc.org.au/journal_archive/106_12_lewis.html Shells of the Sydney Opera House] , The Royal Society of New South Wales] , each taken from a hemisphere of the same radius, forming the roofs of the structure. The Opera House covers 1.8 hectares (4.5 acres) of land. It is 183 metres (605 feet) long and about 120 metres (388 feet) wide at its widest point. It is supported on 588 concrete piers sunk up to 25 metres below sea level. Its power supply is equivalent for a town of 25,000 people. The power is distributed by 645 kilometres of electrical cable.Fact|date=February 2007
The roofs of the House are covered with 1,056,006 glossy white and matte cream Swedish-made tiles [cite web
title = Företagsbroschyr
work = CCHöganäs
publisher = CCHöganäs
url = http://www.cchoganas.se/category.jsp?category=177&p=8#
accessdate = 2008-03-10 ] , though from a distance the tiles look only white. Despite their self-cleaning nature, they are still subject to periodic maintenance and replacement.Fact|date=February 2007The Concert Hall and Opera Theatre are each contained in the two largest groups of shells, and the other theatres are located on the sides of the shell groupings. The form of the shells is chosen to reflect the internal height requirements, rising from the low entrance spaces, over the seating areas and up to the high stage towers. A much smaller group of shells set to one side of the Monumental steps houses the Bennelong Restaurant. Although the roof structures of the Sydney Opera House are commonly referred to as shells (as they are in this article), they are in fact not shells in a strictly structural sense, but are instead precast concrete panels supported by precast concrete ribs. The building's interior is composed of pink granite quarried in Tarana and
wood and brush boxplywood supplied from Wauchope in northern New South Wales. [cite web
title = Sydney Opera House
work = Tom Fletcher
publisher =
url = http://www.sydneyarchitecture.com/ROC/QUA01.htm
accessdate = 2008-02-10 ]Performance venues and facilities
The Sydney Opera House contains five main performance spaces, other areas used for performances, a recording studio, five restaurants, and four souvenir shops.
The five venues making up the main performance facilities:
* The Concert Hall, with 2,679 seats, is the home of theSydney Symphony , and used by a large number of other concert presenters. It contains theSydney Opera House Grand Organ , the largest mechanical tracker action organ in the world, with over 10,000 pipes.Fact|date=February 2007
* The Opera Theatre, aproscenium theatre with 1,547 seats, is the Sydney home ofOpera Australia andThe Australian Ballet .
* The Drama Theatre, aproscenium theatre with 544 seats, is used by theSydney Theatre Company and other dance and theatrical presenters
* The Playhouse, anend-stage theatre with 398 seats
* The Studio, a flexible space, with a maximum capacity of 400 people, depending on configurationOther spaces used for performances and other events include:
* The Utzon Room , a small multi-purpose venue, seating up to 210. It is the only interior space to have been designed by Utzon, having been renovated in 2004 under his direction.
