- John S. Eastwood
John S. Eastwood (born 1857,
Minnesota , died 1924,California ) was an Americanengineer who built the world's first reinforced concrete multiple arch dam onbedrock foundation atHume Lake ,California , in 1908.Born to Dutch ancestry in 1857, Eastwood attended the
University of Minnesota as acivil engineering student; prior to graduation in 1880 he headed west to work on railroad construction projects in thePacific Northwest . In 1883, he moved toFresno, California and established an office as civil engineer and surveyor. He became Fresno's first City Engineer in 1885, but apparently was not well suited for office/bureaucratic life and soon resigned. For the remainder of his career he focussed on work within the private sector or as a consulting engineer.Early in 1895, he became chief engineer of the
San Joaquin Electric Company , and was responsible for the design and construction of one of California's early hydroelectric plants. As described by George Low in the April 1896 "Journal of Electricity", Eastwood employed the nascent technology of long-distancealternating current power transmission in creating a hydroelectric power system for the Fresno area. Unfortunately, the financial capabilities of the company proved insufficient to meet the great cost of constructing the dam in the remote reaches of the mountains, and, as a result, Eastwood was forced to rely on an undammed, natural supply of water to drive theturbine s and generators. It was this inability to impound and store runoff that led to the demise of the San Joaquin Electric Company in 1899 after a long drought dried up the North Fork of theSan Joaquin River and brought the company's power production to a standstill.Shortly thereafter, Eastwood became engaged with the
Pacific Light and Power Company as engineer in charge of designing a large hydroelectric project on the South Fork of the San Joaquin River. This has since become known as theBig Creek Complex presently operated by the Southern California Edison Company. The Pacific Light and Power Company was controlled by the famous financier and electric railroad magnate,Henry Huntington . Eastwood had great hopes for the Big Creek project, and he planned it to include storage dams to insure that a drought could not stop its power production.Although Big Creek was for the most part designed prior to 1907, financial difficulties associated with the
Panic of 1907 delayed Huntington's ability to initiate construction for several years. While designing the Big Creek project, Eastwood had devised an inexpensive type of reinforced concrete dam design which minimized the amount of material required and, consequently, reduced construction costs. In 1908, while waiting for work on Big Creek to begin, he designed and built theHume Lake Dam for theHume-Bennett Lumber Company . This structure is located in the Sierra Nevada about forty-fivemile s south of Big Creek, and it s completion in 1909 demonstrated the practicality of the multiple arch design. Shortly thereafter, Eastwood received the contract for the design of a multiple arch dam to supersede the 1884Big Bear Valley Arch Dam near San Bernardino in Southern California.Eastwood envisaged the use of multiple arch dams in the construction of the Big Creek project, but these hopes where dashed when, in November 1910, he was dismissed from all association with the project. Although he was awarded 5,400 shares stock in the newly formed Pacific Light and Power Corporation (which was legally distinct from the earlier PL&P Company), this financial interest soon disappeared when in the summer of 1912 Huntington, as majority stockholder, assessed all owners of Pacific Light and Power Corporation stock $5 per share to help pay for the construction of Big Creek. Unable to pay the assessment ($27,000) on his stock, Eastwood was forced to relinguish his stake in the PL&P Corporation. Following this abrupt separation from the Big Creek project at the age of 53, Eastwood was left with only modest financial holdings and, as a means of survival, he began actively pursuing a career devoted to the design of multiple arch dams.
In the early 20th century,
Salt Lake City regularly experienced severe water shortages in mid-winter and late summer. To alleviate this, bonds were floated in 1914 to finance the construction of three storage dams, the largest beingMountain Dell Dam inParley's Canyon , ten miles east of the city, that was built in two stages from 1914 to 1925.Earlier, Eastwood had built four dams in California and his reputation as dam designer was growing. He had written several articles in "
Western Engineering " describing hisBig Bear Valley Dam ,Los Verjeles Dam (inYuba County, California ) andKennedy Dam (inJackson, California ), and had also published a four page promotional "supplement" distribution with copies of the March 1915 "Western Engineering".Following the initial construction of Mountain Dell Dam, Eastwood continued his career in water resource development and dam design, becoming involved in projects in California,
Idaho ,Arizona ,Mexico , andBritish Columbia .He was not an "armchair engineer", and he spent much of his life in the field working on practical problems of water control. He worked as a practicing engineer until the end of his life, when, in August 1924, at the age of 67, he drowned while swimming in the Kings River east of Fresno.
The Eastwood powerhouse at
Shaver Lake, California was named after him. Built in 1987, the 200-MWpumped storage hydroelectric plant is located underground and was carved out of solid granite.External links
* [http://www.lib.berkeley.edu/WRCA/eastwood.html Library of University of California, Berkeley]
* [http://www.sierrahistorical.org/archives/eastwood.html Historical Accounts of the Central Sierra]
* [http://ww2.lafayette.edu/~jacksond/ultdam.html Building the Ultimate Dam: John S. Eastwood and the Control of Water in the West] , Donald C. Jackson, University Press of Kansas, 1996 ISBN 0-7006-0716-1
Wikimedia Foundation. 2010.