homepage = [http://www.advantagewm.co.uk www.advantagewm.co.uk] [http://www.sstaffs.gov.uk/Default.aspx?page=13311 www.sstafs.gov.uk] [http://www.wolverhamptoncity.co.uk/content.php?c=2&cp=page/page.php&content_id=521958019210765 www.wolverhamptoncity.co.uk]i54 is a 220 acre (98 hectare) site at Wobaston Road,
Pendeford , on the boundary ofSouth Staffordshire andWolverhampton which is under development for atechnology -based business park.The site is on the northern side of Wobaston Road, just to the west of the
Staffordshire and Worcestershire Canal with theM54 motorway running across the northern part of the site.The aim
The aim of this site is to deliver major employment oppourtunites and maximise job creation potential in key industries. It will also play a key role in the diversification and growth of the regional economy. It is also believed that i54 will achieve high standards of sustainability.
The regeneration project is a flagship join venture between
Advantage West Midlands andWolverhampton City Council with the support of South Staffordshire Council.Project costs and details
The cost of the project to the 98 hectare site is estimated to be costing £67 million
GBP and was granted crucial planning approvals from two local authorities in September 2006.In August 2006 contractors to the site started the second major phase of the scheme, a £5 million
GBP 12 month programme of infrastructure and reclamation work.On Tuesday
3 July 2007 key partners for the project toasted the substantial completion of a £10 millionGBP programme of remmediation and site preparation works on the i54 site. The site preparation work ran over a 16 month period and has been carried out by Blackwell and supervised byMouchel Parkman engineering consultancy. During this time the following was achieved:* Produced level development plots
* Installation of primary infrastructure including a spine road
* Drainage Systems
* Site fencing
* Creation of new wetland and ecological habitatsOther statistics include:
* 152,000 cubic meters of topsoil has been excavated but retained on site.
* 190,000 cubic meters of sub-soil and rock excavated and reused on site.
* 1 kilometre spine road constructed
* 4.5 kilometres of fencing erected "(3 kilometres still to be erected)"
* Total of 6,500 cubic metres of ponds and swales created as part of the landscapingProspective tennants
There have not been many details released as yet about the tennants of the technology park, however it has been rumoured that the
University of Wolverhampton maybe having atechnology centre on the site. It is also rumoured that the first development plot on the site could be ready for occupation by the Summer of 2008.Usage potential
* Around convert|2000000|sqft|m2|-3 of industrial space
* of commercial/retail and leisure.Previous use
The i54 site was a former sewage treatment works which was not used for many years.
References
* [http://www.advantagewm.co.uk/what-we-do/improving-places/land-and-property/occupier-opportunities/i54.aspx Advantage West Midlands - i54]
* [http://www.advantagewm.co.uk/news-media-events/news/2007/07/i54-development-a-giant-step-closer-to-reality.aspx i54 development a giant step closer to reality]
* [http://www.advantagewm.co.uk/news-media-events/news/2006/08/5-million-scheme-brings-i54-one-step-closer-to-reality.aspx £5 million scheme brings i54 one step closer to reality]
* [http://www.sstaffs.gov.uk/Default.aspx?page=13311 South Staff Council - i54]
Wikimedia Foundation. 2010.