* The Forecourt, a flexible open-air venue with a wide range of configuration options, including utilising the Monumental Steps as audience seating, used for a range of community events, Live Sites, and special-occasion performances Besides theatrical productions and concerts, venues at the Sydney Opera House are also used for activities such as conferences, ceremonies, and social functions.Construction history
Origins
Planning for the Sydney Opera House began in the late 1940s when Eugene Goossens, the Director of the NSW State Conservatorium of Music, lobbied for a suitable venue for large theatrical productions. The normal venue for such productions, the
Sydney Town Hall , was not considered large enough. By 1954, Goossens succeeded in gaining the support of NSW PremierJoseph Cahill , who called for designs for a dedicated opera house. It was also Goossens who insisted that Bennelong Point be the site for the Opera House. Cahill had wanted it to be on or near Wynyard Railway Station in the north-west of the CBD. [http://www.sydneyarchitecture.com/ROC/QUA01.htm] Fact|date=February 2007The competition was launched by Cahill on 13 September 1955 and received a total of 233 entries from 32 countries. The criteria specified a large hall seating 3000 and a small hall for 1200 people, each to be designed for different uses including full-scale operas, orchestral and choral concerts, mass meetings, lectures, ballet performances and other presentations. [cite book
last = Ziegler
first = Oswald
title = Sydney Builds an Opera House
publisher = Oswald Ziegler Publications
year = 1973
location =
pages = p. 35"'
isbn = ] The basic design announced in 1957 was submitted byJørn Utzon , a Danish architect. Utzon arrived in Sydney in 1957 to help supervise the project. [cite web
title = Millennium Masterwork: Jorn Utzon's Sydney Opera House
work = Hugh Pearman
publisher = Gabion
url = http://www.hughpearman.com/articles/sydney.htm
accessdate = 2007-06-28 ]Design and construction of the Opera House
The
Fort Macquarie Tram Depot , occupying the site at the time of these plans, was demolished in 1958, and formal construction of the Opera House began in March, 1959. The project was built in three stages. Stage I (1959–1963) consisted of building the upper podium. Stage II (1963–1967) saw the construction of the outer shells. Stage III consisted of the interior design and construction (1967–73).tage I: Podium
Stage I commenced on 5 December 1958, by the construction firm
Civil & Civic . The government had pushed for work to begin early fearing that funding, or public opinion, might turn against them. However major structural issues still plagued the design (most notably the sails, which were still parabolic at the time). By 23 January 1961, work was running 47 weeks behindFact|date=February 2007, mainly because of unexpected difficulties (inclement weather, unexpected difficulty diverting stormwater, construction beginning before proper construction drawings had been prepared, changes of original contract documents). Work on the podium was finally completed on 31 August 1962. The forced early start led to significant later problems, not least of which was the fact that the podium columns were not strong enough to support the roof structure, and had to be re-built.cite book
last = Murray
first = Peter
title = The Saga of the Sydney Opera House
publisher = Spon Press
year = 2004
location = London
pages =
isbn = 0415325218 ]tage II: Roof
concrete would have been prohibitively expensive, but because there was no repetition in any of the roof forms the construction of precast concrete for each individual section would possibly be even more expensive.
From 1957 to 1963 the design team went through at least twelve iterations of the form of the shells trying to find an economically acceptable form (including schemes with parabolas, circular ribs and
ellipsoids ) before a workable solution was completed. The design work on the shells involved one of the earliest uses ofcomputers instructural analysis in order to understand the complexforces the shells would be subject to.Jones, Peter: "Ove Arup: Masterbuilder of the Twentieth Century". Yale University Press, 2006.] In mid-1961 the design team found a solution to the problem: the shells all being created as sections from asphere .With whom exactly this solution originated has been the subject of some controversy. It was originally credited to Utzon. Ove Arup's letter to Ashworth, a member of the Sydney Opera House Executive Committee, states: "Utzon came up with an idea of making all the shells of uniform curvature throughout in both directions."page 199] Peter Jones, the author of Ove Arup's biography, states that "the architect and his supporters alike claimed to recall the precise "eureka" moment ...; the engineers and some of their associates, with equal conviction, recall discussion in both central London and at Ove's house". He goes on to claim that "the existing evidence shows that Arup's canvassed several possibilities for the geometry of the shells, from parabolas to ellipsoids and spheres." Yuzo Mikami, a member of the design team, presents an opposite view in his book on the project, "Utzon's Sphere".cite web | author=Bentley, Paul| month=September | year=2001 | title=A Matter of Integrity – A Review of Yuzo Mikami's "Utzon's Sphere"| publisher=The Wolanski Foundation | url=http://www.twf.org.au/research/mikami.html | accessdate=2007-01-30] [Mikami, Yuzo: "Utzon's Sphere", Tokyo: Shoku Kusha. 2001.] It is unlikely that the truth will ever be categorically known, but there is a clear consensus that the design team worked very well indeed for the first part of the project and Utzon, Arup, and Ronald Jenkins (partner of Ove Arup and Partners responsible for the Opera House project) all played a very significant part in the design development.cite web | author=Hunt, Tony| month=October | year=2001 | title=Utzon's Sphere: Sydney Opera House - How It Was Designed and Built - Review| publisher=EMAP Architecture, Gale Group | url=http://www.findarticles.com/p/articles/mi_m3575/is_1256_210/ai_79759827 | accessdate=2007-01-30] As Peter Murray states in "The Saga of the Sydney Opera House"Murray, P: "The Saga of the Sydney Opera House", 2004, Spon Press (UK), ISBN 0415325218] :
