Building Commissioning

Building Commissioning

Building Commissioning is the process of ensuring, in new construction, that all the subsystems for HVAC, Plumbing, Electrical, Fire/Life safety, and Building Security are operating as intended by the building owner and as designed by the building architects and engineers. Building commissioning is a quality assurance process for the complexity of modern construction projects. Normally the commissioning firm is involved from project initiation to project completion. While the service methodology can vary from firm to firm and project to project, the basic formula for successful building commissioning involves a synergy of pre-construction review of design documents for compliance with the Owner's Performance Requirements (OPR), periodic site observations during the construction phase, and systems performance testing as the project nears completion. While the practice of building commissioning is still fairly new in the construction industry, it has quickly become common practice as savvy building owners and developers have seen substantial returns on their investment. The ultimate goal of the commissioning provider is to deliver for the owner a project that is on schedule and under budget, and a building with fully operational and optimized systems on day one.

System Degradation

Just as a piano goes "Out of Tune", so do the systems that control a building. It is estimated by [http://esl.eslwin.tamu.edu/continuous-commissioning-.html Texas A&M researchers] that as much as 20% [ [http://esl.eslwin.tamu.edu/continuous-commissioning-.html Texas A&M System Energy Systems Lab - Continuous Commissioning® ] ] of the energy used in an average commercial building is waste associated with poorly commissioned systems.

Buildings systems underperform for several reasons:
# They were never properly configured
# The design did not account for all sources of building efficiency
# The building is not properly maintained
# The use of the Building has changed over time

Real Time Building Management

With as much as 20% of buildings' energy being wasted, building owners are looking for solutions to understand on a real time basis when a building is underperforming.

ee also

*Load management for balancing the supply of electricity on a distribution network.

References

External links

* [http://www.bcxa.org/ Building Commissioning Association]
* [http://esl.eslwin.tamu.edu/ Texas A&M Energy Systems Lab]
* [http://www.commissioning.org/ AABC Commissioning Group (ACG)]
* [http://www.bathgroup.com/ Bath Commissioning Corporation (BCC)]


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • New-construction building commissioning — Building commissioning is the process of verifying, in new construction, that all the subsystems for HVAC, plumbing, electrical, fire/life safety, building envelopes, interior systems (example laboratory units), cogeneration, utility plants,… …   Wikipedia

  • Commissioning management systems — Commissioning can be defined as the process of assuring that all systems and components of a building or industrial plant are designed, installed, tested, operated, and maintained according to the operational requirements of the owner or final… …   Wikipedia

  • Building regulations in England and Wales — Building regulations are statutory instruments that seek to ensure that the policies set out in the relevant liegislation are carried out and Building regulations approval is required for most building work in the UK. Building regulations that… …   Wikipedia

  • Building Schools for the Future — (BSF) is the name of the UK Government s investment programme in secondary school buildings in England. The program is very ambitious in its costs, timescales and objectives, with politicians from all parties supportive of the principle but… …   Wikipedia

  • Building life cycle — refers to the view of a building over the course of its entire life in other words, viewing it not just as an operational building, but also taking into account the design, installation, commissioning, operation and decommissioning phases. It is… …   Wikipedia

  • Commissioning —   The process by which a power plant, apparatus, or building is approved for operation based on observed or measured operation that meets design specifications …   Energy terms

  • Green building in the United States — The United States has established several sustainable design organizations and programs in green building.The U.S. Green Building Council (USGBC) is a non profit trade organization that promotes sustainability in how buildings are designed, built …   Wikipedia

  • National Building Code of Canada — The National Building Code of Canada is the model building code of Canada. It is issued by the Institute for Research In Construction (IRC)],[1] a part of the National Research Council of Canada. As a model code, it has no legal status until it… …   Wikipedia

  • Ariel Rios Federal Building — The Ariel Rios Federal Building is located in the Federal Triangle in Washington, D.C., across 12th Street from the Old Post Office, which the new building was designed to replace. The New Post Office, as the Rios Building was originally known,… …   Wikipedia

  • ESCo — An ESCO, the acronym for Energy Service Company, is a professional business providing designs and implementation of energy savings projects that allow building owners to perform projects to upgrade their building assets. The ESCO performs an in… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”