- Tarniţa - Lăpuşteşti Hydropower Plant
Infobox Dam
dam_name=Tarniţa - Lăpuşteşti
caption=
official_name=Tarniţa - Lăpuşteşti Hydropower Plant
crosses=Someşul Cald River
reservoir=
locale=Lăpuşteşti , Râşca,Cluj County ,Romania
maint=
length=
height=
width=
began=2008-06-15 [ [http://www.standard.ro/articol_52063/hidrocentrala_de_la_tarnita_lapustesti_costa_un_miliard_euro_si_va_fi_finalizata_in_cinci_sase_ani.html Work began on the huge Tarniţa - Lăpuşteşti Hydropower Plant ro icon] ]
cost=Estimated 1 billionEuros [ [http://www.standard.ro/articol_52063/hidrocentrala_de_la_tarnita_lapustesti_costa_un_miliard_euro_si_va_fi_finalizata_in_cinci_sase_ani.html The power plant will cost around 1 billion euros ro icon] ] [ [http://ziuadecluj.eu/action/article?ID=4402 World Bank will finance up to 25 % of the total cost of the project ro icon] ] (1.5 billionU.S. dollars )
reservoir_capacity=
reservoir_catchment=
reservoir_surface=
bridge_carries=
bridge_width=
bridge_clearance=
bridge_traffic=
bridge_toll=
bridge_id=
map_cue=
map_
map_text=
map_width=
coordinates=Tarniţa - Lăpuşteşti Hydropower Plant is a large hydroelectic pumped-storage project on the
Someşul Cald River inCluj County ,Romania .It is currently under construction and at completion it will be the largest hydro-electric load balancing system in Romania. During the night, when the demand is low and electricity is cheap because of powerplants which generate electricity continuously, such as the Cernavodă nuclear power plant, it will use electricity to pump water up the hill, while during the day, it will use the hydro energy to generate electricity.
Location
The Tarniţa - Lăpuşteşti
power station will be located 35km fromCluj Napoca [ [http://www.ziuadecj.ro/action/article?ID=11339 Location of the power plant ro icon] ] , on the left shore of the Someşul Cald River valley in the area of the existingTarniţa accumulation and theLăpuşteşti village (Râşca commune).Power generation
The power station will have four turbines, each capable of producing 250
megawatts , for a total of 1000megawatts [ [http://www.standard.ro/articol_52063/hidrocentrala_de_la_tarnita_lapustesti_costa_un_miliard_euro_si_va_fi_finalizata_in_cinci_sase_ani.html The power plant will have a final power generation capacity of 1000 MW ro icon] ] .chedule
Construction work began on
15 June 2008 . Expectations are that power plant will be completed in2013 or2014 .ee also
*
Hydro-electricity
*Iron Gate I Hydro Power Plant
*Lotru-Ciunget Hydropower Plant References