The shells were constructed by Hornibrook Group Pty Ltd [ [http://www.bilfingerberger.com/C1257130005050D5/vwContentByKey/W26U3AX8814LUNADE/$FILE/bb_historie_en.html Bilfinger Berger corporate history] ] , who were also responsible for construction in Stage III. Hornibrook manufactured the 2400 precast ribs and 4000 roof panels in an on-site factory, and also developed the construction processes. The achievement of this solution avoided the need for expensive formwork construction by allowing the use of precast units (it also allowed the roof tiles to be prefabricated in sheets on the ground, instead of being stuck on individually at height). Ove Arup and Partners' site engineer supervised the construction of the shells which used an innovative adjustable steel trussed 'erection arch' to support the different roofs before completion. On 6 April 1962 it was estimated that the Opera House would be completed between August 1964 and March 1965. By the end of 1965, the estimated finish for stage II was July 1967.Fact|date=February 2007
tage III: Interiors
Stage III, the interiors, started with Utzon moving his entire office to Sydney in February 1963. However, there was a change of government in 1965, and the new
Robert Askin government declared the project under the jurisdiction of the Ministry of Public Works. This ultimately led to Utzon's resignation (see below).The cost of the project so far, even in October of that year, was still only $22.9 million,Fact|date=February 2007 less than a quarter of the final cost. However the projected costs for the design were at this stage much more significant.
In 1966, following Utzon's resignation, the acoustic advisor, Lothar Cremer, confirmed to SOHEC that Utzon's original acoustic design only allowed for 2000 seats in the main hall, and further stated that increasing the number of seats to 3000 as specified in the brief would be disastrous for the acoustics. According to Peter Jones, the stage designer, Martin Carr, criticised the "shape, height and width of the stage, the physical facilities for artists, the location of the dressing rooms, the widths of doors and lifts, and the location of lighting switchboards".page203]
The second stage of construction was still in process when Utzon resigned. His position was principally taken over by Peter Hall, who became largely responsible for the interior design. Other persons appointed that same year to replace Utzon were E. H. Farmer as government architect, D. S. Littlemore and Lionel Todd.
The four significant changes to the design after Utzon left were:
# The cladding to the podium and the paving (the podium was originally not to be clad down to the water, but to be left open).Fact|date=February 2007
# The construction of the glass walls (Utzon was planning to use a system of prefabricated plywoodmullions , but a different system was designed to deal with the glass).Fact|date=February 2007
# Use of the halls (The major hall which was originally to be a multipurpose opera/concert hall, became solely a concert hall, called the Concert Hall. The minor hall, originally for stage productions only, had the added function of opera and ballet to deal with and is called the Opera Theatre. As a result, the "Opera Theatre" is inadequate to stage large scale opera and ballet. A theatre, a cinema and a library were also added, (later changed to two live drama theatres and a studio). These changes were primarily because of inadequacies in the original competition brief, which did not make it adequately clear how the Opera House was to be used. The layout of the interiors was changed and the stage machinery, already designed and fitted inside the major hall, was pulled out and largely thrown away.Fact|date=February 2007
# The interior designs: Utzon's plywood corridor designs, and his acoustic and seating designs for the interior of both major halls, were scrapped completely. His design for the Concert Hall was rejected as it only seated 2000, which was considered insufficient. Utzon employed the acoustic consultant Lothar Cremer, and his designs for the major halls were later modelled and found to be very good.Fact|date=February 2007 The subsequent Todd, Hall and Littlemore versions of both major halls have some problems with acoustics, particularly for the performing musicians. The orchestra pit in the Opera Theatre is cramped and dangerous to musicians' hearing. [cite web | author=Sydney Morning Herald (Joyce Morgan) | month=November | year=2006 | title=The phantoms that threaten the opera house | url=http://www.smh.com.au/news/national/the-phantoms-that-threaten-the-opera-house/2006/11/10/1162661901377.html | accessdate=2007-03-13] The Concert Hall has a very high roof leading to lack of early reflections onstage - perspex rings (the "acoustic clouds") hanging over the stage were added shortly before opening in an (unsuccessful) attempt to address this problem.Fact|date=February 2007The Opera House was formally completed in 1973, having cost $102 million. H.R. ‘Sam’ Hoare, the Hornibrook director in charge of the project, provided the following approximations in 1973:Stage I: podium Civil & Civic Pty Ltd approximately $5.5m. Stage II: roof shells M.R. Hornibrook (NSW) Pty Ltd approximately $12.5m. Stage III: completion The Hornibrook Group $56.5m. Separate contracts: stage equipment, stage lighting and organ $9.0m. Fees and other costs $16.5m.
