- Line 7, Beijing Subway
Line 7 of the
Beijing Subway is planned to run parallel and to the south of Line 1 and Batong Line, from theBeijing West Railway Station inXuanwu District toJiaohuachang inTongzhou District . Construction is scheduled to begin in 2008 and to be completed in 2012. [(Chinese) [http://www.ce.cn/cysc/jtys/csjt/200808/29/t20080829_16656213.shtml 确保明年9月30日按期通车 地铁4号线9月1日复工 北京日报] Aug. 29, 2008]Planned Route
Line 7 was originally slated to have 17 stations, from the Beijing West Station to Baiziwan. [ [http://english.peopledaily.com.cn/90001/90776/90882/6334392.html Beijing Subway Line 7 and Line 14 will begin construction this year - People's Daily Online ] ] A revised plan approved by the Planning Committee of the Beijing Municipal government calls for 22 stations over 23.9 km, ending in Jiaohuachang (Coking Plant) further east. [ (Chinese) [http://www.bjghw.gov.cn/zwgk/list.asp?id=8304&column_id=19&column_layer=020009010010010019&title_name=%B9%EC%B5%C0%BD%BB%CD%A87%BA%C5%CF%DF%B9%E6%BB%AE%B7%BD%B0%B8%CD%A8%B9%FD%D7%A8%BC%D2%C6%C0%C9%F3 "轨道交通7号线规划方案通过专家评审" 轨道协调组] Aug. 7, 2008] The plan map of the Beijing Infrastructure Investment Co. Ltd. shows Line 7 as having 20 stations over 23.1 km, from west to east): [ [http://www.bii.com.cn/xxjs.asp?dj=3&bigClassName=2008%C4%EA%C4%E2%BF%AA%B9%A4%BD%A8%C9%E8%CF%EE%C4%BF&SmallClassName=%B1%B1%BE%A9%B5%D8%CC%FA%C6%DF%BA%C5%CF%DF&admin=1 Line 7 Plan Map, Beijing Infrastructure Investment Co. Ltd.] Accessed on Sept. 6, 2008]
#
Beijing West Railway Station 北京西客站 (Line 9)
# Wanzi 湾子
# Daguanying 达官营
# Baichang Lu 白厂路
# Caishikou 菜市口 (Line 4)
# Hufangqiao 虎坊桥
# Zhushikou 珠市口
# Dushi Jie 都市街
# Ciqikou 瓷器口 (Line 5)
# Xingfu Dajie 幸福大街
# Guangqumen 广渠门
# Xizhaosi 夕照寺
# Jinsong Xikou 劲松西口
# Jinsong 劲松 (Line 10)
# Xidawang Lu 西大望路
# Huagong Lu 化工路
# Huanlegu 欢乐谷
# Daitou 垈头
# Glass Plant No. 2 玻璃二厂
# Coking Plant 焦化厂Notes
Wikimedia Foundation. 2010.