Bowesfield Works was a
railway locomotive manufacturing plant inStockton-on-Tees . The works was operated by a joint venture company called Metropolitan Vickers-Beyer Peacock from 1949 until 1960.Works history
Metropolitan-Vickers andBeyer, Peacock & Co. formed a joint venture company in November 1949 to design and manufacture diesel, electric and gas turbine locomotives. Because Beyer, Peacock’sGorton works was still busy producing steam locomotives, an alternative site for the new locomotives to be built had to be found. A former Government built factory at Yarm Road,Stockton-on-Tees , on which Metrovicks had acquired a lease in 1947, was chosen as the location. The factory which had been built duringWorld War II , was almost brand new, and covered an area of around convert|95000|sqft|m2, later extended to over convert|125000|sqft|m2 by Metrovicks. The works had its own railway siding running from Bowesfield Junction to the north east of the works. Initially the factory was used by Metrovicks for steel fabrication work before locomotive manufacture began in 1949.Locomotives built
Brazil
The first locomotives built at the works were fourteen electric locomotives for the
Rede Mineira de Viação railway company ofBrazil . They were convert|1072|hp|kW,Bo-Bo , RailGauge|1000|al=on gauge locomotives. This was followed by another order for ten similar locomotives forRede de Viação Paraná-Santa Catarina , Brazil.Australia
In 1954–55, the works built forty New South Wales 46 class electric locomotives for
New South Wales Railways inAustralia , along with the forty-eightWAGR X class diesel electric locomotives built forWestern Australian Government Railways , during 1953–56.British Railways
The only locomotives built for
British Railways at the works, were the twenty BR Class 28 diesel electrics during 1958-59, and the experimental 25kV AC locomotive E1000 which was built by converting the gas turbine locomotive E18100. Work commenced in January 1958 when E18100 was brought to Bowesfield Works from storage atDukinfield Works . The conversion of E18100 involved the removal of thegas turbine unit, generator and the middle traction motor from each bogie, which changed the locomotive from aCo-Co to anA1A-A1A wheel arrangement. The necessary electrical equipment such as thetransformer ,mercury arc rectifier s and pantograph etc. was installed, with the work completed by October 1958.National Coal Board
In addition to building mainline locomotives, the works also constructed twelve Metropolitan-Vickers DBF type, RailGauge|3ft gauge, battery powered under ground mining locomotives for the
National Coal Board during 1959.outh Africa
The last locomotives built at the works was a batch of one hundred class 5E1 electric, convert|2280|hp|kW,
Bo-Bo , RailGauge|3ft6in gauge locomotives forSouth African Railways and Harbours during 1958–60.Closure
In December 1960, it was announced that the works was facing closure due to a lack of orders, and in February 1961, the Metropolitan-Vickers-Beyer Peacock joint company was placed into voluntary liquidation. The works was closed shortly afterwards and the workforce made redundant.
The site today
The factory building is still extant, having been taken over by the Visqueen company, a manufacturer of
polythene films, which is now part of the British Polythene Industries group.Reference sources