- Whitewood mine
Whitewood is an Albertan
coal mine located just north of Lake Wabamun, about sixty-five kilometres west ofEdmonton , Alberta. Owned by the TransAlta Corporation ofCalgary , the mine has been run byLuscar Ltd. (Edmonton) since that company acquired the extraction contract fromFording Coal Ltd. (Calgary) in 2003.History
Opened in 1962, the Whitewood mine operates on a "strip" model, harvesting approximately 2.8 megatonnes of sub-bituminous coal per annum. Most of this thermal coal is used for steam-driven power generation at the Wabamun, Sundance, and Keephills power plants, but a small amount of coal is sold to the residents of Parkland County for personal uses.
Geology
Development of the mining site at Whitewood and the seismic testing done there in the 1980s have allowed geologists to establish the timeframe and geologic phases associated with the formation of the mine's coal bed. Analysis has shown that there are six distinct coal seams present at Whitewood, with deposits from the late
Cretaceous found at the deepest intervals, and with Early Tertiary formations found closest to the top.A few layers of bentonitic gangue appear throughout the coal, most notably a three-metre seam near the uppermost portion of the late Cretaceous zone. Above the twenty to seventy metre thick coal-bearing deposit lies a glacial till several metres deep; this must be removed from the surface before mining of the coal below can begin.
Coal Extraction and Uses
The Whitewood mine covers approximately 4700 hectares of slightly hilly
prairie , with locales offorest andwetland interspersed throughout. The 2'800'000 tonnes of coal mined there each year act as enough fuel to fulfil approximately 13% of Alberta's electrical energy requirements. As a strip-surface mine, Whitewood employs the use of heavy equipment — excavators, loaders/shovels, dumpers, and the like — to extract the coal in an efficient and cost-sensible manner. Post-mining processing includes pulverisation, to maximise thermal yields when the coal is burnt in one of the surrounding power stations.Although the present rate of extraction would allow this site's fifty-one million tonnes of reserves to be mined for more than a decade, TransAlta has plans to cease production by 2010, the same year the company will finalise the decommissioning of its coal-fired Wabamun electrical generation facility nearby. The company will continue mining coal at the massive Highvale mine five kilometres to the southwest; that mine produces 12.9 megatonnes of sub-bituminous coal per annum, has reserves pegged at over 200 megatonnes, and will be able to fuel the power plants now served by Whitewood, in addition to the Genesee power station.
Environmental Considerations
An important part of decommissioning a mine is the reclamation process that follows. TransAlta has made provisions for renaturalisation to continue as far as 2013, three years after the Whitewood mine is slated to close. Already, the coal-depleted portions of the site have been subject to rebeautification, with pits being reclaimed as lakes or being filled-in with
backfill . Much of the backfill land is now lain with local subsoils and rich topsoils, which make the land suitable for agricultural use; the other parts of the reclaimed land have been made into forests and wetlands in a way that is designed to reflect the pre-mining environment.When the mine is fully out of service, the power lines, service roads, sedimentation ponds, ditches, and other mining infrastructure will be removed, and their lands reconverted to their original forms. After the seeded vegitation takes root and grows, the mining site will hopefully show little evidence of having hosted a mine.
References
*cite web
title = TransAlta Kilowatt Connection, July 2004 ed.
url = http://www.transalta.com/transalta/webcms.nsf/AllDoc/BFA2485B74685BEE87257157004FA868/$File/KCsummer.pdf
accessdate = 2007-09-21
*cite web
title = TransAlta Kilowatt Connection, August 2003 ed.
url = http://www.transalta.com/transalta/webcms.nsf/AllDoc/5A08D6F5EFEE921887257157004FA865/$File/KCAug03.pdf
accessdate = 2007-09-21
*cite web
title = Alberta Energy and Utility Board Application No. 1271519
url = http://www.eub.ca/portal/server.pt/gateway/PTARGS_0_0_261_241_0_43/http%3B/extContent/publishedcontent/publish/eub_home/industry_zone/applications/notices/energy_issues/2002/1271519conv099.aspx
accessdate = 2007-09-21
*cite web
title = Alberta Environmental Appeals Board, Appeal No. 98-237
url = http://www.eab.gov.ab.ca/dec/98-237.html
accessdate = 2007-09-21
*cite web
title = NorWest Corp.: TransAlta Utilities Estimated Asset Retirement Obligations, 02-2249, pg. 2-4
url = http://www3.eub.gov.ab.ca/eub/dds/iar_query/ShowAttachment.aspx?DOCNUM=299476
accessdate = 2007-09-21
*cite web
last = Lyatski
first = H.V.
coauthors = D.C. Lawton
title = Application of the Surface Reflection Seismic Method to Shallow Coal Exploration in the Plains of Alberta
url = http://www.cseg.ca/publications/journal/1988_12/1988_Lyatsky_H_seismic_coal_expl.pdf
accessdate = 2007-09-21
*cite web
last = Schindler
first = David W.
coauthors = Greg Goss, Joseph Nelson, Vince St. Louis, et al.
title = Lake Wabamun: A Review of Scientific Studies and Environmental Impacts
url = http://environment.gov.ab.ca/info/library/6139.pdf
accessdate = 2007-09-21
*cite web
title = Alberta Environment: Coal Mines
url = http://www3.gov.ab.ca/env/land/quality/html/use/coal.html
accessdate = 2007-09-21
*cite web
last = Pearson
first = G.R.
title = Alberta Energy and Utilities Board Earth Sciences Report 1959-01
url = http://www.ags.gov.ab.ca/publications/ABSTRACTS/ESR_1959_01.html
accessdate = 2007-09-21
Wikimedia Foundation. 2010.