- Longannet power station
infobox UK power station
country=Scotland
unitary_scotland=Fife
os_grid_reference=NS953852
latitude=56.048942
longitude=-3.682337
operator=Scottish Power
fuel=Coal-fired
fuel_capacity= 2,400MW
opened=1972Longannet power station is a large coal-fired
power station on the upperFirth of Forth nearKincardine on Forth ,Fife ,Scotland . It is the most powerful generating station in Scotland.When constructed it was the largest and most powerful coal-fired station in
Europe , and it is now the third largest, after Bełchatów in Poland and Drax inYorkshire ,England . It is a regional landmark, dominating the Forth skyline with its 183 m (600 feet) chimney stack. Like most other power stations in Scotland it lackscooling tower s, relying instead on river water as a coolant.Capacity
Longannet has an installed capacity of 2,400 MWe (megawatts electrical) which is equivalent to 2
Advanced gas-cooled reactor nuclear stations. There are four 600 MWe generation units, each featuring a singleboiler feeding two 300 MWeGEC turbo-alternator s, with the steam spaces cross coupled. The declared net capacity is rated at 2,304 MW due to operational losses. On average Longannet produces 10.4 TW·h (terawatt hours) per year and in 2000-2001 achieved the highest generation output in its history by supplying more than 12.25 TW·h to the National Grid.Fuel
Construction began in 1962 for the then
South of Scotland Electricity Board (SSEB) adjacent to the existingKincardine power station . Commissioned in 1972, it was originally supplied withcoal directly from its own deep mine at Longannet Colliery. Coal consumption exceeds 10,000tonne s per day. Longannet colliery, by then the last deep mine in Scotland, was forced into premature closure in 2002 due to flooding. All fuel therefore must now be imported, the majority via the formerBritish Steel ore loading facility atHunterston Terminal inAyrshire . Onward transport is by rail and the level of traffic required to supply Longannet's fuel demand has caused extreme congestion on the Scottish rail network. An alternative route, theStirling-Alloa-Kincardine rail link , at the mouth of the river Forth was reopened in 2008.Emissions
Longannet produces
fly ash at the rate of up to 4,350tonne s per day, the majority of which is collected and either sold to industry or mixed with water and piped as a slurry to the nearby Preston Island. Here it is deposited in formersalt pan s, stablised and used to reclaim the land from the Firth of Forth. To improve environmental emissions, Longannet is now fitted with 'Low-NOx' burners to limit the formation of oxides of nitrogen and a 'Gas Reburn system' that usesnatural gas to convert NOx intonitrogen andwater vapour . Longannet also burns up to 65,000 tonnes of treated and driedsewage sludge per year, which has a similarcalorific value to low-qualitybrown coal . In 2005, a judge ruled the burning of sludge as illegal, but theScottish Environment Protection Agency (SEPA) continues to allowScottish Power to burn the sludge illegally as part of an agreement which requires Scottish Power to construct, and have in operation, abiomass plant in 2010. [http://www.scottishgreens.org.uk/site/id/4956/title/Scottish_Power_And_SEPA_Join_Forces_To_Break_The_Law.html] .Ownership
This facility is owned and operated by
Scottish Power , as a subsidiary of the Spanish Electricity Company,Iberdrola .