The original cost estimate in 1957 was £3,500,000 ($7 million). The original completion date set by the government was 26 January 1963 (
Australia Day ).ref]Utzon and his resignation
Before the Sydney Opera House competition, Utzon had won seven of the eighteen competitions he had entered, but had never seen any of his designs built.page174] Utzon's submitted concept for the Sydney Opera House was almost universally admired and considered groundbreaking. The Assessors Report of January 1957, stated:
For the first stage of the project Utzon worked very successfully with the rest of the design team and the client, but as the project progressed it became clear (with the revised hall usage insisted by the clients) that the competition requirements had been inadequate with regards to acoustics, specifications of performance spaces and other areas, and that the client had not appreciated the costs or work involved in design and construction. Tensions between the client and the design team grew further when an early start to
construction was demanded despite an incomplete design.The relationship of client, architect, engineers and contractors became an increasing point of tension, between Utzon and the clients, and also Utzon and Arup. Utzon believed the clients should receive information on all aspects of the design and construction through his practice, while the clients wanted a system (notably drawn in sketch form by
Davis Hughes ) where architect, contractors, and engineers each reported to the client directly. This difference had great implications forprocurement methods and cost control, with Utzon wishing to negotiate contracts with chosen suppliers (such as Ralph Symonds for the plywood interiors), and the Australian government insisting contracts were put out to tender.However, the reasons for Arup's need to be able to contact the clients directly were equally clear. Peter Murray explains that:
Utzon was highly reluctant to respond to questions or criticism from the client's "Sydney Opera House Executive Committee" (SOHEC).page 191] However Utzon was greatly supported throughout by Professor
Harry Ingham Ashworth , a member of the committee and one of the original competition judges. However, the relationship was not helped by Utzon, who was unwilling to compromise on some aspects of his designs that the clients wanted to change. As he said to Jack Zunz, the senior member of the structural design team, in 1961: "I don't care what it costs. I don't care how long it takes. I don't care what scandal it causes. That is what I want."page 200]Utzon consistently claimed to have solved all problems "in his head", but he was reluctant to produce either drawings or documentation in order to demonstrate, cost or later construct his design vision. Peter Murray states:
During the concept and early design stages this was no problem, but later in the process it led to considerable tensions. Utzon's ability was never in doubt, and indeed Ove Arup stated that Utzon was "probably the best of any I have come across in my long experience of working with architects", and: "The Opera House could become the world's foremost contemporary masterpiece if Utzon is given his head."page 209]
Throughout the following years the relationship only got worse, with Utzon refusing access to drawings and documents by the Minister of Public Works' representative, and in 1964 dropping all first names from project correspondence, referring to people only as "Dear Sir".page ] At the same time, there were also arguments over work Utzon had carried out and not received payment for. Arups were increasingly cast in the role of peacekeepers, and had to reconcile the two sides. Jack Zunz, a member of the Arup design team, stated following a meeting with Utzon in London in 1964:
In May 1965,
Davis Hughes became Minister for Public Works. In October 1965, Utzon gave Hughes a schedule setting out the completion dates of parts of his work for stage III.Fact|date=February 2007 Hughes withheld permission for the construction of plywood prototypes for the interiors.Fact|date=February 2007Utzon was at this time working closely with
Ralph Symonds , a manufacturer ofplywood based in Sydney and highly regarded by many, despite Arup's warnings in March 1964 that Ralph Symonds' "knowledge of the design stresses of plywood, was extremely sketchy" and that the technical advice was "elementary to say the least and completely useless for our purposes". Ralph Symonds went broke within the year.page 225] However, the relationship between Utzon and the client never recovered, and the government minutes record that following several threats of resignation, Utzon stated to Davis Hughes: "If you don't do it, I resign". Hughes replied: "I accept your resignation. Thank you very much. Goodbye."page224]Utzon left the project on 28 February 1966. He said that Hughes' refusal to pay Utzon any fees and the lack of collaboration caused his resignation, and later famously described the situation as "Malice in Blunderland". In March 1966, Hughes offered him a reduced role as 'design architect' under a panel of executive architects, without any supervisory powers over the House's construction, but Utzon rejected this.
