- Ashbourne Line
The Ashbourne Line was a
railway fromBuxton via Ashbourne toUttoxeter . It was built by theLondon and North Western Railway using a section of theCromford and High Peak Railway (C&HPR) and it joined theNorth Staffordshire Railway at Ashbourne, proceeding to Uttoxeter with a junction onto the main line atRocester .Origins
Although the country between Buxton and Ashbourne was sparsely populated, and the terrain immensely difficult, there were a number of motivations for its construction. Ashbourne was one of the few large settlements in the area without a railway connection until the North Staffordshire Railway built its branch from the Churnet Valley line in
1852 . Meanwhile a lucrative trade inlimestone was building up and the LNWR's only route southwards was through theManchester area. Finally, and not least, theMidland Railway was threatening to take over the Derbyshire business through its attempts to reach Manchester from Derby via Buxton.The LNWR sought to consolidate its position by building a line southwards across the Midland's path. Both railways had arrived at Buxton almost simultaneously in
1863 , with termini adjacent to each other (and Buxton lost its chance to be served by a mainline railway).The LNWR had leased the Cromford and High Peak in
1861 and in1874 it gained permission to link Buxton with the C&HPR, which it had leased in 1862, at Hindlow Junction just south of Harpur Hill. At the other end, it would build High Peak Junction nearCromford . After some delay, a further bill was sought in1887 which, in addition, allowed the complete takeover of the High Peak line. Services began to Parsley Hay in1894 .Meanwhile the North Staffordshire Railway had extended into Ashbourne from its
Churnet Valley Line in1852 The section from Parsley Hay to Ashbourne was opened in
1899 at a new station built jointly by the NSR and the LNWR. The Station Hotel (now called The Beresford Arms) dates from this time.Construction
Buxton station having been built as a terminus facing north it was first necessary to proceed around a tight 180 degree curve over Hogshaw Viaduct, with a gradient as steep as 1 in 62, to the station at Higher Buxton. On leaving the town the line passed over Dukes Drive Viaduct, and then climbed steadily at 1 in 62 to Beswick's Sidings. The gradient eased from there to
Hindlow , where the line joined the CHPR. It then climbed once more at 1 in 60 to the summit of the line atDowlow , a height of 1260feet above sea level, making it the highest public line in England at that time. This section still exists, serving various lime works at Hindlow and Dowlow. [Jacobs, G., (Ed.) (2005) "Railway Track Diagrams Book 4: Midlands and North West," Bradford-on-Avon: Trackmaps]From there the line fell at 1 in 60 to
Hurdlow (for Longnor andMonyash ), but then the gradient eased considerably to Parsley Hay, where it left the CH&PR. From there to Ashbourne the line was single and although the line was initially fairly level it included a number of tight curves. The next stop wasHartington , where after about a couple of miles the line began to fall steeply again at 1 in 60 throughAlsop en le Dale ,Tissington ,Fenny Bentley , where there was a goods depot, andThorpe Cloud , and finally through a tunnel to Ashbourne.It can be seen that the gradients and curves meant that it was always a difficult line to work, particularly during winter when it was exposed to the elements on the high moors. By contrast, the line from Ashbourne southwards was relatively easy, following river valleys as it did, first the Henmore Brook and then the River Dove.
History
There were regular trains from Ashbourne to Derby.
Baedeker for 1890 gives the following information: "Railway from Ashbourne to Derby, 30 M., in 1¼-2 hours (fares 2s.6d., 2s., 1s.3d.) - 5M Norbury with a highly interesting church (14-15cent; fine stained-glass) and an ancient manor house - At 7M Rocester(rail, refreshmt rooms) the pretty 'Churnet Valley line' diverges to the right; the first station on it is (3½M) Alton - 11M Uttoxeter 19M Tutbury - 30M Derby" [Baedeker's Great Britain 1890 (reprint Moretonhampstead: Old House Books)]Once the line to Parsley Hay was open in 1899, there were six trains a day between Buxton and Ashbourne, but the expected expresses were no more than through coaches being attached to London trains. [Anderson, P.H., (1985 2nd ed) "Forgotten Railways Vol 2: The East Midlands," Newton Abbot: David and Charles] Nevertheless it was valuable for freight, not only minerals, but milk and other farm produce. Moreover it became a lifeline during the winter snowstorms: two years after the line opened, a train of six-wheeled carriages became derailed by the snow and was marooned for three days, during which time the crew were given hot food and drinks by local farmers. This cameraderie ensured that the trains would always get through somehow.
Throughout its existence It served townsfolk who wished to explore the countryside, and country folk who wanted to visit town. Even after regular passenger services finished in 1954, specials and excursions of various kinds continued until 1963.
In the same year, freight traffic finished between Ashbourne and Hartington, to Rocester in 1964, from Hartington to Parsley Hay in October 1967, and to Hindlow the following month.
Preservation
Although all trace of the old NSR lines has practically disappeared, the track bed from Ashbourne to Parsley Hay was acquired by
Derbyshire County Council and thePeak National Park for a cycle and walking route. This, theTissington Trail , was one of the first of such ventures in the country. Later, Ashbourne Tunnel was acquired bySustrans .References
Bibliography
* Kingscott, G., (2007) "Lost Railways of Derbyshire," Newbury: Countryside Books
* Bentley, J.M., Fox, G.K., (1997) "Railways of the High Peak: Buxton to Ashbourne (Scenes From The Past series 32)," Romiley: Foxline Publishing
Wikimedia Foundation. 2010.