- USS S-45 (SS-156)
USS "S-45" (SS-156) was a third-group ("S-42") "S"-class submarine of the
United States Navy . Her keel was laid down on29 December 1920 by theBethlehem Shipbuilding Corporation inQuincy, Massachusetts . She was launched on26 June 1923 sponsored by Mrs. Charles Hibbard, and delivered and commissioned on31 March 1925 with Lieutenant Edwin F. Cochrane in command.Early years
Completing shakedown exercises off the southern
New England coast, "S-45" departedNew London, Connecticut , on9 June 1925 . Nineteen days later, she joined Submarine Division (SubDiv) 19 atCoco Solo , Canal Zone, and commenced type exercises and jointUnited States Army -United States Navy maneuvers in thePanama Canal area. During the next two years, only Fleet Problems VI and VII took her out of her normal operating area. In May 1927, theS-boat moved northwest toMare Island for overhaul, then began operations out ofSan Diego, California .The following spring, "S-45" participated in
Fleet Problem VIII , a convoy and antisubmarine search and contact problem conducted en route betweenSan Francisco, California , andHonolulu, Hawaii . During the winter of 1929, she returned to the Panama Canal Zone forFleet Problem IX .In December 1930, "S-45" was transferred a third time; and, on
12 December , she arrived at her new home port,Pearl Harbor , whence she operated, with SubDiv 11, on a schedule of exercises and fleet problems similar to those followed previously for the next year and one half. In September 1932, she joined Rotating Reserve Division 14 and, for the next several years alternated active service with Division 11 and reserve status in Division 14.In March 1936, the boats of SubDiv 11 were ordered back to
Panama . They participated inFleet Problem XVII en route and arrived at Coco Solo, their new home port, on22 May . For the next four years, they maintained a schedule similar to previous tours in the Canal Zone.With the new decade, 1940, and the expansion of hostilities in Europe and Asia, the schedule was varied. Exercises and patrols in the vital canal area were stepped up, and plans were made to overhaul and modernize the old S-boats. On
15 May 1941 , "S-45" got underway forPhiladelphia, Pennsylvania . There, she received new equipment, exclusive of air conditioning, and a complete overhaul. By August, she was off the New England coast for simulated war patrol exercises, and, in October, she moved south toBermuda for patrol and antisubmarine warfare training duties.First two defensive patrols
After the
7 December attack on Pearl Harbor , "S-45" returned to Panama and assumed patrol duties in the approaches to the canal. By1 February 1942 , she had conducted two defensive patrols, during which her crew became even better acquainted with the defects in thetorpedo es she carried and with the limited wartime capabilities of boats of her class.Then, as the Japanese thrust toward
Australia continued, the Panama S-boats prepared to assist in defensive efforts in the southwestern Pacific. In March, "S-45" and her division, now SubDiv 53, headed west. In mid-April, they arrived atBrisbane ,Queensland ; and, on12 May , "S-45" departedMoreton Bay on her first offensive war patrol.First war patrol
Assigned to the Bougainville-Buka-New Ireland area, she remained on patrol into mid-June, unable to score against Japanese shipping and unable to contact an agent on
Cape Sena . On19 June , she returned to Brisbane, where an overhaul brought the installation of temporary air conditioning and corrected some of the defects in the engines, the radio transmitter, and the bow planes which had hampered her during her recent patrol. On26 August , she headed back to theSolomon Islands . By the end of the month, she was on station in theShortland Island area. Numerous targets were sighted; but, due to frequent squalls and her own limitations, she was unable to press home an attack.Second war patrol
On
5 September , she was ordered to theTrobriand Islands to intercept enemy shipping bound forMilne Bay , but her luck was no better there.On
12 September , "S-45" sighted, closed, and attempted to fire a bow shot at acruiser . As the outer doors were opened, she became heavy forward, and depth control was lost. Periscope depth was soon regained but could not be held. The sound operators lost the target in "S-45"’s own noises; and, by the time control was regained, the target had passed firing bearing. The submarine swung to a new track to pursue. Depth control was again lost. Another battle for control of the boat was won but too late for "S-45" to score.Third war patrol
"S-45" returned to Moreton Bay on
23 September . By27 October , she was back in theShortland Island area and, on2 November , her presence nearFauro Island was detected by the enemy. Explosions were heard, but none was close. The next morning, prior to daylight, she was sighted by adestroyer as she was preparing for a surface shot.The destroyer swung left to ram; "S-45" swung right, submerged, and rigged for depth charging. Within minutes, the explosions, close aboard portside, were felt. Varying her depth and course, the S-boat reached 200 feet (60 m). Her evasive maneuvering was successful, and she retired south. The destroyer continued to circle on the surface near the initial contact point. By daylight, a second destroyer had joined the first; and, for the next three hours, the two surface ships were heard, alternately close, then fading out. After 0930, no further pinging was heard. Little damage had been done, but pressure in the boat was high, a result of blowing and venting tanks. The high pressure, in turn, caused the depth gauge to register low.
By
4 November , poor weather had set in; and, on6 November , the boat cleared the area, setting course forSuva and thePanama Canal . Arriving at the latter on6 January 1943 , she underwent voyage repairs, then received orders toSaint Thomas, United States Virgin Islands , for training duty. On arrival, she was ordered back to Coco Solo, whence she continued on to San Diego and a three-month tour with theWest Coast Sound School . Overhaul followed, and on19 November , she got underway for theAleutian Islands .Fourth war patrol
"S-45" arrived at
Dutch Harbor on2 December 1943 . Training and minor repairs occupied the remainder of the month; and, on31 December , she departed the eastern Aleutians for Attu. There, she topped off and continued on to theKuril Islands , encountering strong winds and heavy seas as she moved west. On12 January 1944 , she lost her antennae in a storm and, on13 January , she arrived in her patrol area, theOminato -Paramushiro convoy routes.Hunting was again poor; and, on
28 January , she returned to Attu. Two days later, while charging batteries, she suffered an explosion in the after battery compartment. By10 February , the debris had been removed and temporary repairs had been made. The next day, she moved east, arriving at Dutch Harbor on14 February . From there, she returned to San Diego, completed repairs, then got underway, in June, to cross the Pacific. From mid-July to the end of the year, she conducted training exercises from Manus in theAdmiralty Islands ; then moved to Brisbane for repairs preparatory to returning toCalifornia .Retirement
"S-45" arrived back at San Diego in early April 1945 and resumed operations for the
West Coast Sound School . In September, after the formal end ofWorld War II , she moved up to San Francisco where she was decommissioned on30 October 1945 . Her name was struck from theNaval Vessel Register on13 November 1945 ; and in December 1946, her hulk was sold for scrapping to theSalco Iron and Metal Company of San Francisco.References
*
Wikimedia Foundation. 2010.