Following the resignation, there was great controversy about who was in the right and who was in the wrong. The "
Sydney Morning Herald " initially reported:However on 17 March 1966 it reported:page 228]
To this day, opinion is still split on the roles of the different parties in the project. [ [http://www.wsws.org/arts/1998/dec1998/oper-d04.shtml The Sydney Opera House: How government policy imperiled an architectural masterpiece ] ] [ [http://www.chiefengineer.org/content/content_display.cfm/seqnumber_content/1823.htm The Sydney Opera House ] ]
Consequences for Utzon, architecture and engineering
In an article in "Harvard Design Magazine" in 2005 [http://flyvbjerg.plan.aau.dk/HARVARDDESIGN63PRINT.pdf] , professor
Bent Flyvbjerg argues that Utzon fell victim to a politically lowballed construction budget, which eventually resulted in acost overrun of 1,400 percent. The overrun and the ensuing scandal that it created kept Utzon from building more masterpieces. This, according to Flyvbjerg, is the real cost of the Sydney Opera House.The Sydney Opera House opened the way for the immensely complex geometries of some modern architecture. The design was one of the first examples of the use of
computer analysis to design complex shapes. The design techniques developed by Utzon and Arup for the Sydney Opera House have been further developed and are now used for architecture such as works ofGehry and "blobitecture ", as well as most reinforced concrete structures. The design is also one of the first in the world to usearaldite toglue the precast structural elements together, and proved the concept for future use.The Opera House was also a first in mechanical engineering. Another Danish firm, Steensen Varming, was responsible for designing the new air conditioning plant, the largest in Australia at the time, supplying over 600,000 cubic feet of air per minute [Sunday Mail, 9 April 1972] , using the innovative idea of harnessing the harbour water to create a water cooled heat pump system that is still in operation today [A. Building a masterpiece 2006]
Opening
The Opera House was formally opened by Elizabeth II, Queen of Australia, on 20 October 1973, which a crowd of millionsFact|date=February 2008 attended. The opening was televised and included fireworks and a performance of Beethoven's Symphony No. 9.
