extra=RockGen Energy Center is a 460 megawatt
natural gas firedpeaking power plant located nearRockdale, Wisconsin . According to Calpine, it was the largest peaking plant in Wisconsin at the time it was constructed.Construction
In July 1998, the town of Christiana was announced as one of the possible sites for a new peaker plant in Wisconsin. The site is just east of a limestone
quarry and west of a largeelectrical substation on land previously used forrow crop farming. Shortly after the announcement, an opposition group named "Responsible Use of Rural and Agricultural Land" (RURAL) was formed to block its construction. Other sites were ruled out as more expensive and the decision was made to proceed at the Dane county location west of Rockdale. Starting in January 1999, several lawsuits were filed by RURAL and the village of Rockdale to block the construction and invalidate the air permit. TheEnvironmental Protection Agency declined to overturn theWisconsin Department of Natural Resources issued air permit. In March 2000, tensions were high and gunshots were fired at a nearby electrical substation damaging a transformer and circuit breaker. No one was ever charged in the incident, but it was considered to be connected to the construction dispute by police. Construction began in April 2000, ten months behind schedule. In December 2000, theWisconsin Supreme Court ended the remaining challenge allowing construction to finish. In May 2001, the $190 million facility was completed. ["Timeline for the Rockgen Power Plant". Ron Larson, State Journal library director. "Wisconsin State Journal". Madison, Wis.: May 6, 2001. pg. F.2]Around the same time period, the announcement of plans for generating stations near Edgerton (just south of the Dane / Rock county line) and Sturtevant in Racine County, "generated huge public outcry." ["Reliable, Affordable Energy is a Must". Brenda Blanchard. "Wisconsin State Journal". Madison, Wis.: Dec 3, 2000. pg. B.3] ["Edgerton Council Turns Down Power Plant Residents Show Up In Droves To Oppose The Site, Telling Calpine "To Go Back To California"." Beth Williams Wisconsin State Journal. "Wisconsin State Journal". Madison, Wis.: Sep 6, 2000. pg. 1.A] Those plans were quickly scrapped and as of 2008, no other power plants have been constructed in Dane County. Calpine would later construct
Riverside Energy Center , a larger base load,combined cycle natural gas fired plant farther south in Rock County in the town of Beloit.Operation
The facility began operation May 2001. In February 2003, there was a fire that placed one of the turbines temporarily out of service. The fire was caused by a high pressure air line breaking loose and catching insulation on fire. It was extinguished by plant workers with a hand-held extinguisher and local emergency crews responded without lights or sirens. ["Fire Hits Rockgen Power Plant." Mike Ivey The Capital Times. "Madison Capital Times". Madison, Wis.: Feb 11, 2003. pg. 2.A]
Chapter 11
Starting in 2006, the continued operation of the facility was in doubt due to the
Chapter 11 filing by parent company Calpine. CIT Group, one of Calpine's creditors, took control of the facility and considered closing it in 2007, but it remained operational through the peak generating season. ["Power plant may not shut down; Delay sought for switch in management" Thomas Content. "Milwaukee Journal Sentinel". Milwaukee, Wis.: Jul 1, 2006. pg. D.3]Natural gas prices greatly increased after the facility was constructed affecting its profitability.ee also
*