- USS S-48 (SS-159)
USS "S-48" (SS-159) was the first submarine in the fourth group of "S"-class submarines of the
United States Navy . Her keel was laid down on22 October 1920 by theLake Torpedo Boat Company inBridgeport, Connecticut . She was launched on26 February 1921 sponsored by Mrs. James O. Germaine.On
7 December , the uncommissioned submarine conducted a dive offPenfield Reef inLong Island Sound as part of builder's trials. A manhole plate in one of the aft ballast tanks was left unsecured, several aft compartments flooded, and "S-48" sank in 60 feet of water. The crew, contractor's personnel, and naval observers brought the bow to the surface and escaped through a torpedo tube to a tug which took them toNew York City .On
20 December , the submarine was raised and taken back to the builder's yard where repairs were begun. The work was completed ten months later; and, on14 October 1922 , "S-48" was accepted by the Navy and commissioned at Bridgeport with Lieutenant S. E. Bray in command.Following commissioning, "S-48" fitted out at the
New York Navy Yard ; visitedPeekskill, New York , forNavy Day ; returned to Bridgeport, and, at the end of October, arrived at her home port,New London, Connecticut . Two weeks later, she was towed to thePortsmouth Naval Shipyard inKittery, Maine , for further yard work; and, in late January 1923, she returned to New London to commence operations with her division, Submarine Division 4 (SubDiv 4). Through May, she operated in the New London area; then, in early June, she moved south for sound exercises and a visit toWashington, DC . At mid-month, she returned to southernNew England ; and, in August, she proceeded back to Portsmouth for the installation of new crankshafts and a general ship and machinery overhaul period.In mid-January 1924, "S-48" departed Portsmouth for New London, whence she continued south, to the
Caribbean Sea , for winter maneuvers. By mid-March, however, she was back at Portsmouth for another five months of yard work. In early August, she resumed operations in the New London area, and, in November, after being transferred to SubDiv 2, she visitedAnnapolis, Maryland . In December, she returned toConnecticut , and, toward the end of January 1925, she headed back to Portsmouth.On the night of
29 January , "S-48" arrived off theNew Hampshire coast. At about 1830, the wind picked up and a heavy snowstorm developed. Visibility was reduced to zero. Soon after 1934, theS-boat grounded on rocks offJeffrey Point ; pulled herself off; then grounded again inLittle Harbor . Messages requesting assistance were dispatched. By midnight, the storm had worsened, seas were coming "clean [sic] over the "S-48" and she was rolling—15 degrees to port, 60 degrees to starboard. Violent rolling lasted for only a little over thirty minutes but a heavy list developed. By 0330 on30 January , the battery compartment was taking in water.Chlorine gas was forming. The storm continued; but help arrived at 0500, and Coast Guardsmen manning lifeboats rescued the crew. After receiving treatment for exposure and gas atFort Stark , crew members were transferred to the Navy Base atKittery, Maine .On
1 February , salvage operations were begun. A week later, theS-boat was freed and towed to the navy yard for repairs. However, the damage was severe and the funds were lacking; and, on7 July 1925 , "S-48" was decommissioned. Nearly a year later, though, on25 June 1926 , repairs and alterations were authorized, and, on3 February 1927 , the work began. But, again, a shortage of funds stopped the project. In 1928, the repair and modernization was carried out. In hopes of improving habitability and increasing her range, her hull was extended 25½ feet; her displacement was increased to 1165 tons, and her engines were replaced by German M.A.N. types. On1 December , the work was finally completed. On8 December , almost four years after her accident, "S-48" was recommissioned.Assigned to SubDiv 12, she departed Portsmouth on
11 January 1929 and headed south. After operations off southernFlorida , she returned to New London in March and, in April, commenced a series of test exercises. A casualty to the main motor, however, forced postponement of the exercises, and "S-48" returned to Portsmouth. On5 June , she resumed the exercises.On
1 June , "S-48" had been reassigned to SubDiv 4, with which she operated through the end of 1929. Then assigned to SubDiv 3, later SubDiv 5, and then Squadron 3, she continued her operations off theNew England coast, with an interruption for winter maneuvers to the south. She was transferred to thePanama Canal Zone in 1931. On1 March , she arrived atCoco Solo whence she operated for four years. In July 1933, she was assigned to the Rotating Reserve; and, in 1935 she was ordered inactivated. On20 March , she departed Coco Solo. On1 June , she arrived atPhiladelphia, Pennsylvania ; and, on16 September 1935 , she was decommissioned and berthed atLeague Island .Four years later,
World War II broke out in Europe. In 1940, "S-48" was ordered activated. She was recommissioned on10 December , but remained at Philadelphia until mid-March 1941. She then moved up to her homeport of New London. As a unit of SubRon 1, she provided services to submarine and antisubmarine warfare training commands at New London andPortland, Maine , until after the end of European hostilities. Overhaul and repair periods during that time were frequent; and, in the summer of 1945, theWorld War I -design submarine was finally designated for disposal. On21 August , she departed New London for the last time. On29 August , she was decommissioned at Philadelphia; on17 September 1945 , her name was struck from theNaval Vessel Register , and, on22 January 1946 her hulk was sold to theNorth American Smelting Company in Philadelphia, for scrapping.References