Line 8, Beijing Subway

Line 8, Beijing Subway

Beijing Line


type = Rapid transit
system = Beijing Subway
status = Operational
locale = Beijing, China
start = South Gate of Forest Park
end = Beitucheng
stations = 4
routes =
ridership =
open = July 19, 2008
close =
owner =
operator = Beijing Mass Transit Railway Operation Corp., Ltd
character =
depot =
stock =
linelength = 4.53 km
tracklength =
notrack =
gauge =
el =
speed =
elevation =

Beijing Subway/8

Line 8 of the Beijing Subway is planned and built in several phases. The first phase, called the Olympic Branch Line is 4.53 km with four stations and connects the Olympic Green (village) with Line 10, north of the city. The Olympic Branch Line has just entered into operation on July 19, 2008 with Line 10. It runs from Beitucheng to Senlingongyuan (Forest Park 森林公园). Construction on Phase I began in 2004. Phase I has four stations: Beitucheng, Olympic Sports Center, Olympic Green, and South Gate of Forest Park.

After the Olympics, Line 8 in Phase II, will be extended north beyond the Line 13, Beijing Subway arc in Changping District, and south into the city centre. The Changping District government has commenced land clearing for Line 8's extension. [ [http://bj.house.sina.com.cn/news/2008-01-30/0759237453.html 北京地铁8号线昌平站点启动拆迁_新浪房产_新浪网 ] ] There are also proposals to extend Line 8 in Phase III, further south from the city center to the southern 4th Ring Road.

References


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Line 5, Beijing Subway — Beijing Line type = Rapid transit system = Beijing Subway status = Operational locale = Beijing, China start = Tiantongyuan North end = Songjiazhuang stations = 23 routes = ridership = open = October 7, 2007 clos = owner = operator = Beijing Mass …   Wikipedia

  • Line 13, Beijing Subway — Beijing Line type = Rapid transit system = Beijing Subway status = Operational locale = Beijing, China start = Xizhimen end = Dongzhimen stations = 16 routes = ridership = open = September 22, 2002 clos = owner = operator = Beijing Mass Transit… …   Wikipedia

  • Line 10, Beijing Subway — Beijing Line type = Rapid transit system = Beijing Subway status = Operational locale = Beijing, China start = Bagou end = Jinsong stations = 22 routes = ridership = opened = July 19, 2008 closed = owner = operator = Beijing Mass Transit Railway… …   Wikipedia

  • Line Batong, Beijing Subway — Beijing Line type = Rapid transit system = Beijing Subway status = Operational locale = Beijing, China start = Sihui end = Tuqiao stations = 13 routes = ridership = open = ? clos = owner = operator = Beijing Mass Transit Railway Operation Corp.,… …   Wikipedia

  • Line 2, Beijing Subway — Beijing Line type = Rapid transit system = Beijing Subway status = Operational locale = Beijing, China start = end = stations = 19 routes = ridership = open = ? clos = owner = operator = Beijing Mass Transit Railway Operation Corp., Ltd character …   Wikipedia

  • Line 1, Beijing Subway — Beijing Line type = Rapid transit system = Beijing Subway status = Operational locale = Beijing, China start = Pingguoyuan end = Sihui East stations = 23 routes = ridership = open = ? clos = owner = operator = Beijing Mass Transit Railway… …   Wikipedia

  • Line 14, Beijing Subway — Line 14 of the Beijing Subway is a planned subway line that will run across the southern and eastern fringes of Beijing. The Line will connect the Marco Polo Bridge in the southwest corner of the city with Wangjing in the northeast and pass… …   Wikipedia

  • Line 7, Beijing Subway — Line 7 of the Beijing Subway is planned to run parallel and to the south of Line 1 and Batong Line, from the Beijing West Railway Station in Xuanwu District to Jiaohuachang in Tongzhou District. Construction is scheduled to begin in 2008 and to… …   Wikipedia

  • Line 6, Beijing Subway — Line 6 of the Beijing Subway is currently under construction and is scheduled to be opened in 2012. The line will run parallel to and north of Line 1 and the Batong Line, from Haidian to Tongzhou District. With total planned length of 41.74 km… …   Wikipedia

  • Line 4, Beijing Subway — Line 4 of the Beijing Subway is currently under construction and is scheduled to open in September of 2009. It will run from north to south, parallel and to the west of Line 5, through Haidian, Xicheng, Xuanwu and Fengtai Districts in the western …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”