Prior to the opening, two performances had already taken place in the finished building. On 28 September, a performance of
Sergei Prokofiev 's opera "War and Peace" was presented in the Opera Theatre. On 29 September, the first public concert in the Concert Hall took place. It was an all-Wagner concert, performed by theSydney Symphony , conducted byCharles Mackerras and with accompanying singerBirgit Nilsson .During the construction of the Opera House, a number of lunchtime performances were arranged for the workers, with
Paul Robeson the first artist to perform at the (unfinished) Opera House in 1960.Reconciliation with Utzon and new works
Beginning in the late 1990s, the
Sydney Opera House Trust began to communicate with Jørn Utzonin an attempt to effect a reconciliation, and to secure his involvement in future changes to the building. In 1999 he was appointed by the Trust as a design consultant for future work. [cite web | author=Sydney Opera House Media Release | month=August | year=1999 | title=Utzon Appointment: 'Reunites The Man and his Masterpiece' | url=http://www.sydneyoperahouse.com/sections/media_room/media_releases/press_release.asp?idPressRelease=15&sm=5&ss=19 | accessdate=2007-03-13] In 2004, the first interior space rebuilt to match Utzon's original design was opened, and renamed "The Utzon Room" in his honour. [cite web | author=chiefengineer.org | title=The Sydney Opera House | url=http://www.chiefengineer.org/content/content_display.cfm/seqnumber_content/1823.htm | accessdate=2007-03-13] In April 2007, he proposed a major reconstruction of the Opera Theatre. [cite news | first=Matthew | last=Benns | coauthors= | title=Utzon wants to tear up floor of the Opera House | date=2007-04-08 | publisher= | url =http://www.smh.com.au/news/arts/utzon-wants-to-tear-up-floor-of-the-opera-house/2007/04/07/1175366528643.html | work =The Sydney Morning Herald | pages = | accessdate = 2007-04-12 | language = ]In 1993
Constantine Koukias was commissioned by the Sydney Opera House Trust in association with REM Theatre to compose "Icon", a large-scale music theatre piece for the 20th anniversary of the Sydney Opera House.Anti-war protest
On 18 March 2003, Dr Will Saunders, a Briton, and David Burgess, an Australian, scaled one of the sails of the Opera house and painted the words 'NO WAR' in prominent red letters as an expression of their objection to the then-proposed involvement of Australian troops in the conflict in
Iraq . The painted message was removed by maintenance workers on the following day. Security services for the Opera House were subsequently upgraded to prevent further unauthorised access. [cite news | first=Jacqueline| last=Maley | coauthors= | title=24-7 guard for Opera House | date=2003-03-19 | publisher= | url =http://www.smh.com.au/articles/2003/03/18/1047749748004.html | work =The Sydney Morning Herald | pages = | accessdate = 2008-10-03 | language = ]ee also
*
Official Openings by the Monarch in Australia
*Wonders of the World References
Further reading
* Hubble, Ava, "The Strange Case of Eugene Goossens and Other Tales from The Opera House", Collins Publishers, Australia, 1988. (Ava Hubble was Press Officer for the SOH for fifteen years).
* Duek-Cohen, Elias, "Utzon and the Sydney Opera House", Morgan Publications, Sydney, 1967-1998. (A small publication originally intended to gather public opinion to bring Utzon back to the project).
* Stuber, Fritz, "Sydney's Opera House - Not a World Heritage Item? - Open letter to the Hon. John W. Howard, Prime Minister", in: Australian Planner (Sydney), Vol. 35, No. 3, 1998 (p. 116); Architecture + Design (New Delhi), Vol. XV, No. 5, 1998 (pp.12-14); collage (Berne), No. 3, 1998, (pp.33-34, 1 ill.).
* [http://www.abc.net.au/news/newsitems/200504/s1355304.htm "Opera House an architectural 'tragedy"', ABC News Online, 28 April 2005.]
* [http://flyvbjerg.plan.aau.dk/HARVARDDESIGN63PRINT.pdf Flyvbjerg, Bent, "Design by Deception: The Politics of Megaproject Approval", "Harvard Design Magazine", Volume 22, 2005.]
* Watson, Anne (editor): "Building a Masterpiece: The Sydney Opera House", 2006, Lund Humphries, ISBN-10: 0853319413, ISBN-13: 978-0853319412External links
* [http://www.sydneyoperahouse.com Official website]
* [http://environment.gov.au/heritage/places/world/sydney-opera-house/index.html World heritage listing for Sydney Opera House]
* [http://image.sl.nsw.gov.au/cgi-bin/ebindshow.pl?doc=on122/a270 Photographs of the construction]
* [http://www.twf.org.au/search/soh1.html Wolanski Foundation's annotated list of sources on Sydney Opera House]
* Photos [http://www.pasaporteblog.com/opera-de-sydney/ Sydney Opera House at Pasaporteblog.com] es
Wikimedia Foundation. 2010.