Tōhoku-Chūō Expressway

Tōhoku-Chūō Expressway

Infobox_road
highway_name = Tōhoku-Chūō Expressway (東北中央自動車道)
marker_



length = 27.1 km (Main Route)
8.8 km (Yonezawa Nan-yō Road)cite web| url= http://www.e-nexco.co.jp/more_expressway/data/ | title= E-NEXCO Expressway Data | accessdate= 2008-04-13 ]
established = 1997 [cite web| url= http://yamagata-np.jp/newhp/kiji_2/200711/21/news20071121_0352.php | title= Yamagata Shimbun, November 21, 2007 | accessdate= 2008-05-12 ]
first_open =
starting_terminus = Fukushima Junction in Fukushima, Fukushima

cities = Yonezawa, Yamagata
ending_terminus = Obanazawa-Ōishida Interchange in Obanazawa, Yamagata
The nihongo|Tōhoku-Chūō Expressway|東北中央自動車道|Tōhoku-Chūō Jidōsha-dō (lit. Central Tōhoku Expressway) is a 2-laned national expressway in the Tōhoku region of Japan. It is owned and operated by East Nippon Expressway Company.

Overview

The expressway is incomplete in many areas, however it is planned to eventually connect Fukushima Prefecture with Akita Prefecture via Yamagata Prefecture. [cite web| url= http://www.mlit.go.jp/road/ir/ir-yosan/h20/s07.pdf | title= High Standard Trunk Road Map |author= Ministry of Land, Infrastructure and Transport | accessdate= 2008-04-13 | format=pdf] From Fukushima to Yonezawa the route is incomplete; this section is to be built according to the New Direct Control System and will operate toll-free upon completion. From Yonezawa, a short toll road signed as the Yonezawa Nan-yō Road is designed to become part of the expressway route in the future. As of April 2008 the current Tōhoku-Chūō Expressway extends from Yamagata-Kaminoyama Interchange to Higashine Interchange, with a future extension to the city of Obanazawa planned. [cite web| url= http://www.e-nexco.co.jp/open_schedule/tohoku/ | title= E-NEXCO Planned Routes | accessdate= 2008-04-14 ] North of Obanazawa, various expressway-standard roads (bypasses of National Route 13) make up the remaining distance to the city of Yokote in Akita Prefecture.

The route of the expressway parallels the Ōu Main Line of East Japan Railway Company for most of its length.

The speed limit is 70 km/h along the entire route.

List of interchanges and features

* IC - interchange, JCT - junction, BR - bridge, TB - toll gate

* Yonezawa-kita IC - Nan-yō Takahata IC : Yonezawa Nan-yō Road

References

External links

*ja icon [http://www.e-nexco.co.jp/ East Nippon Expressway Company]


Wikimedia Foundation. 2010.

Игры ⚽ Нужен реферат?

Look at other dictionaries:

  • Chūō Expressway — 中央自動車道 Ro …   Wikipedia

  • Yamagata Expressway — Infobox road highway name = Yamagata Expressway (山形自動車道) marker length = 136.6 km [cite web| url= http://www.e nexco.co.jp/more expressway/data/ | title= E NEXCO Expressway Data | accessdate= 2008 04 13 ] established = 1981 [cite web| url=… …   Wikipedia

  • Chūō-ku, Niigata — Location of Chūō ku in Niigata City View of the Furumachi …   Wikipedia

  • Nihonkai-Tōhoku Expressway — 日本海東北自動車道) Route information Maintained by East Nippon Expressway Company …   Wikipedia

  • Nagano Expressway — 長野自動車道 Route information Maintained by East Nippon Expressway Company and Central Nippon Expressway Company …   Wikipedia

  • Ken-Ō Expressway — Ken O at North Hachioji The Ken O Expressway (圏央道 …   Wikipedia

  • Chūbu-Ōdan Expressway — sign Chūbu Ōdan Expressway Route information Existed: 2002[1] – present Major junctions From …   Wikipedia

  • Hokkaidō Expressway — 道央自動車道 Route information Length: 413.6 km (257.0 mi) …   Wikipedia

  • Dōtō Expressway — 道東自動車道 Route information Length: 258.0 km[2] …   Wikipedia

  • Shuto Expressway — Metropolitan Expressway Co., Ltd. 首都高速道路株式会社 Type Public Industry Transportation Founded 2005 …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”