- Legacy Parkway
Infobox road
marker_
state=UT
highway_name=Legacy Parkway
section=
maint=UDOT
length_mi=11.500
length_round=3
length_ref=cite web
url=http://www.udot.utah.gov/main/uconowner.gf?n=3781032502030578832
title=State Route 67 Reference
publisher=Utah Department of Transportation
accessdate=2008-10-08
date=2008-09-29]
established=2008
direction_a=South
terminus_a=jct|state=UT|I|215 in North Salt Lake
direction_b=North
terminus_b=jct|state=UT|I|15|US|89 in Farmington
previous_type=UT
previous_route=66
next_type=UT
next_route=68The Legacy Parkway is a convert|11.5|mi|km|2|adj=on four-lanefreeway cite web | title=Legacy Parkway & Preserve | publisher=Utah Department of Transportation | url=http://www.udot.utah.gov/legacy/index.php ] completely within Davis County in the northern part of theU.S. state ofUtah that runs from Interstate 215 inNorth Salt Lake to Interstate 15 and US-89 in Farmington. Construction began in 2006 and was completed in 2008, with the freeway opening13 September of that year. The highway was controversial in its building and was challenged in court several times before a compromise was met between the state and several environmental groups such as theSierra Club .cite web |url=http://www.udot.utah.gov/legacy/overview_history2.php |title=Comprehensive History |accessdate=2008-04-19 |format=|work=] cite web |url=http://www.udot.utah.gov/legacy/overview_history.php |title=Project History |accessdate=2008-04-19 |format=|work=]Route description
The highway begins at an interchange at I-215, allowing northbound motorists from the interstate to transfer onto Legacy Parkway and vice versa. From the interchange, the highway heads northerly through western Davis County before turning northeasterly and north again, intersecting with 500 South at a
diamond interchange , which also provides a connection to Redwood Road. The freeway continues north before beginning a curve to the northeast in West Bountiful. Before reverting to its original northerly direction, the route intersects Parrish Lane at a diamond interchange. Past the intersection, the freeway parallels I-15 withUnion Pacific andUtah Transit Authority (FrontRunner ) railroad track in between. The highway reaches Farmington and terminates at a junction with I-15 and US-89.cite web | title=Wasatch Front Inset Map | publisher=Utah Department of Transportation | url=http://www.udot.utah.gov/main/f?p=100:pg:2117854713443240831::::V,T:,346 ]After a lawsuit that halted construction of the parkway over environmental concerns, the design of the road was re-envisioned to include extensive wetland protection west of the freeway and in the freeway median, a trail system, and numerous pedestrian overpasses and underpasses for ease of access to the trail system. Many of the architectural features were also specially-designed to give the freeway a more unique feel. [ [http://www.deseretnews.com/cgi-bin/cqcgi_plus/@plus.env?CQ_SESSION_KEY=QOHZAETXNZEF&CQ_CUR_DOCUMENT=2&CQ_TEXT_MAIN=YES Deseret News - Commuter relief: Legacy Parkway opens to commuters on Saturday] .
September 7 ,2008 .]The
Utah Department of Transportation has already designated the route as State Route 67 and has signed the route with SR-67 shields,cite news|url=http://www.sltrib.com/news/ci_10467673|title=Future Legacy development takes shape|last=Villaseñor |first=María|date=2008-09-15|publisher="Salt Lake Tribune "|accessdate=2008-10-08] but this has yet to be approved by theUtah State Legislature .History
The Legacy Parkway is part of the larger
Legacy Highway project, which has aspirations of running from Nephi in the south to Brigham City, with the Parkway being only a portion in between. Construction of the Legacy Parkway began in 2004 before it was forced to stop as a result of lawsuits over the completeness of theenvironmental impact statement .On
September 21 ,2005 , the State ofUtah and theSierra Club (acting on behalf of numerous groups opposing the Legacy Highway) officially signed a compromise regarding the Legacy Parkway. Some of the agreements reached include no billboards along the freeway, notruck s allowed on the freeway (excepting cases where they are used in response to an accident or there is construction on I-15), and a 55 mph (90 km/h) speed limit. These restrictions hold until 2020.Construction of the Parkway resumed in March 2006 with limited construction activity and in December 2006 heavy construction began on the Parkway. Three contractors were hired to build the freeway; therefore, construction was divided into three segments: Segment one from I-215 in North Salt Lake to 500 South, segment two north to Glover Lane, and segment three north to I-15/US-89. The project reached the halfway point in October 2007. The highway opened
13 September at a cost of $685 million.Citation
last = Boal
first = Jed
title = Legacy Parkway to open in mid-September
date = 29 July 2008
url = http://www.ksl.com/?nid=148&sid=3888335
accessdate = 30 July 2008] cite news|url=http://www.ksl.com/?nid=148&sid=3891380|title=Many commuters use FrontRunner after I-15 wreck|last=Adams|first=Andrew|coauthors=Adam Thomas|date=2008-07-30|publisher=KSL.com|accessdate=2008-07-31]Exit list
The entire route is in Davis County.